Burgas–Alexandroupoli pipeline explained

Burgas–Alexandroupoli pipeline
Type:Petroleum
Map:Map of Burgas-Alexandroupolis pipeline.png
Country:Bulgaria, Greece
Operator:Trans-Balkan Pipeline B.V.
Partners:Transneft, Rosneft, Gazprom Neft, Technoexportstroy, Hellenic Petroleum, Prometheus Gas, Latsis Group, Government of Greece
Length Km:279
Discharge:35 million tons per year
Diameter In:36
Start:Burgas (Bulgaria)
Finish:Alexandroupoli (Greece)
Pumping Stations No:3

The Burgas–Alexandroupoli pipeline was a proposed oil pipeline project for transportation of Russian and Caspian oil from the Bulgarian Black Sea port of Burgas to the Greek Aegean port of Alexandroupoli. It was seen as an alternative route for Russian oil, bypassing the Bosporus and the Dardanelles. However, in December 2011 the project was suspended by the Bulgarian government due to environmental and supply concerns.

Bulgaria is seeking to revive this idea, and the idea was once again proposed in 2023 due to the Invasion of Ukraine.

History

The pipeline project was proposed in 1993–1994 by several Russian and Greek companies.[1] In 1994, for construction of the pipeline Greece and Bulgaria signed a bilateral agreement, followed by a memorandum of cooperation, signed by Greece and Russia.[2]

In February 1998, a Greek consortium for pipeline construction named Bapline was established, and in May 1998, a memorandum of creation of the Transbalkan Oil Pipeline Company was signed.[2] In 2000, a technical specifications and an economic evaluation of the project were prepared by the German company ILF.[1]

A joint protocol for preparing the pipeline's construction was signed by the three countries in January 2005.[3] The political memorandum between governments was signed on 12 April 2005. An inter-governmental agreement on the project was agreed on 7 February 2007, and it was signed on 15 March 2007 in Athens, by the relevant ministers of the three countries, in the presence of their leaders, Vladimir Putin (Russian president), Sergey Stanishev (Bulgarian prime-minister), and Kostas Karamanlis (prime-minister of Greece).[4] [5] The agreement establishing the international project company was signed in Moscow on 18 December 2007 and the company—Trans-Balkan Pipeline B.V.—was incorporated in the Netherlands on 6 February 2008.[6]

Construction of the pipeline was scheduled to start in October 2009, and was estimated to be completed by 2011.[7] However, the project was delayed as the Bulgarian government coming to power in July 2009 started to reconsider its participation in the project.[8] On 19 October 2009, Italy, Russia and Turkey signed an inter-governmental agreement agreeing the participation of Russian oil companies in the competing Samsun-Ceyhan pipeline project.[9] On 11 June 2010, Prime Minister of Bulgaria Boyko Borisov announced that Bulgaria would not participate in the project due to strong opposition from the local population of Burgas. Later it was said that the government would await an environmental impact assessment before making a final decision about termination of the project.[10] On 7 December 2011, the Bulgarian government officially decided to terminate its participation in the project and proposed that the tripartite inter-governmental agreement be terminated by mutual consent.[11] [12]

In 2023, Bulgaria sought to revive this project to the Russo-ukrainian war, and Russia producing more oil starting in 2024.

Technical features and financing

The main pipeline with a diameter of 36inches would be 279km (173miles) long, and it would transport 15-23 million tons of oil per year during the first phase, as well as 35 million during the second.[1] The pipeline would have three oil refilling stations, two of which in Bulgaria (the first one at Neftochim close to Burgas) and one at Alexandroupoli. The project included reconstruction of Burgas and Alexandroupolis terminals, including oil tanks with a capacity of 600,000 tons in Burgas, and 1,200,000 tons in Alexandroupolis.

The pipeline was expected to cost up to €1 billion.[13] The investment scheme was not agreed, and it was not decided from which sources the pipeline would be filled.[5]

International project company

The pipeline was to be constructed and owned by the Dutch-registered Trans-Balkan Pipeline B.V.[14] In this company, a stake of 51% of shares belongs to the Burgas–Alexandroupolis Pipeline Consortium, a joint venture of Russian Transneft, Rosneft and Gazprom Neft.[15] Bulgarian Burgas–Alexandroupolis Project Company-BG, a subsidiary of Technoexportstroy, owns 24.5% of shares. Greece consortium HELPE S.A. - THRAKI S.A., a joint venture between Hellenic Petroleum and Thraki, which is owned by Prometheus Gas and the Latsis Group, owns 23.5%, while the Government of Greece has 1%.[16]

There were speculations that the part of Bulgarian and Hellenic stakes could be sold to other oil companies as Chevron, TNK-BP and KazMunayGas.[5] Kazakhstan's Energy Minister Baktykozha Izmukhambetov had said that Kazakhstan wants to buy a stake in the pipeline consortium.[17]

Controversy

There were several competitive pipeline projects, such as the AMBO pipeline from Burgas to Vlorë, Pan-European Pipeline from Constanţa to Trieste, Odesa-Brody-Plotsk pipeline, Kıyıköy-İbrice pipeline, and Samsun-Ceyhan pipeline — all aimed to transport oil from the Black Sea bypassing Turkish straits. The project of the Burgas–Alexandroupoli pipeline was described as one of the shortest pipeline through a plain terrain and therefore to be one of the cheapest and cost effective.[18] The critics of the Burgas–Alexandroupoli pipeline project raised environmental concerns because of oil tankers traffic in the Aegean Sea, which contains numerous submerged rocks and island populations dependent on tourism and fishing.[19] It has been mentioned that a possible oil spill in the Aegean would be devastating for Greece's tourism industry.[20] The residents of Burgas and Sozopol in Bulgaria voted against in the pipeline in local referendums in the spring of 2008.[21]

