Gerald R. Ford-class aircraft carrier explained

The Gerald R. Ford-class nuclear-powered aircraft carriers are currently being constructed for the United States Navy, which intends to eventually acquire ten of these ships in order to replace current carriers on a one-for-one basis, starting with the lead ship of her class, (CVN-78), replacing, and later the carriers. The new vessels have a hull similar to the Nimitz class, but they carry technologies since developed with the CVN(X)/CVN-21 program,[1] such as the Electromagnetic Aircraft Launch System (EMALS), as well as other design features intended to improve efficiency and reduce operating costs, including sailing with smaller crews.[2] This class of aircraft carriers is named after former U.S. President Gerald R. Ford.[3] CVN-78 was procured in 2008 and commissioned into service on 22 July 2017. The second ship of the class,, is scheduled to enter service in 2025.

Design features

Carriers of the Gerald R. Ford class have:[4]

The biggest visible difference from earlier supercarriers is the more aft location of the island (superstructure).[13] The Gerald R. Ford-class carriers will have a reduced whole-life cost due in part to reduced crew size.[6] These ships are intended to sustain 160 sorties per day for 30-plus days, with a surge capability of 270 sorties per day.[14] Director of Operational Testing Michael Gilmore has criticized the assumptions used in these forecasts as unrealistic and has indicated sortie rates similar to the 120/240 per day of the Nimitz class would be acceptable.[15]

Development

The current in US naval service have been part of United States power projection strategy since Nimitz was commissioned in 1975. Displacing about 100,000 tons when fully loaded, a Nimitz-class carrier can steam in excess of 30kn, cruise without resupply for 90 days, and launch aircraft to strike targets hundreds of miles away.[16] The endurance of the Nimitz class is exemplified by, which spent 159 days underway during Operation Enduring Freedom without visiting a port or being refueled.[17]

The Nimitz design has accommodated many new technologies over the decades, but it has limited ability to support the most recent technical advances. As a 2005 Rand report said, "The biggest problems facing the Nimitz class are the limited electrical power generation capability and the upgrade-driven increase in ship weight and erosion of the center-of-gravity margin needed to maintain ship stability."[18]

With these constraints in mind, the US Navy developed what was initially known as the CVN-21 program, which evolved into CVN-78, Gerald R. Ford. Improvements were made through developing technologies and more efficient design. Major design changes include a larger flight deck, improvements in weapons and material handling, a new propulsion plant design that requires fewer people to operate and maintain, and a new, smaller island that has been pushed aft. Technological advances in electromagnetics have led to the development of an Electromagnetic Aircraft Launch System (EMALS) and an Advanced Arresting Gear (AAG). An integrated warfare system, the Ship Self-Defense System (SSDS), has been developed to allow the ship to more easily take on new missions. The new Dual Band Radar (DBR) combines S-band and X-band radar.[19]

These advances will allow the new Gerald R. Ford-class carriers to launch 25% more sorties, generate triple the electrical power with improved efficiency, and offer crew quality-of-life improvements.[2]

Flight deck

Catapult No. 4 on the Nimitz class cannot launch fully loaded aircraft because of low wing clearance along the edge of the flight deck.[20]

The movement of weapons from storage and assembly to the aircraft on the flight deck has also been streamlined and accelerated. Ordnance will be lifted to the centralized rearming location via higher-capacity weapons elevators that use linear motors.[21] These elevators are located so that ordnance need not cross any areas of aircraft movement, thereby reducing traffic problems in the hangars and on the flight deck. In 2008, Rear Admiral Dennis M. Dwyer said these changes will make it hypothetically possible to rearm the airplanes in "minutes instead of hours".[22]

Power generation

The new Bechtel A1B reactor for the Gerald R. Ford class is smaller and simpler, requires fewer crew, and yet is far more powerful than the Nimitz-class A4W reactor. Two reactors will be installed on each Gerald R. Ford-class carrier, providing a power generation capacity at least 25% greater than the 550 MW (thermal) of the two A4W reactors in a Nimitz-class carrier.[23] The portion of thermal power allotted to electrical generation will be tripled.[24]

The propulsion and power plant of the Nimitz-class carriers were designed in the 1960s, when onboard technologies required less electrical power. "New technologies added to the Nimitz-class ships have generated increased demands for electricity; the current base load leaves little margin to meet expanding demands for power."[25]

