The Canada Centre Building is a 12-storey postmodern federal government office building in the Scarborough district of Toronto. It is located at 200 Town Centre Court, between the Scarborough Civic Centre and Scarborough Town Centre shopping mall, and next to Scarborough Centre station. The building houses offices of Service Canada, Employment and Social Development Canada, Passport Canada and the Canada Revenue Agency, providing services for Scarborough and Central Ontario. Opened in 1985, the building is most notable for its energy-conservation systems, which include one of the first successful full-scale applications of aquifer thermal energy storage (ATES).
The building was designed by architects Moriyama and Teshima with a postmodern influence reflective of the surrounding public buildings. It is situated at the western side of a 2.2ha rectangular property and is twelve stories tall, with the lower two levels reserved for parking. The building provides of office space to accommodate 1,900 office workers. Its distinctive roofline is replicated in a blue-framed galleria structure which provides a pedestrian walkway between Scarborough Centre station and Albert Campbell Square.
The building was constructed during 1983–1985. While excavating and drilling for the foundations in 1980–81, two potential aquifers were found, allowing an ATES system to be integrated into the design. The system uses four 60adj=midNaNadj=mid production wells supplying of groundwater, with an additional fifteen observation wells on the property. It was set up as a full-scale research facility with $200,000 of scientific instrumentation to monitor its operations, which began in 1985.
In addition to the ATES, the building's heating and cooling systems include of roof-mounted solar heat collectors, forced-draft cooling towers, centrifugal chillers, plate heat exchangers, electric boilers, and concrete storage tanks. A large computing facility was added in 1986–87 to control and monitor these systems, selecting the most efficient usage. In 1989, the chillers were converted to heat pumps to meet cooling demand due to increased occupancy. Following this conversion, annual energy purchases were about 250 kWh per square metre or 5000 kWh per workplace.
Engineering firm H. H. Angus and Associates received a 1986 Award of Excellence (mechanical) from Canadian Consulting Engineer magazine for their contributions to the design and implementation of the Canada Centre's energy systems. A 2021 study identified the Canada Centre Building for heritage consideration due to its design and association in the context of the growth of the Scarborough Civic Centre location.