Business continuity planning explained

Business continuity may be defined as "the capability of an organization to continue the delivery of products or services at pre-defined acceptable levels following a disruptive incident",[1] and business continuity planning[2] [3] (or business continuity and resiliency planning) is the process of creating systems of prevention and recovery to deal with potential threats to a company.[4] In addition to prevention, the goal is to enable ongoing operations before and during execution of disaster recovery.[5] Business continuity is the intended outcome of proper execution of both business continuity planning and disaster recovery.

Several business continuity standards have been published by various standards bodies to assist in checklisting ongoing planning tasks.[6]

Business continuity requires a top-down approach to identify an organisation's minimum requirements to ensure its viability as an entity. An organization's resistance to failure is "the ability ... to withstand changes in its environment and still function".[7] Often called resilience, it is a capability that enables organizations to either endure environmental changes without having to permanently adapt, or the organization is forced to adapt a new way of working that better suits the new environmental conditions.[7]

Overview

Any event that could negatively impact operations should be included in the plan, such as supply chain interruption, loss of or damage to critical infrastructure (major machinery or computing/network resource). As such, BCP is a subset of risk management.[8] In the U.S., government entities refer to the process as continuity of operations planning (COOP).[9] A business continuity plan[10] outlines a range of disaster scenarios and the steps the business will take in any particular scenario to return to regular trade. BCP's are written ahead of time and can also include precautions to be put in place. Usually created with the input of key staff as well as stakeholders, a BCP is a set of contingencies to minimize potential harm to businesses during adverse scenarios.[11]

Resilience

A 2005 analysis of how disruptions can adversely affect the operations of corporations and how investments in resilience can give a competitive advantage over entities not prepared for various contingencies[12] extended then-common business continuity planning practices. Business organizations such as the Council on Competitiveness embraced this resilience goal.[13]

Adapting to change in an apparently slower, more evolutionary manner - sometimes over many years or decades - has been described as being more resilient,[14] and the term "strategic resilience" is now used to go beyond resisting a one-time crisis, but rather continuously anticipating and adjusting, "before the case for change becomes desperately obvious".

This approach is sometimes summarized as: preparedness,[15] protection, response and recovery.[16]

Resilience Theory can be related to the field of Public Relations. Resilience is a communicative process that is constructed by citizens, families, media system, organizations and governments through everyday talk and mediated conversation.[17]

The theory is based on the work of Patrice M. Buzzanell, a professor at the Brian Lamb School of Communication at Purdue University. In her 2010 article, "Resilience: Talking, Resisting, and Imagining New Normalcies Into Being"[18] Buzzanell discussed the ability for organizations to thrive after having a crisis through building resistance. Buzzanell notes that there are five different processes that individuals use when trying to maintain resilience- crafting normalcy, affirming identity anchors, maintaining and using communication networks, putting alternative logics to work and downplaying negative feelings while foregrounding positive emotions.

When looking at the resilience theory, the crisis communication theory is similar, but not the same. The crisis communication theory is based on the reputation of the company, but the resilience theory is based on the process of recovery of the company. There are five main components of resilience: crafting normalcy, affirming identity anchors, maintaining and using communication networks, putting alternative logics to work, and downplaying negative feelings while foregrounding negative emotions.[19] Each of these processes can be applicable to businesses in crisis times, making resilience an important factor for companies to focus on while training.

There are three main groups that are affected by a crisis. They are micro (individual), meso (group or organization) and macro (national or interorganizational). There are also two main types of resilience, which are proactive and post resilience. Proactive resilience is preparing for a crisis and creating a solid foundation for the company. Post resilience includes continuing to maintain communication and check in with employees.[20] Proactive resilience is dealing with issues at hand before they cause a possible shift in the work environment and post resilience maintaining communication and accepting changes after an incident has happened. Resilience can be applied to any organization.In New Zealand, the Canterbury University Resilient Organisations programme developed an assessment tool for benchmarking the Resilience of Organisations.[21] It covers 11 categories, each having 5 to 7 questions. A Resilience Ratio summarizes this evaluation.[22]

Continuity

Plans and procedures are used in business continuity planning to ensure that the critical organizational operations required to keep an organization running continue to operate during events when key dependencies of operations are disrupted. Continuity does not need to apply to every activity which the organization undertakes. For example, under ISO 22301:2019, organizations are required to define their business continuity objectives, the minimum levels of product and service operations which will be considered acceptable and the maximum tolerable period of disruption (MTPD) which can be allowed.[23]

A major cost in planning for this is the preparation of audit compliance management documents; automation tools are available to reduce the time and cost associated with manually producing this information.