The Gerald R. Ford-class ships convert steam into power by piping it to four main turbine generators (MTG) to generate electricity for major ship systems, and the new electromagnetic catapults.[26] The Gerald R. Ford-class ships use steam turbines for propulsion.[27]

A larger power output is a major component of the integrated warfare system. Engineers took extra steps to ensure that integrating unforeseen technological advances onto a Gerald R. Ford-class aircraft carrier would be possible. The Navy expects the Gerald R. Ford class will be part of the fleet for 90 years, until the year 2105, which means that the class must successfully accept new technology over the decades. Only half of the electric power generation capacity is used by currently planned systems, with half remaining available for future technologies.[28]

Electromagnetic Aircraft Launch System

See main article: Electromagnetic Aircraft Launch System. The Electromagnetic Aircraft Launch System (EMALS) launches aircraft by means of a catapult employing a linear induction motor rather than the steam piston used on the Nimitz class. The EMALS accelerates aircraft more smoothly, putting less stress on their airframes. The EMALS also weighs less, is expected to cost less and require less maintenance, and can launch both heavier and lighter aircraft than a steam piston-driven system. It also reduces the carrier's requirement for fresh water, thus reducing the demand for energy-intensive desalination.

Advanced Arresting Gear landing system

See main article: Advanced Arresting Gear. Electromagnets are also being used in the new Advanced Arresting Gear (AAG) system. The current system relies on hydraulics to slow and stop a landing aircraft. While the hydraulic system is effective, as demonstrated by more than fifty years of implementation, the AAG system offers a number of improvements. The current system is unable to capture unmanned aerial vehicles (UAVs) without damaging them due to extreme stresses on the airframe. UAVs do not have the necessary mass to drive the large hydraulic piston used to trap heavier, manned airplanes. By using electromagnetics, the energy absorption is controlled by a turbo-electric engine. This makes the trap smoother and reduces shock on airframes. Even though the system will look the same from the flight deck as its predecessor, it will be more flexible, safe, and reliable, and will require less maintenance and manning.[29]

Sensors and self-defense systems

Another addition to the Gerald R. Ford class is an integrated active electronically scanned array search and tracking radar system. The dual-band radar (DBR) was being developed by Raytheon, for both the Zumwalt-class guided missile destroyers and the Gerald R. Ford-class aircraft carriers. The island can be kept smaller by replacing six to ten radar antennas with a single six-faced radar. The DBR works by combining the X band AN/SPY-3 multifunction radar with the S band AN/SPY-4 Volume Search Radar (VSR) emitters, distributed into three phased arrays.[30] The S-band radar was later deleted from the Zumwalt-class destroyers to save money.

The three faces dedicated to the X-band radar handle low-altitude tracking and radar illumination, while the three S-band faces handle target search and tracking regardless of weather. "Operating simultaneously over two electromagnetic frequency ranges, the DBR marks the first time this functionality has been achieved using two frequencies coordinated by a single resource manager."[19]

This new system has no moving parts, therefore minimizing maintenance and manning requirements for operation. The AN/SPY-3 consists of three active arrays and the Receiver/Exciter (REX) cabinets above-decks and the Signal and Data Processor (SDP) subsystem below-decks. The VSR has a similar architecture, with the beamforming and narrowband down-conversion functionality occurring in two additional cabinets per array. A central controller (the resource manager) resides in the Data Processor (DP). The DBR is the first radar system that uses a central controller and two active-array radars operating at different frequencies. The DBR gets its power from the Common Array Power System (CAPS), which comprises Power Conversion Units (PCUs) and Power Distribution Units (PDUs). The DBR is cooled via a closed-loop cooling system called the Common Array Cooling System (CACS).[31]

The Enterprise Air Surveillance Radar (EASR) is a new design surveillance radar that is to be installed in the second Gerald R. Ford-class aircraft carrier,, in lieu of the Dual Band radar. The s starting with LHA-8 and the planned LX(R) will also have this radar.[32] The EASR suite's initial per-unit cost will be about $180 million less than the DBR, for which the estimate is about $500 million.[33]

Possible upgrades

Future defense systems, such as free-electron laser directed-energy weapons, electric armor, and tracking systems will require more power. "Only half of the electrical power-generation capability on CVN-78 is needed to run currently planned systems, including EMALS. CVN-78 will thus have the power reserves that the Nimitz class lacks to run lasers and electric armor." The addition of new technologies, power systems, design layout, and better control systems results in an increased sortie rate of 25% over the Nimitz class and a 25% reduction in manpower required to operate.[34]

