Series 9500 | |
Interiorimage: | CPTM Série 9500.jpg |
Service: | 2017–present |
Manufacturer: | Hyundai Rotem |
Factory: | Araraquara, São Paulo |
Yearconstruction: | 2017–2019 |
Yearservice: | 16 June 2017 |
Numberbuilt: | 30 |
Numberservice: | 30 |
Formation: | 8-car sets (MC–R1–R2–M+M–R2–R1–MC) |
Fleetnumbers: | 9501/9502–9619/9620 |
Capacity: | 2,600 |
Operator: | Companhia Paulista de Trens Metropolitanos |
Trainlength: | 170m (560feet) |
Height: | 4545mm |
Floorheight: | 1335mm |
Entrylevelorstep: | Step |
Doors: | 8 sets of side doors per car |
Wheeldiameter: | 915mm |
Wheelbase: | 2400mm |
Maxspeed: | 90km/h |
Weight: | 179000kg (395,000lb) |
Traction: | Hyundai Rotem RVS10001DQ0 IGBT–VVVF |
Traction Motors: | 16 × Hyundai Rotem HRTM-IFS-270A 270kW asynchronous 3-phase AC |
Poweroutput: | 4320kW |
Acceleration: | 0.9m/s2 |
Hvac: | Air conditioning |
Electricsystem: | overhead line |
Collectionmethod: | Pantograph |
Uicclass: | Bo′Bo′+2′2′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+2′2′+Bo′Bo′ |
Coupling: | Dellner |
Notes: | Sourced from [1] except where noted. |
The CPTM Series 9500 is a class of electric multiple units part of the São Paulo Metropolitan Trains rolling stock, built by Hyundai Rotem from 2017 to 2019.[2]
In July 2013, a consortium composed by Brazilian company IEASA and Korean Hyundai Rotem won a bid to build 30 trains with 8 cars each to CPTM. The project cost R$789 million (US$365.9 million) and the trains were to be built within 36 months.[3] [4]
With a deadline of July 2016, the first trains were only delivered in January and after a long delay, Hyudai Rotem needed to change plans. This is because their Brazilian partner IESA had to leave the consortium due to bankruptcy. IESA was the one that would assemble the trains in Brazil for the Korean company. After that, the delivery of 22 trains was delayed.[5]
With the departure of IESA, Rotem decided to build their own factory in Araraquara to produce the EMUs. In March 2016, the company invested R$100 million (US$28.6 million) on the opening of its first factory in Latin America, which is now its second largest in the world.[6] [7] The first trains had to be assembled in Asia and finished in CKD process in the new factory.[8] At that moment, a Hyundai Rotem representative stated to press that "[they] don't know how many trains were built at the moment, but [they] are certain that at least one was delivered and is already in tests by CPTM".[9]
After long tests for homologation and certification of the model, in June 2017, the company could operate the first Series 9500 train.[10] From that, the company negotiated a new deadline and began delivering the compositions on time.[11] The last train was delivered by Rotem on 25 February 2019, with the factory going into recess due to lack of new orders.[12]
The 34-month delay for the delivery made CPTM fine Hyundai Rotem R$4.27 million (US$1.22 million).[13] To decrease the delay on deliveries, Rotem also direspected labour laws and, after a lawsuit filed by the Labour Public Prosecutor's Office (MPT), they were found guilty by the Labour Justice with a R$1 million (US$) fine.[14] [15] After a conciliation agreement between MPT and Rotem, the fine was reduced to R$400,000 (US$).[16]
Later, Rotem lost a bidding process for the supply of 62 passenger cars for Vale S.A.. The mining company chose Chinese CRRC Qingdao Sifang, bringing protests from the president of the Brazilian Association of Rail Industry (Abifer) and speculations in the press about how much the failures and delays in deliveries on Series 9500 trains weighed on Vale's choice.[17]
Three compositions operated on Line 13-Jade, but currently all of them operate on lines 7-Ruby and 10-Turquoise.[18] [19] [20]