Inventory

Planners must have information about:

Analysis

The analysis phase consists of:

Quantifying of loss ratios must also include "dollars to defend a lawsuit."[24] It has been estimated that a dollar spent in loss prevention can prevent "seven dollars of disaster-related economic loss."[25]

Business impact analysis (BIA)

A business impact analysis (BIA) differentiates critical (urgent) and non-critical (non-urgent) organization functions/activities. A function may be considered critical if dictated by law.

Each function/activity typically relies on a combination of constituent components in order to operate:

For each function, two values are assigned:

Maximum RTO

Maximum time constraints for how long an enterprise's key products or services can be unavailable or undeliverable before stakeholders perceive unacceptable consequences have been named as:

According to ISO 22301 the terms maximum acceptable outage and maximum tolerable period of disruption mean the same thing and are defined using exactly the same words.[29] Some standards use the term maximum downtime limit.[30]

Consistency

When more than one system crashes, recovery plans must balance the need for data consistency with other objectives, such as RTO and RPO.[31] Recovery Consistency Objective (RCO) is the name of this goal. It applies data consistency objectives, to define a measurement for the consistency of distributed business data within interlinked systems after a disaster incident. Similar terms used in this context are "Recovery Consistency Characteristics" (RCC) and "Recovery Object Granularity" (ROG).[32]

While RTO and RPO are absolute per-system values, RCO is expressed as a percentage that measures the deviation between actual and targeted state of business data across systems for process groups or individual business processes.

The following formula calculates RCO with "n" representing the number of business processes and "entities" representing an abstract value for business data:

RCO=1-

(numberofinconsistententities)n
(numberofentities)n

100% RCO means that post recovery, no business data deviation occurs.[33]

Threat and risk analysis (TRA)

After defining recovery requirements, each potential threat may require unique recovery steps (contingency plans or playbooks). Common threats include:

The above areas can cascade: Responders can stumble. Supplies may become depleted. During the 2002–2003 SARS outbreak, some organizations compartmentalized and rotated teams to match the incubation period of the disease. They also banned in-person contact during both business and non-business hours. This increased resiliency against the threat.

Impact scenarios

Impact scenarios are identified and documented:

These should reflect the widest possible damage.

Tiers of preparedness

SHARE's seven tiers of disaster recovery[38] released in 1992, were updated in 2012 by IBM as an eight tier model:[39]

Solution design

Two main requirements from the impact analysis stage are:

This phase overlaps with disaster recovery planning.

The solution phase determines:

Standards

ISO Standards

There are many standards that are available to support business continuity planning and management.[40] [41] The International Organization for Standardization (ISO) has for example developed a whole series of standards on Business continuity management systems [42] under responsibility of technical committee ISO/TC 292:

British standards

The British Standards Institution (BSI Group) released a series of standards which have since been withdrawn and replaced by the ISO standards above.

Within the UK, BS 25999-2:2007 and BS 25999-1:2006 were being used for business continuity management across all organizations, industries and sectors. These documents give a practical plan to deal with most eventualities—from extreme weather conditions to terrorism, IT system failure, and staff sickness.[62]

In 2004, following crises in the preceding years, the UK government passed the Civil Contingencies Act of 2004: Businesses must have continuity planning measures to survive and continue to thrive whilst working towards keeping the incident as minimal as possible.The Act was separated into two parts: Part 1: civil protection, covering roles & responsibilities for local respondersPart 2: emergency powers.[63] In the United Kingdom, resilience is implemented locally by the Local Resilience Forum.[64]

Australian standards

United States

Implementation and testing

The implementation phase involves policy changes, material acquisitions, staffing and testing.

Testing and organizational acceptance

The 2008 book Exercising for Excellence, published by The British Standards Institution identified three types of exercises that can be employed when testing business continuity plans.

While start and stop times are pre-agreed, the actual duration might be unknown if events are allowed to run their course.

Maintenance

Biannual or annual maintenance cycle maintenance of a BCP manual[76] is broken down into three periodic activities.

Issues found during the testing phase often must be reintroduced to the analysis phase.