Waste management technology will be deployed on Gerald R. Ford. Co-developed with the Carderock Division of the Naval Surface Warfare Center, PyroGenesis Canada Inc., was in 2008 awarded the contract to outfit the ship with a Plasma Arc Waste Destruction System (PAWDS). This compact system will treat all combustible solid waste generated on board the ship. After having completed factory acceptance testing in Montreal, the system was scheduled to be shipped to the Huntington Ingalls shipyard in late 2011 for installation on the carrier.

The Navy is developing a free-electron laser (FEL) to defend against cruise missiles and small-boat swarms.[35] [36] [37]

3D computer-aided design

Newport News Shipbuilding used a full-scale three-dimensional product model developed in Dassault Systèmes CATIA V5 to design and plan the construction of the Gerald R. Ford class of aircraft carriers.[38]

The CVN 78 class was designed to have better weapons movement paths, largely eliminating horizontal movements within the ship. Current plans call for advanced weapons elevators to move from storage areas to dedicated weapons handling areas. Sailors would use motorized carts to move the weapons from storage to the elevators at different levels of the weapons magazines. Linear motors are being considered for the advanced weapons elevators. The elevators will also be relocated such that they will not impede aircraft operations on the flight deck. The redesign of the weapons movement paths and the location of the weapons elevators on the flight deck will reduce manpower and contribute to a much higher sortie generation rate.[39]

Planned aircraft complement

The Gerald R. Ford class is designed to accommodate the new Joint Strike Fighter carrier variant aircraft (F-35C), but aircraft development and testing delays have affected integration activities on CVN-78. These integration activities include testing the F-35C with CVN-78's EMALS and advanced arresting gear system and testing the ship's storage capabilities for the F-35C's lithium-ion batteries, tires, and wheels. As a result of F-35C developmental delays, the US Navy will not field the aircraft until at least 2018—one year after CVN-78 delivery. As a result, the Navy has deferred critical F-35C integration activities, which introduces a risk of system incompatibilities and costly retrofits to the ship after it is delivered to the Navy.[40]

Crew accommodations

Systems that reduce crew workload have allowed the ship's company on Gerald R. Ford-class carriers to total only 2,600 sailors, about 700 fewer than a Nimitz-class carrier. The massive, 180-man berthing areas on the Nimitz class are replaced by 40-rack berthing areas on Gerald R. Ford-class carriers. The smaller berthings are quieter and the layout requires less foot traffic through other spaces. Typically the racks are stacked three high, with locker space per person. The berthings do not feature modern "sit-up" racks with more headroom; bottom and middle racks only accommodate a sailor lying down. Each berthing has an associated head, including showers, vacuum-powered septic-system toilets (no urinals since the berthings are built gender-neutral)[41] and sinks to reduce travel and traffic to access those facilities. WiFi-enabled lounges are located across the passageway in separate spaces from the berthing's racks.[42]

Since deployment, the first two carriers of the class have run into problems with the plumbing of the waste system. The pipes were too narrow to handle the load of users, resulting in the vacuum failing and repeatedly clogged toilets.[43] To alleviate the problem, specialized acidic cleaning solutions have been used to flush out the sewage system. These cleaning treatments cost about $400,000 each time, resulting in a substantial unplanned increase in the lifetime expense of operating these ships according to the GAO. These cleanings will have to be performed for the lifetime of the ship.

Medical facilities

Gerald R. Ford, first in the class, has an on-board hospital that includes a full laboratory, pharmacy, operating room, 3-bed intensive care unit, 2-bed emergency room, and 41-bed hospital ward, staffed by 11 medical officers and 30 hospital corpsmen.[44]

Construction

Construction of the first vessel in the class, CVN-78 Gerald R. Ford, officially began on 11 August 2005, when Northrop Grumman held a ceremonial steel cut for a 15-ton plate that would form part of a side shell unit of the carrier,[45] but construction began in earnest in early 2007.[46] The carrier was assembled at Newport News Shipbuilding, a division of Huntington Ingalls Industries (formerly Northrop Grumman Shipbuilding) in Newport News, Virginia. This is the only shipyard in the United States that can build nuclear-powered aircraft carriers.