See also

Notes and References

  1. News: Burgas-Alexandrupolis Pipeline Project . . 2007-02-15 . https://web.archive.org/web/20061004031928/http://www.transneft.ru/Projects/Default.asp?LANG=EN&ID=229 . 2006-10-04 . dead .
  2. News: Everybody wins . Peggy Papakosta . Bridge Magazine . 2007-02-15 . dead . https://web.archive.org/web/20070928133620/http://www.bridge-mag.com/magazine/index.php?option=com_content&task=view&id=111&Itemid=31 . 2007-09-28 .
  3. News: Greece, Russia, Bulgaria move closer to building Burgas–Alexandroupoli pipeline . 2005-01-29 . Embassy of Greece to the United States . 2006-05-07 . dead . https://web.archive.org/web/20070311033919/http://www.greekembassy.org/Embassy/content/en/Article.aspx?office=8&folder=531&article=14580 . 2007-03-11 .
  4. News: Bulgaria, Greece, Russia finalize details on long-awaited pipeline deal . 2007-02-06 . Associated Press . 2008-02-24 . dead . https://web.archive.org/web/20080306112432/http://www.pdi.ie/nl/News-And-Events/Economy/Bulgaria-Greece-Russia-Finalize-Details-on-Long-awaited-Pipeline-Deal.html . 2008-03-06 .
  5. News: Burgas–Alexandroupolis project getting underway, but many questions remain . 2007-02-08 . RBC Daily . 2007-02-15.
  6. News: Trans-Balkan partners form operator . . NHST Media Group . 2007-12-18 . 2007-12-19 . subscription .
  7. News: Trans-Balkan Oil Pipeline Hit By Delays . Downstream Today . 2008-10-17 . 2009-03-15.
  8. News: Bulgaria bins trans-Balkan pipe plan . . NHST Media Group . 2010-06-11 . 2010-06-12 . subscription .
  9. News: . Russia to supply oil to Samsun-Ceyhan pipeline . Stephen Jewkes . 2009-10-19 . 2009-10-24.
  10. News: . Bulgaria likely to abandon trans-Balkan oil pipeline . Tsvetelia Tsolova; Irina Ivanova . 2010-06-11 . 2010-06-12.
  11. News: Focus News Agency . World media about Bulgari's decision on Burgas-Alexandroupolis oil pipeline (Review) . 2011-12-07 . 2011-12-07.
  12. News: Focus News Agency . Bulgaria Abandons Burgas-Alexandroupolis Oil Pipeline . 2011-12-07 . 2011-12-07.
  13. News: Russia agrees to speed up Balkan oil pipeline project . 2006-09-04 . International Herald Tribune . 2006-09-23.
  14. News: Norton Rose Group advises on Burgas–Alexandroupolis pipeline project . Norton Rose Group . 2008-03-05 . 2008-06-12 . dead . https://web.archive.org/web/20081117004427/http://www.nortonrose.com/news/latest/news14271.aspx?lang=en-gb . 2008-11-17 .
  15. News: Transneft, Rosneft and Gazprom Neft set up consortium . RBC News . 2007-02-10 . 2007-02-14 . https://web.archive.org/web/20070207045725/http://top.rbc.ru/english/index.shtml?%2Fnews%2Fenglish%2F2007%2F02%2F02%2F02091504_bod.shtml . 2007-02-07 . dead.
  16. News: State of registration for Bourgas-Alexandroupolis oil pipeline project company to be proposed within week . https://web.archive.org/web/20111004080645/http://bsanna-news.ukrinform.ua/newsitem.php?id=1314&lang=en . dead . 2011-10-04 . 2007-07-13 . BSANNA News . 2008-03-05 .
  17. News: Balkan pipeline talks on table . . NHST Media Group . 2007-04-19 . 2007-04-21 . subscription .
  18. Web site: Burgas–Alexandroupolis Oil Pipeline Project . Christos Dimas . 3rd Emerging Europe Energy Summit . 2007-11-08 . Bapline . 2008-03-05 . dead . https://web.archive.org/web/20090305075212/http://www.doingbusiness.ro/energy2007/presentations/getfile.php?filename=AMBO-Christos_Dimas.pdf . March 5, 2009 .
  19. Time to wake up from South-East Europe's pipeline dreams . 2006-03-03 . CEE Bankwatch Network . Bankwatch Mail . 27 . 2007-02-15 . https://web.archive.org/web/20070106070318/http://www.bankwatch.org/publications/mail.shtml?x=1563936#time . 2007-01-06 . dead .
  20. News: AMBO Trans-Balkan Pipeline Agreement Finally Signed . 2004-12-29 . Balkananalysis.com . 2007-02-15 . https://web.archive.org/web/20080120145401/http://www.balkanalysis.com/2004/12/29/ambo-trans-balkan-pipeline-agreement-finally-signed/ . 2008-01-20 . dead .
  21. News: Burgas–Alexandroupolis Construction Set To Start Next Year . Downstream Today . 2008-06-09 . 2008-06-12.