GE CM20EMP explained

Kereta Api Indonesia Class CC206
Powertype:Diesel-electric
Builder:Engine and Body GE Transportation; Bogies by PT Barata Indonesia
Buildmodel:GE CM20EMP
Builddate:2012–2013, 2015-2016
Totalproduction:150 units
Whytetype:0-6-6-0
Aarwheels:C-C
Uicclass:Co'Co'
Bogies:Fabricated bogies (welded construction) by PT Barata Indonesia
Length:15849mm
Width:2743mm
Height:3695mm
Axleload:15000lk=onNaNlk=on
Locoweight:90000lk=onNaNlk=on[1]
Fueltype:diesel fuel (High-Speed Diesel)
Primemover:GE 7FDL-8
Enginetype:4-stroke V8 turbodiesel
Alternator:GE 761
Generator:GE GT601
Tractionmotors:6
Cylindercount:8
Maxspeed:160lk=onNaNlk=on (Record)
120lk=onNaNlk=on (Operational)
Poweroutput:1680sigfig=3NaNsigfig=3
Tractiveeffort:248kN (starting); 207kN (continuous)
Locobrakes:Westinghouse 26L (Railway air brake, Dynamic braking, Parking brake)
Safety:LOCOCOMM™, LOCOTROL® Distributed Power, Train Control/SCADA, Ultra Cab II Signalling, GE Integrated Function Display™, GE BrightStar™ Microprocessor and Computer System
Bell type: Graham White GW373 E-Bell,
Horn type: Nathan P2 horn
Nathan P-2 horn + Nathan KS-1L (CC 206 15 17)
Operator:Kereta Api Indonesia
Fleetnumbers:CC 206 13 01-100, 15 01-39, 16 01-11
Nicknames:The "Puongs"; The "Baby" (when brand new)
Locale:Java Island (Passenger and Freight), South Sumatra (Freight)
Firstrundate:2013 (generation I)
2015 (generation IIA)
2016 (generation IIB)
Disposition:148 units are operating, 2 units are not operating temporarily.

The GE CM20EMP diesel-electric locomotives (also known as CC206 in Indonesia) are owned by Kereta Api Indonesia (Indonesian Railways Co.) and built by GE Transportation. The GE CM20EMPs are multipurpose locomotives, not only for hauling passenger trains (i.e. executive class, business class, or economy class), but also freight trains.[2]

The locomotives' operation have started in 2013, and become Indonesian Railway's main workhorses for hauling trains. These locomotives are operated along the Java main line[3] for hauling freight and passenger train, and along South-Sumatra and Lampung Line for hauling freights, mainly coal service from Tanjung Enim to Kertapati. They are double-cabin, and the most active double-cabin locomotives in Indonesia.

History

The first double cabin locomotives were the GE CM20EMP's predecessors, such as CC200s (Alco-GE UM 106T), BB301s and BB304s (Krupp M1500BB), and BB305s (built by CFD).[4] While they were once used for express passenger train duty, they are now mostly operated as switchers and haulers of local trains, or have been withdrawn.

Between 2000 and 2010 the Indonesian Railways Co. decided to modernize existing diesel-electric locomotives such as previously owned CC204s (C20EMP locomotives). But, with the increasing cost of maintenance, parts, fuel and workers, caused by aging and inefficient locomotives, in 2010, the company decided to buy new diesel-electric locomotives to be added to its rolling stock.[5] [6] But, due to the latest rule from Indonesia Government's Ministry of Transportation, every new locomotive should have no 'long-hood' position, to decrease the number of accidents.[7] This is related to limit sight of the engineer when the locomotives move on long-hood position.

By September 2012 the company had bought 100 locomotives of the CM20EMP type and these have been operated since 2013. The locomotives were supplied without bogies and the bogies were assembled by Barata Indonesia. When the ship that carried the locomotives arrived in Tanjung Priok Port, the locomotives were brought to Indonesian Railways Locomotive Workshop in Pengok, Yogyakarta, to be assembled with bogies from barata, and complete their dynamics and statics test.

Additional 50 locomotives were ordered in 2014, with the first-39-locos arriving on 14 August 2015, and directly be brought to Pengok, Yogyakarta. After test, 28 locomotives numbered from CC 206 112 (CC 206 15 12) till CC 206 139 (CC 206 15 39) were transferred to Kertapati, South Sumatra by Panjang port, to haul coal trains in south Sumatra.[8]

The last-11-locos arrived in Tanjung Priok Port on 14 July 2016.[9] Same as before, the locomotives were brought to Pengok, Yogyakarta, and start the same process as before. after test, the locomotives were transferred to south Sumatra again, to fulfill the lack of locomotives' need for coal trains.