In 2005, Gerald R. Ford was estimated to cost at least $13 billion: $5 billion for research and development plus $8 billion to build.[6] A 2009 report raised the estimate to $14 billion, including $9 billion for construction.[47] In 2013, the life-cycle cost per operating day of a carrier strike group (including aircraft) was estimated at $6.5 million by the Center for New American Security.[48]

Originally, a total of three carriers were authorized for construction, but if the Nimitz-class carriers and were to be replaced one-for-one, 11 carriers would be required over the life of the program. The last Nimitz-class aircraft carrier is to be decommissioned in 2058.

In a speech on 6 April 2009, Secretary of Defense Robert Gates announced that each Gerald R. Ford-class carrier would be built over five years, yielding a "more fiscally sustainable path" and a 10-carrier fleet after 2040.[49] That changed in December 2016, when Navy Secretary Ray Mabus signed a Force Structure Assessment calling for a 355-ship fleet with 12 aircraft carriers.[50] [51] If enacted, this policy would require each Gerald R. Ford-class carrier to be built in three to four years.[52]

First-of-class type design changes

As construction of CVN-78 progressed, the shipbuilder made first-of-class type design changes, which it will use to update the model before the construction of the remaining vessels of its class. Several of these design changes related to EMALS configuration changes, which required electrical, wiring, and other changes within the ship. The Navy anticipates additional design changes stemming from remaining advanced arresting gear development and testing. According to the Navy, many of these 19,000 changes were programmed into the construction schedule early on—a result of the government's decision, at contract award, to introduce improvements to the ship's warfare systems during construction, which are heavily dependent on evolving commercial technologies.[40]

Naming

There was a movement by the Carrier Veterans' Association to have CVN-78 named after America rather than after President Ford.[53] Eventually, the amphibious assault ship LHA-6 was named .

On 27 May 2011, the U.S. Department of Defense announced the name of CVN-79 would be .[54]

On 1 December 2012, Secretary of the Navy Ray Mabus announced that CVN-80 would be named USS Enterprise. The information was delivered during a prerecorded speech as part of the deactivation ceremony for the previous . The future will be the ninth U.S. Navy ship to bear this name.[55]

On 20 January 2020, during a ceremony in Pearl Harbor, Hawaii, on Martin Luther King Jr. Day, Acting Secretary of the Navy Thomas B. Modly named a future Gerald R. Ford-class aircraft carrier in honor of World War II hero Doris Miller. This will be the first aircraft carrier named for an African American, and the first aircraft carrier to be named for a sailor in the enlisted ranks. It is the second ship named in honor of Miller, who was the first African American to be awarded the Navy Cross.[56] [57]

Ships in class

There are expected to be ten ships of this class.[58] To date, five have been announced:

ShipLaid downLaunchedCommissionedStatusScheduled to replaceReferences
CVN-7813 November 200911 October 201322 July 2017Active, in service[59] [60]
CVN-7922 August 201529 October 20192025 (scheduled)Fitting out[61] [62] [63] [64] [65]
CVN-805 April 2022[66] November 2025 (scheduled)[67] 2029 (scheduled)[68] Under construction[69]
CVN-81January 2026 (scheduled)October 2029 (scheduled)2032 (scheduled)Under construction[70]
TBDCVN-822027 (scheduled)2032 (scheduled)2036 (scheduled)Planned

