Bundesautobahn 10 Explained

Country:DEU
Type:A
Route:10
Map Custom:yes
Map:
Map Notes:Map of Berlin (A 10 highlighted)
Length Km:196
States:Berlin, Brandenburg
Previous Type:A
Previous Route:9
Next Type:A
Next Route:11

is an orbital motorway around the German capital city of Berlin. Colloquially called Berliner Ring (Berlin Beltway), it is predominantly located in the state of Brandenburg, with a short stretch of 5abbr=inNaNabbr=in in Berlin itself. It should not be confused with the Berliner Stadtring (Bundesautobahn 100) around Berlin's inner city.

With a total length of 196km (122miles), the BAB 10 is the longest orbital in continental Europe (Route 1 in Iceland is 1,322 km (821 mi)). The BAB 10 is 8abbr=inNaNabbr=in longer than the M25 motorway around London.

Course

The highway route markers run clockwise from the interchange at Schwanebeck (the former Prenzlau branch-off), where the Bundesautobahn 11 runs to Szczecin, Poland via the Pomellen/Kołbaskowo border crossing and the Polish A6 autostrada. From here the beltway leads southwards to the Spreeau interchange with the Bundesautobahn 12 to Frankfurt (Oder) and the Polish A2 autostrada. At the Schönefeld four-way interchange, the Bundesautobahn 13 leads to Dresden and the Bundesautobahn 113 to the Berliner Stadtring and the Berlin city centre via Berlin Brandenburg Airport.

The Berliner Ring then runs westwards to Nuthetal, where the Bundesautobahn 115 (including the former AVUS race track) also links to the Stadtring at the Funkturm Berlin. Next the Bundesautobahn 9 leads to Munich (at the Potsdam interchange) and the Bundesautobahn 2 to the Ruhr area (at Werder). From here the beltway runs northwards to the Dreieck Havelland interchange with the Bundesautobahn 24 to Hamburg, and finally turns eastwards to the Oranienburg and Pankow interchanges with the Bundesautobahn 111 and Bundesautobahn 114 motorways both leading to the Berliner Stadtring. It again reaches Schwanebeck at km 196.

The beginning and end of the kilometer is the cross Barnim, which until 2013 Dreieck Schwanebeck was called. From there, the A11 from Stettin / Prenzlau joins the A10. In the direction of the kilometering (clockwise), the A12 leads from the outside at the triangle Spreeau, at the junction Schoenefeld the A13, at the triangle Potsdam the A9, at the triangle Werder the A 2 and at the triangle Havelland the A 24 in the Berliner Ring. The highway is connected to the Berliner Stadtring (A 100) and other parts of Berlin via the A 111 (Oranienburg), A 114 (Pankow), A 113 (Kreuz Schönefeld) and A 115 (Nuthetal), the northern part is called AVUS known), which open from the inside into the ring. The junctions Ludwigsfelde-Ost and Berlin-Spandau as well as the Oranienburg cross lead to motorway-like developed federal highways.

History

The first sections near Werder, Schwanebeck and Spreeau were opened between 1936 and the outbreak of World War II in 1939 as part of the Reichsautobahn program. Construction works were not resumed until 1972, when the East German authorities began to complete the orbital, in order to bypass West Berlin on the way from the capital East Berlin to Potsdam and the motorways leading to Magdeburg and Leipzig. The final stretch opened in 1979.

YearFromTo
1936 Anschlussstelle Groß-Kreutz
1936 ehem. Anschlussstelle Weißensee Autobahndreieck Barnim
1937Autobahndreieck Barnim Dreieck Spreeau
1937 Anschlussstelle Michendorf Dreieck Werder
1938 Dreieck Spreeau Anschlussstelle Michendorf
1939 Anschlussstelle Groß-Kreutz Anschlussstelle Potsdam-Nord

Those that are built from 1972 to 1979:

YearFromTo
1972 Anschlussstelle Birkenwerder
1973 Anschlussstelle BirkenwerderDreieck Pankow
1974 Dreieck Pankow ehem. Anschlussstelle Weißensee
1979 Anschlussstelle Potsdam-Nord Dreieck Havelland

In the section between the former Berlin-Weißensee junction and the Berlin-Spandau interchange, the freeway completed today does not follow the original route.