Features

Body

The CM20EMPs were made when Indonesian Railways Co. needed a double-cab locomotive. The cab and body are similar to the British Rail Class 70 (GE PowerHaul series), but the front windows are like the Indonesian GE U20Cs of class CC203. The headlights and cab doors are like another (unspecified) Indonesian U20C.

Engines, specifications, and electronic devices

These locomotives use a new version of the GE 7FDL-8 engine that meets the same emission standards as the GE Dash 9 Series locomotives. The power output of CM20EMPs is 2,250 horsepower, equal to that of EMD G26, and 100 hp more than the 2,150 hp CC203s/GE U20C. Meanwhile, the tractive effort of these locomotives is as much as 248 kN (starting) and 207 kN (continuous). These locomotives are equipped with GE BrightStar™ computer systems, integrated with the GE Integrated Function Display™. The CC206s have different horns from the previous GE locos in Indonesia. While its predecessors use Wabco AA2 with factory note tuned to D, G (play perfect 4th mid C), the CC206 locomotives use Nathan 3rd gen P2 (Bell No. 1&4) with factory note tuned to D, A (play perfect 5th mid C), (Unlike the other P2 using Bell No. 1&2 play minor 3rd).

One unit of CC206 locomotive could haul up to 16 passenger cars or 30 freight cars.

Allocations

Initially, all CC206 of 2013 batch (no. 13 01 – 13 100) and some units of 2015 batch (no. 15 01 – 15 11) were allocated to various motive power depots across Java, while the rest of 2015 batch (no. 15 12 – 15 39) and all of the 2016 batch (no. 16 01 – 16 11) were allocated to depot in South Sumatra.[10] [11]

In February 2021, two 2015 batch units (CC206 15 09 and CC206 15 10) of the depot in East Java were transferred to the Kertapati depot.[12] Further two units of 2015 batch (CC206 15 08 and CC206 15 11) from Sidotopo's fleet were transferred to Kertapati in March 2024.[13]

Accidents

See also

Notes and References

  1. Web site: GE product catalogue. 9 August 2016 .
  2. Web site: 2016-08-09 . GE Transportation Locomotive Product Catalog by GE Transportation - Issuu . 2024-06-22 . issuu.com . en.
  3. Web site: GE to supply 50 locomotives to Indonesia. Keith. Barrow. 18 September 2014. International Railway Journal.
  4. Web site: Diesel Locomotive Roster. Indra. Krishnamurti. 6 December 2004.
  5. News: M.. Shinta. 6 December 2012. PT KAI Akan Datangkan 75 Lokomotif Baru. id. Tempo. 12 June 2021.
  6. Progress Rail Services Announces Intention to Acquire Electro-Motive Diesel. dead. https://web.archive.org/web/20100610052612/http://www.emdiesels.com/emdweb/company/more/060110_prs.html. 10 June 2010. Electro-Motive Diesel. 1 June 2010.
  7. Web site: Peraturan Menteri (Permen) No. 4 Tahun 2010. id.
  8. News: KAI Jajal Lokomotif CC 206 Baru Dinas KA Babaranjang - KAORI Nusantara. Adi. Taufik. 15 February 2016. KAORI Nusantara. 16 March 2017. id.
  9. News: Lokomotif CC 206 Terbaru PT KAI Tiba Di Tanah Air. Bintang. Amri. 15 July 2016. KAORI Nusantara. 16 March 2017. id.
  10. Book: Grafik Perjalanan Kereta Api pada Jaringan Jalur Kereta Api Nasional di Jawa Tahun 2023. 14 April 2023. 5 April 2024. Direktorat Jenderal Perkeretaapian. Jakarta. ID . 1807.
  11. Book: Grafik Perjalanan Kereta Api pada Jaringan Jalur Kereta Api Nasional di Sumatra Bagian Selatan Tahun 2023. 14 April 2023. 5 April 2024. Direktorat Jenderal Perkeretaapian. Jakarta. ID. 237.
  12. Web site: Bayu Tri . Sulistyo . Dua Lokomotif CC 206 "Transmigrasi" ke Sumatera . redigest.web.id . 27 February 2021 . 5 April 2024 . ID.
  13. Web site: Bayu Tri . Sulistyo . Lagi, Dua Unit Lokomotif CC206 Dikirim ke Sumatera . redigest.web.id . 22 March 2024 . 5 April 2024 . ID.
  14. Web site: (untitled). Facebook.
  15. Web site: Korban Kebakaran Lokomotif Alami Luka Bakar di Kaki dan Muka . Tribunnews.com. 23 September 2023 . id.
  16. Prasetya. Sendy. May 2014. Indonesian. Beratnya Medan Hambat Evakuasi CC206. Indonesian Railways Magazine. Majalah Kereta Api.
  17. Prasetya. Sendy. June 2014. Indonesian. Lagi-lagi CC206 Jungkel. Indonesian Railways Magazine. Majalah Kereta Api.