See also

External links

Notes and References

  1. Before its redesignation to Gerald R. Ford class, the new carrier (CVN-78) was known as the CVN(X) carrier program ("X" meaning "in development") and then as the CVN-21 carrier program. (Here, "21" is not a hull number, but rather it is common in future plans of the US military, alluding to the 21st century.)
  2. Web site: CVN 78 Gerald R Ford Class. Naval technology.com. 26 March 2010. 22 December 2009. https://web.archive.org/web/20131220095616/http://www.naval-technology.com/projects/cvn-21. 20 December 2013. live.
  3. News: McLaughlin . Elizabeth . 2 March 2017 . The USS Gerald R. Ford: By the numbers . 26 January 2022 . ABC News . https://web.archive.org/web/20201112041418/https://abcnews.go.com/US/uss-gerald-ford-numbers/story?id=45854702 . 12 November 2020 . live.
  4. Web site: Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress. Congressional Research Service. Ronald. O'Rourke. 16 January 2018. 22 December 2017. https://web.archive.org/web/20171228190957/https://fas.org/sgp/crs/weapons/RS20643.pdf. 28 December 2017. live.
  5. Web site: Carrier Launch System Passes Initial Tests. Aviation Week. 1 June 2010. Bill. Sweetman. 14 August 2017. https://web.archive.org/web/20170815072348/http://aviationweek.com/awin/carrier-launch-system-passes-initial-tests. 15 August 2017. live.
  6. Web site: Costing the CVN-21: A DID Primer. Defense Industry Daily. 19 December 2005. 7 November 2007. https://web.archive.org/web/20070612145227/http://www.defenseindustrydaily.com/2005/12/costing-the-cvn21-a-did-primer/index.php. 12 June 2007. live. Covers the costs of the CVN-21 program, how those are calculated, and where the $5 billion savings on operational costs is expected to come from over the ship's planned 50-year lifetime.
  7. Web site: Gerald R Ford Class (CVN 78/79) – US Navy CVN 21 Future Carrier Programme – Naval Technology. naval-technology.com. 1 April 2015. https://web.archive.org/web/20131220095616/http://www.naval-technology.com/projects/cvn-21. 20 December 2013. live.
  8. Web site: AN/SPY-4 Volume Search Radar. GlobalSecurity.org. 10 August 2017. https://web.archive.org/web/20170811061206/http://www.globalsecurity.org/military/systems/ship/systems/vsr.htm. 11 August 2017. live.
  9. Web site: Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress. Congressional Research Service. Ronald. O'Rourke. 31 May 2017. 4 April 2015. https://web.archive.org/web/20150328211730/http://www.fas.org/sgp/crs/weapons/RL32109.pdf. 28 March 2015. live.
  10. Web site: Raytheon Awarded $92M Navy Contract for Future Carrier Radars. 22 August 2016.
  11. Web site: US Navy selects builder for new MQ-25 Stingray aerial refueling drone. DefenseNews . 31 August 2018 .
  12. Web site: Aircraft Carriers – CVN 21 Program . US Navy (Navy Fact File) . 9 February 2011 . 9 February 2011 . dead . https://web.archive.org/web/20110722200937/http://nae.ahf.nmci.navy.mil/downloads/NAV2010_04_Future_carrier_CVW_amphib_ACE_sp.pdf . 22 July 2011 .
  13. Web site: Keeter . Hunter . New Carrier Island Is at Heart of Higher Sortie Rates for CVN 21 . NavyLeague.org . 21 August 2011 . June 2003 . dead . https://web.archive.org/web/20110927163117/http://www.navyleague.org/sea_power/jun_03_23.php . 27 September 2011 .
  14. News: Head of the Class . Naval Aviation News . 22 December 2015 . 15 February 2016 . https://web.archive.org/web/20160216184545/http://navalaviationnews.navylive.dodlive.mil/2015/12/22/head-of-the-class/ . 16 February 2016 . live .
  15. News: Hagel Told New Carrier Unlikely to Meet Aircraft Goals . Tony Capaccio . 10 January 2014 . Bloomberg . 28 December 2016 . https://web.archive.org/web/20161229032209/https://www.bloomberg.com/news/articles/2014-01-10/hagel-told-new-carrier-unlikely-to-meet-aircraft-goals . 29 December 2016 . live .
  16. "Ship Information". USS Nimitz Homepage. 4 March 2008.