Information and targets

The BCP manual must evolve with the organization, and maintain information about who has to know what:

Technical

Specialized technical resources must be maintained. Checks include:

Testing and verification of recovery procedures

Software and work process changes must be documented and validated, including verification that documented work process recovery tasks and supporting disaster recovery infrastructure allow staff to recover within the predetermined recovery time objective.[79]

Further reading

External links

Notes and References

  1. BCI Good Practice Guidelines 2013, quoted in Mid Sussex District Council, Business Continuity Policy Statement, published April 2018, accessed 19 February 2021
  2. . June 26, 2015 . How to Build an Effective and Organized Business Continuity Plan.
  3. Web site: American Bar.org (American Bar Association) . Surviving a Disaster. https://ghostarchive.org/archive/20221009/https://www.americanbar.org/content/dam/aba/events/disaster/surviving_a_disaster_a_lawyers_guide_to_disaster_planning.authcheckdam.pdf . 2022-10-09 . live . 2011 .
  4. Elliot, D.; Swartz, E.; Herbane, B. (1999) Just waiting for the next big bang: business continuity planning in the UK finance sector. Journal of Applied Management Studies, Vol. 8, No, pp. 43–60. Here: p. 48.
  5. Business Insurance Magazine . Alan Berman . March 9, 2015 . Constructing a Successful Business Continuity Plan.
  6. Web site: Business Continuity Plan . United States Department of Homeland Security . 4 October 2018 . 7 December 2018 . https://web.archive.org/web/20181207233700/https://www.ready.gov/business/implementation/continuity . dead .
  7. Ian McCarthy . Mark Collard . Michael Johnson . Adaptive organizational resilience: an evolutionary perspective . Current Opinion in Environmental Sustainability . 28 . 33–40 . 10.1016/j.cosust.2017.07.005. 2017 . 2017COES...28...33M .
  8. Web site: Business Continuity Planning . Intrieri. Charles. 10 September 2013. Flevy. 29 September 2013.
  9. Web site: Continuity Resources and Technical Assistance | FEMA.gov. www.fema.gov.
  10. Web site: A Guide to the preparation of a Business Continuity Plan. 2019-02-08. 2019-02-09. https://web.archive.org/web/20190209125238/https://www.aig.co.uk/content/dam/aig/emea/united-kingdom/documents/property-insights/business-continuity-planning-guidelines-for-preparation-of-your-plan.pdf. dead.
  11. Web site: Business Continuity Planning (BCP) for Businesses of all Sizes. 19 April 2017. 28 April 2017. https://web.archive.org/web/20170424090047/http://www.williamadvisorygroup.com/business-continuity-planning-bcp-for-businesses-of-all-sizes/. 24 April 2017. dead.
  12. Book: Yossi Sheffi . The Resilient Enterprise: Overcoming Vulnerability for Competitive Enterprise . MIT Press . October 2005. Yossi Sheffi.
  13. Web site: Transform. The Resilient Economy . 2019-02-04 . 2013-10-22 . https://web.archive.org/web/20131022142939/http://www.compete.org/publications/detail/31/the-resilient-economy-integrating-competitiveness-and-security/ . dead .
  14. Web site: Newsday | Long Island's & NYC's News Source | Newsday.
  15. Business Continuity Preparedness and the Mindfulness State of Mind . AMCIS 2007 Proceedings . "An estimated 80 percent of companies without a well-conceived and tested business continuity plan, go out of business within two years of a major disaster" (Santangelo 2004) . Tiffany Braun . Benjamin Martz . 7698286 . 2007.
  16. Web site: Annex A.17: Information Security Aspects of Business Continuity Management . ISMS.online . November 2021.
  17. Web site: Communication and resilience: concluding thoughts and key issues for future research. www.researchgate.net.
  18. Buzzanell. Patrice M.. 2010. Resilience: Talking, Resisting, and Imagining New Normalcies Into Being. Journal of Communication. 60. 1. 1–14. 10.1111/j.1460-2466.2009.01469.x. 1460-2466.