  17. "Our Ship". USS Theodore Roosevelt (CVN 71) Web Page. 4 March 2008.
  18. Schank, John. Modernizing the U.S. Aircraft Carrier Fleet: Accelerating CVN 21 Production Versus Mid-Life Refueling. Santa Monica: Rand Corporation, 2005. p. 76.
  19. Larrabee, Chuck. DDG 1000 Dual Band Radar (DBR). Raytheon. 1 March 2008.
  20. Schank, John. Modernizing the U.S. Aircraft Carrier Fleet, p. 77.
  21. Web site: Advanced Weapons Elevators. Federal Equipment Co.. 1 April 2015. https://web.archive.org/web/20130222033813/http://military.federalequipment.com/node/9. 22 February 2013. dead. dmy-all.
  22. Keeter, Hunter. "New carrier island is a heart of higher sortie rates for CVN 21". BNET Business Management Network. 4 March 2008.
  23. Web site: Nuclear-Powered Ships . world-nuclear.org . 1 April 2015 . https://web.archive.org/web/20130612204746/http://www.world-nuclear.org/info/Non-Power-Nuclear-Applications/Transport/Nuclear-Powered-Ships/ . 12 June 2013 . live .
  24. Web site: Nuclear Marine Propulsion. M.. Ragheb. 18 June 2017. mregheb.com. 29 October 2014. https://web.archive.org/web/20140812000038/http://mragheb.com/NPRE%20402%20ME%20405%20Nuclear%20Power%20Engineering/Nuclear%20Marine%20Propulsion.pdf. 12 August 2014. live.
  25. Web site: Schank. John. Smith. Giles. Alkire. Brien. Arena. Mark V.. Modernizing the U.S. Aircraft Carrier Fleet: Accelerating CVN 21 Production Versus Mid-Life Refueling. Rand. 2005. 25 August 2017. https://web.archive.org/web/20141020234951/http://www.rand.org/content/dam/rand/pubs/monographs/2006/RAND_MG289.sum.pdf. 20 October 2014. live.
  26. Web site: Gerald Ford Carrier Problems. 27 March 2019 . 6 July 2019 . https://web.archive.org/web/20190706081246/https://taskandpurpose.com/navy-gerald--ford-carrier-problems . 6 July 2019 . live.
  27. Web site: How Not to Build a Ship: The USS Ford . Project on Government Oversight . 30 May 2017 . 1 January 2020.
  28. Schank, John. Modernizing the U.S. Aircraft Carrier Fleet p. 83.
  29. Rodriguez, Carmelo. "Launch and Recovery Testing". ITEA-SAN. Turboelectric Arresting Gear. Mission Valley Hotel, San Diego. 16 June 2005.
  30. Larrabee, Chuck. "Raytheon Successfully Integrates Final Element of Dual Band Radar for DDG 1000 Zumwalt Class Destroyer". Raytheon News Release. 4 March 2008.
  31. Web site: Dual-Band Radar Development: From Engineering Design to Production. 28 October 2014 . dead . https://web.archive.org/web/20141212012332/http://www.navsea.navy.mil/nswc/dahlgren/Leading%20Edge/Sensors/03_Development.pdf . 12 December 2014 . Tolley. Alan L.. Ball. John E.. NAVSEA Warfare Center.
  32. Web site: Navy C4ISR and Unmanned Systems . Sea Power 2016 Almanac . . January 2016 . 91 . 9 November 2016 . usurped . https://web.archive.org/web/20170128204404/http://www.seapower-digital.com/seapower/january_2016?pg=93#pg93 . 28 January 2017 .
  33. Web site: Enterprise Air Surveillance Radar (EASR). Aerospace Daily & Defense Report. Aviation Week Network. 24 August 2014. 7 March 2016. https://web.archive.org/web/20161007031621/http://aviationweek.com/site-files/aviationweek.com/files/uploads/2015/08/ASD_reqsdoss_EASR_0824.pdf. 7 October 2016. live.
  34. .
  35. Web site: Wang. Brian. US Navy plans for scaling Free electron lasers to megawatt weapon systems. Next Big Future. 9 August 2017. 4 March 2016. https://web.archive.org/web/20170809212516/https://www.nextbigfuture.com/2016/03/us-navy-plans-for-scaling-free-electron.html. 9 August 2017. live.
  36. News: Unexpectedly, Navy's superlaser blasts away a record . Wired . 18 February 2011 . Spencer . Ackerman . 7 March 2017 . https://web.archive.org/web/20170130132110/https://www.wired.com/2011/02/unexpectedly-navys-superlaser-blasts-away-a-record/ . 30 January 2017 . live . .
  37. Web site: Congressional Research Service . Navy Shipboard Lasers for Surface, Air, and Missile Defense: Background and Issues for Congress . Ronald . O'Rourke . 12 June 2015 . 4 April 2015 . https://web.archive.org/web/20150328211737/http://www.fas.org/sgp/crs/weapons/R41526.pdf . 28 March 2015 . live . .
  38. Dassault Systemes 3D simulation – CATIA goes virtual reality . 15 July 2011 . YouTube . 30 December 2017 . https://web.archive.org/web/20170818122748/https://www.youtube.com/watch?v=tiA_Pq0--MY . 18 August 2017 . live .
  39. Web site: MODERNIZING THE U.S. AIRCRAFT CARRIER FLEET – Accelerating CVN 21 Production Versus Mid-Life Refueling. National Defense Research Institute. RAND Corporation. 17 March 2015. https://web.archive.org/web/20141020234949/http://www.rand.org/content/dam/rand/pubs/monographs/2006/RAND_MG289.pdf. 20 October 2014. live.
  40. Web site: FORD - CLASS CARRIERS: Lead Ship Testing and Reliability Shortfalls Will Limit Initial Fleet Capabilities. GAO. September 2013. 24 October 2014. https://web.archive.org/web/20140927181245/http://www.gao.gov/assets/660/657412.pdf. 27 September 2014. live.
  41. News: No urinals on the Ford-class carriers . Shapiro . Michael Welles . 25 June 2012 . Newport News Daily Press . 6 April 2017 . https://web.archive.org/web/20170407143907/http://www.dailypress.com/business/ports/shipping-news-blog/dp-no-urinals-on-the-fordclass-carriers-20120625-post.html . 7 April 2017 . live .
  42. News: Bacon. Lance M.. Crew's ship: Sailors' comfort a centerpiece of new supercarrier Ford. 5 June 2017. Navy Times. 13 October 2014.
  43. News: Capaccio . Anthony . Unclogging Toilets at $400,000 a Flush Hits Navy's Costs . 30 December 2020 . Bloomberg . 24 March 2020.
  44. Web site: Meet Gerald R. Fords Senior Medical Officer. ussgeraldrford.wordpress.com. 8 August 2016. 5 January 2018. https://web.archive.org/web/20180105233655/https://ussgeraldrford.wordpress.com/2016/08/08/meet-the-gerald-r-ford-senior-medical-officer/. 5 January 2018. live.
  45. Web site: Ford Reaches 50 Percent Structural Completion. 1 September 2011. Newport News Shipbuilding. https://web.archive.org/web/20141028174404/http://nns.huntingtoningalls.com/employees/pub/media/yardlines/YL0911.pdf. 28 October 2014. live.
  46. News: Construction Begins on the First Ford-class Carrier. Glass, Jon W.. The Virginian-Pilot. 2007-03-25. 31 October 2008. dmy-all.
  47. Web site: The Politician Class Carriers Evolve. 18 April 2009. 12 April 2009. strategypage.com. https://web.archive.org/web/20090415095651/http://www.strategypage.com/htmw/htnavai/articles/20090412.aspx. 15 April 2009. live.
  48. News: Capt Henry J. Hendrix, USN (PhD). At What Cost a Carrier?. Disruptive Defense Papers. Center for a New American Security. March 2009. https://web.archive.org/web/20140813034340/http://www.cnas.org/files/documents/publications/CNAS%20Carrier_Hendrix_FINAL.pdf. 13 August 2014.
  49. Web site: Defense Budget Recommendation Statement (Arlington, VA). 27 March 2010. US Department of Defense. 6 April 2009. https://web.archive.org/web/20091203013443/http://www.defenselink.mil/speeches/speech.aspx?speechid=1341. 3 December 2009. live.
  50. Web site: Secretary of the Navy Announces Need for 355-ship Navy. This story was written by The Office of the Secretary of the. Navy. 6 April 2018. https://web.archive.org/web/20180407053552/http://www.navy.mil/submit/display.asp?story_id=98160. 7 April 2018. live.
  51. Web site: Navy Wants 355 Ships; New Assessment Adds Destroyers, Attack Subs. 16 December 2016. 6 April 2018. https://web.archive.org/web/20180407182639/https://news.usni.org/2016/12/16/navy-wants-grow-fleet-355-ships-47-hull-increase-previous-goal. 7 April 2018. live.
  52. Web site: Report to Congress on Gerald R. Ford Class Carrier Program - USNI News. 4 April 2018. 6 April 2018. https://web.archive.org/web/20180407054255/https://news.usni.org/2018/04/04/report-congress-gerald-r-ford-class-carrier-program. 7 April 2018. live.