  19. Buzzanell. Patrice M.. March 2010. Resilience: Talking, Resisting, and Imagining New Normalcies Into Being. Journal of Communication. 60. 1. 1–14. 10.1111/j.1460-2466.2009.01469.x. 0021-9916.
  20. Buzzanell. Patrice M.. 2018-01-02. Organizing resilience as adaptive-transformational tensions. Journal of Applied Communication Research. 46. 1. 14–18. 10.1080/00909882.2018.1426711. 149004681. 0090-9882.
  21. Web site: Resilient Organisations. March 22, 2011 .
  22. Web site: Resilience Diagnostic . November 28, 2017.
  23. ISO, ISO 22301 Business Continuity Management: Your implementation guide, published, accessed 20 February 2021
  24. Web site: Emergency Planning. https://ghostarchive.org/archive/20221009/http://www.jcrcny.org/wp-content/uploads/2013/10/EmergencyManual.2.0.pdf . 2022-10-09 . live.
  25. Web site: RI.gov . Can your Organization survive a natural disaster? . https://ghostarchive.org/archive/20221009/http://www.riema.ri.gov/berhodyready/files/Session_1_Business%20Continuity.pdf . 2022-10-09 . live. Helen Clark . August 15, 2012.
  26. Web site: May. Richard. Finding RPO and RTO . dead . https://web.archive.org/web/20160303224604/http://www.virtualdcs.co.uk/blog/business-continuity-planning-rpo-and-rto.html. 2016-03-03.
  27. Web site: Maximum Acceptable Outage (Definition) . 4 October 2018 . riskythinking.com . Albion Research Ltd..
  28. Web site: BIA Instructions, BUSINESS CONTINUITY MANAGEMENT - WORKSHOP . https://ghostarchive.org/archive/20221009/http://www.driecentral.org/biainstructions.pdf . 2022-10-09 . live . driecentral.org . 4 October 2018 . Disaster Recovery Information Exchange (DRIE) Central.
  29. Web site: Plain English ISO 22301 2012 Business Continuity Definitions . praxiom.com . Praxiom Research Group LTD. . 4 October 2018.
  30. Web site: Baseline Cyber Security Controls . 12 . Ministry of Interior - National Cyber Security Center . 2022.
  31. Web site: The Rise and Rise of the Recovery Consistency Objective . September 9, 2019 . 2016-03-22 . 2020-09-26 . https://web.archive.org/web/20200926060225/https://www.opscentre.com/blog/2016/03/22/recovery-consistency-objective/ . dead .
  32. "How to evaluate a recovery management solution." West World Productions, 2006 http://www.thefreelibrary.com/How+to+evaluate+a+recovery+management+solution-a0147748661
  33. Web site: Josh Krischer . Donna Scott . Roberta J. Witty . Six Myths About Business Continuity Management and Disaster Recovery . Gartner Research . https://ghostarchive.org/archive/20221009/http://www.gartner.com/it/content/868800/868812/six_myths_about_bcm.pdf . 2022-10-09 . live.
  34. 10.1016/j.ijpe.2009.10.004 . Medical supply location and distribution in disasters.
  35. Web site: transportation planning in disaster recovery . https://ghostarchive.org/archive/20221009/https://orbi.uliege.be/bitstream/2268/8333/1/JORS_Barbarosoglu_Arda_2004.pdf%26hl=en%26sa=X%26scisig=AAGBfm0xx_ynzP503rz-gtdgZVSN_h-m7w%26nossl=1%26oi=scholarr . 2022-10-09 . live . SCHOLAR.google.com.
  36. Web site: PLANNING SCENARIOS Executive Summaries. https://ghostarchive.org/archive/20221009/https://www.globalsecurity.org/security/library/report/2004/hsc-planning-scenarios-jul04_exec-sum.pdf . 2022-10-09 . live.
  37. Chloe Demrovsky . Holding It All Together . Manufacturing Business Technology . December 22, 2017.
  38. developed by SHARE's Technical Steering Committee, working with IBM
  39. Web site: A Business Continuity Solution Selection Methodology . https://ghostarchive.org/archive/20221009/https://share.confex.com/share/118/webprogram/Handout/Session10387/Session%2010387%20Business%20Continuity%20Soloution%20Selection%20Methodology%2003-7-2012.pdf . 2022-10-09 . live. IBM Corp.. Ellis Holman . March 13, 2012.
  40. Tierney . Kathleen . Disaster Governance: Social, Political, and Economic Dimensions . Annual Review of Environment and Resources . 21 November 2012 . 37 . 1 . 341–363 . 10.1146/annurev-environ-020911-095618 . 154422711 . en . 1543-5938. free .