  53. Web site: LaGrone. Sam. Twenty Six US Navy Ship Naming Controversies. USNI News. U.S. Naval Institute. 12 August 2017. USS Gerald R. Ford. 23 April 2013. The vets argued that Ford was not much more than an adequate president, so it was more fitting for the carrier-class to be known as America.... https://web.archive.org/web/20170813012236/https://news.usni.org/2013/04/23/twenty-six-us-navy-ship-naming-controversies. 13 August 2017. live.
  54. Web site: Navy Names Next Aircraft Carrier USS John F. Kennedy . 29 May 2011 . U.S. Department of Defense. News Release. dead . https://web.archive.org/web/20130820182239/http://www.defense.gov//releases/release.aspx?releaseid=16035 . 20 August 2013 . dmy .
  55. Web site: US Navy's Ford-class aircraft carrier to be named Enterprise . Brahmand.com . Defence & Aerospace News . 4 December 2012 . 4 December 2012 . dead . https://web.archive.org/web/20121207081701/http://brahmand.com/news/US-Navys-Ford-class-aircraft-carrier-to-be-named-Enterprise/10464/1/17.html . 7 December 2012 .
  56. News: Diaz . Johnny . Navy Aircraft Carrier to Be Named for Black Pearl Harbor Veteran . . 2020-01-18 . 2020-01-19 .
  57. Navy Will Name A Future Ford Class Aircraft Carrier After WWII Hero Doris Miller . Acting Secretary of the Navy Public Affairs . . 2020-01-19 .
  58. News: CVN-77 Delivery Moved To December, Newport News on Track For January Commissioning . Defense Daily . 4 August 2008 . 12 August 2017 . https://web.archive.org/web/20170813010741/http://www.defensedaily.com/cvn-77-delivery-moved-to-december-newport-news-on-track-for-january-commissioning/ . 13 August 2017 . live .
  59. News: The US Navy just took delivery of the world's most advanced aircraft carrier. Business Insider. 2017-06-01. en. https://web.archive.org/web/20170601181353/http://www.businessinsider.com/us-navy-delivery-uss-gerald-ford-2017-6. 1 June 2017. live.
  60. Web site: Aircraft Carrier Gerald R. Ford (CVN 78) Christened at Newport News Shipbuilding . 12 November 2013 . Defence Talk . 2 December 2013 . https://web.archive.org/web/20131203001607/http://www.defencetalk.com/aircraft-carrier-gerald-r-ford-cvn-78-christened-at-newport-news-shipbuilding-49604/ . 3 December 2013 . live .
  61. Web site: Ress. Dave. To speed up delivery of USS John F. Kennedy, Navy to pay up to $315 million extra. 2021-01-16. dailypress.com. 3 November 2020 .
  62. Navy Names Next Aircraft Carrier USS John F. Kennedy . Secretary of the Navy Public Affairs . 29 May 2011 . 29 May 2011 . https://web.archive.org/web/20110602191043/http://www.navy.mil/search/display.asp?story_id=60686 . 2 June 2011 . live .
  63. Web site: Here's the latest on America's next supercarriers. David. Larter. 4 May 2018.
  64. Web site: n/. a. Navy Ford (CVN-78) Class Aircraft Carrier Program. 2021-07-28. CRS.
  65. Web site: Burchett . Caitlyn . 2023-03-24 . Delivery date for next carrier, USS John F. Kennedy, pushed back a year . 2023-04-15 . Daily Press.
  66. Web site: LaGrone . Sam . 5 April 2022 . HII Lays Keel of Future Aircraft Carrier USS Enterprise . usni.org. U.S. Naval Institute.
  67. Web site: Sea Air Space Exposition: John F. Kennedy (CVN 79) Enterprise (CVN 80) & Unnamed (CVN 81) – Two Ship Buy . Naval Sea Systems Command . Malone, Capt. Phillip . 2019-05-06 . PDF . mdy-all .
  68. Web site: Shelbourne . Mallory . 15 March 2024 . Aircraft Carrier Enterprise Delivery Delayed by 18 Months, Says Navy . usni.org. U.S. Naval Institute.
  69. First cut of steel kicks off construction of the aircraft carrier Enterprise at Newport News Shipbuilding . WTKR . 21 August 2017 . 6 September 2017 . https://web.archive.org/web/20170915185432/http://wtkr.com/2017/08/21/first-cut-of-steel-to-kick-off-construction-of-the-aircraft-carrier-enterprise-at-newport-news-shipbuilding/ . 15 September 2017 . live .
  70. Web site: Next Ford-class Carrier to be Named After Pearl Harbor Hero Doris Miller . LaGrone . Sam . USNI News . 18 January 2020 . 18 January 2020.