  41. Book: Partridge . Kevin G. . 2011 . Young . Lisa R. . CERT® Resilience Management Model (RMM) v1.1: Code of Practice Crosswalk Commercial Version 1.1 . Carnegie Mellon University . Pittsburgh, PA . 5 January 2023.
  42. Web site: ISO - ISO/TC 292 - Security and resilience . International Organization for Standardization.
  43. Web site: ISO 22300:2018. ISO. 12 July 2019 .
  44. Web site: ISO 22301:2019. ISO. 5 June 2023 .
  45. Web site: ISO 22313:2020. ISO.
  46. Web site: Iso/Ts 22317:2021.
  47. Web site: Iso/Ts 22318:2021.
  48. Web site: ISO/TS 22330:2018. ISO. 12 July 2019 .
  49. Web site: ISO/TS 22331:2018. ISO.
  50. Web site: Iso/Ts 22332:2021.
  51. Web site: ISO/IEC TS 17021-6:2014. ISO.
  52. Web site: ISO/IEC 24762:2008 . ISO . 6 March 2008 . 5 January 2023 . en.
  53. Web site: ISO/IEC 27001:2022 . ISO . 5 January 2023 . en.
  54. Web site: ISO/IEC 27002:2022 . ISO . 5 January 2023 . en.
  55. Web site: ISO/IEC 27031:2011 . ISO . 5 September 2016 . 5 January 2023 . en.
  56. Web site: ISO/PAS 22399:2007 . ISO . 18 June 2012 . 5 January 2023 . en.
  57. Web site: IWA 5:2006 . ISO . 5 January 2023 . en.
  58. Web site: BS 7799-1:1995 Information security management - Code of practice for information security management systems . BSI Group . 5 January 2023.
  59. Web site: BS 25999-1:2006 Business continuity management - Code of practice . BSI Group . 5 January 2023.
  60. Web site: BS 25999-2:2007 (USA Edition) Business continuity management - Specification . BSI Group . 5 January 2023.
  61. Web site: BS 25777:2008 (Paperback) Information and communications technology continuity management. Code of practice . BSI Group . 5 January 2023.
  62. British Standards Institution (2006). Business continuity management-Part 1: Code of practice :London
  63. Cabinet Office. (2004). overview of the Act. In: Civil Contingencies Secretariat Civil Contingencies Act 2004: a short. London: Civil Contingencies Secretariat
  64. Web site: July 2013 (V2) The role of Local Resilience Forums: A reference document . Cabinet Office . 5 January 2023.
  65. Web site: HB HB 292—2006 Executive Guide to Business Continuity Management . Standards Australia . 5 January 2023.
  66. Web site: HB 293—2006 Executive Guide to Business Continuity Management . Standards Australia . 5 January 2023.
  67. Book: NFPA 1600, Standard on Disaster/Emergency Management and Business Continuity Programs . 2010 . National Fire Protection Association . Quincy, MA . 978-161665005-6 . 2010 .
  68. Web site: A Comprehensive Overview of the NFPA 1600 Standard . AlertMedia . 4 January 2023 . en . 29 January 2019.
  69. Web site: NATIONAL CONTINUITY POLICY IMPLEMENTATION PLAN Homeland Security Council August 2007 . FEMA . 5 January 2023.
  70. Web site: Continuity Resources and Technical Assistance FEMA.gov . FEMA . 5 January 2023 . en.
  71. Web site: Continuity of operations: An overview . FEMA . 5 January 2023.
  72. Web site: Business Ready.gov . www.ready.gov . 5 January 2023.
  73. Web site: Business Continuity Planning Suite Ready.gov . www.ready.gov . 5 January 2023.
  74. Web site: Business Continuity Plan Ready.gov . www.ready.gov . 5 January 2023.
  75. Book: ASIS SPC.1-2009 Organizational Resilience: Security, Preparedness, and Continuity Management Systems - Requirements with Guidance for Use . 2009 . American National Standards Institute . 978-1-887056-92-2 .
  76. Web site: Business Continuity Plan Template.
  77. Web site: Glossary | DRI International. drii.org.
  78. Web site: CMS.gov. Disaster Recovery Plan Checklist. https://ghostarchive.org/archive/20221009/https://www.cms.gov/Medicare/Medicare-Contracting/FFSProvCustSvcGen/Downloads/Disaster-Recovery-Plan-Checklist.pdf . 2022-10-09 . live .
  79. Web site: Validation of a Disaster Management Metamodel (DMM) . Othman. SCHOLAR.google.com.