East of today's triangle Pankow (A 114) on the B 109 the junction Pankow-Wandlitz should be created. From there, the projected route between the villages of Mühlenbeck and Schildow ran through to the planned Nordkreuz, which was to be built around one kilometer south of Schönfließ. It was planned to create a motorway interchange from the current A 11 south of Lanke to the designated feeder road in Wittenau. In the further course, the connection points Reinickendorf-Oranienburg were planned on the B 96 south of the Invalidensiedlung in Reinickendorf and Tegel-Hennigsdorf south of Velten. From there, the proposed route followed essentially the present day Berlin railroad outer ring to the junction Spandau-Pausin on the L 16. Immediately south of today's Havel Canal was the Hamburg Cross projected. From the planned junction Heerstraße-Nauen on the B 5 (today's name: Berlin-Spandau), the Berliner Ring has been built up to the junction Potsdam-Nord on the original route.

During the construction of the motorway Berlin-Szczecin-South (today: Kołbaskowo) in 1936 was built in the northern branch of the intersection Weißensee a gas station, which was however demolished without replacement in the course of the further construction of the ring and the redesign of the junction. During the reconstruction of the AD Schwanebeck (today: motorway junction Barnim) in 2012, part of the area was uncovered. The two fuel tanks still in the ground were full of water, but could be easily removed.

Planning

According to a press release by Brandenburg Transport Minister Jörg Vogelsänger on 1 February 2011, the motorway from the Junction Kremmen-South on the A 24 via the Havelland triangle to the Barnim cross in 2022 will be passable in six lanes. This relieves the busy northern Berliner Ring. At Oranienburg alone, 51,000 vehicles a day are on the road, just under a fifth of which are trucks. The total cost of the project is expected to total around 300 million euros.

In the course of expansion, the triangle Schwanebeck was redesigned into a motorway junction and renamed "Cross Barnim". The main roadway is now the Berliner Ring and not the direction of the northern Berliner Ring - A 11. The Berlin-Weißensee junction is omitted because of the immediate proximity to the motorway junction. Instead, the B 2 was transferred directly to the A 11 and at the same time the A 11 to 2.0 km fundamentally removed and rebuilt. The construction work began in the spring of 2010 with extensive clearing measures in the area of the motorway triangle Schwanebeck (construction plan) and the bridge construction between Weissensee and the triangle Pankow on the A 10. The groundbreaking ceremony for the conversion took place on 5 May 2011. After a construction period of 29 months, the motorway junction was officially handed over to traffic on November 11, 2013.

In July 2011, the planning approval decision for the six-lane expansion from the Neuruppin junction (A 24) to the junction Oberkrämer (A 10) including the reconstruction of the Havelland triangle was published. On 17 September 2012, the symbolic groundbreaking ceremony for the expansion of the section triangle Havelland Kremmen. Overall, it was expected to cost 52 million euros. The European Union contributed €18 million to the financing from the European Regional Development Fund. The developed section was put into operation on September 27, 2014. In addition, on 7 October 2015, the developed section of Berlin was opened to traffic.

The route between the triangle Nuthetal and the triangle Potsdam should be expanded eight-lane. The construction costs are estimated at around 123 million euros, the plan approval decision is available since January 2013. 61 additional truck parking spaces are planned for the Michendorf service area. The afforestation as a compensatory measure for the environment are now carried out close to local complaints, instead of as originally planned by Ribbeck or Thyrow, also the use of open-pored asphalt (whispering asphalt) at Michendorf has now been included in the planning. On the noise barriers to be built originally photovoltaic systems were planned with a capacity of about 7.5 MWp. The tendering procedure for the construction of these "solar noise barriers" started in September 2013 and a private investor was to be found for this purpose. This was to bear the costs of increasing the originally planned six to eight-meter-high noise barriers to about ten meters and recover the associated additional costs of marketing the solar power. After no investor found this, the project for the construction of the photovoltaic systems and the increase of the noise protection walls is considered as failed. The start of construction of the section took place with the official ground-breaking ceremony on March 31, 2016, the costs are now reported at 150 million euros.

The section between the triangle Werder and Groß Kreutz is to be expanded to six lanes. These measures are in the urgent need of the Federal Transport Infrastructure Plan. The replacement of the bridge over the Zernsee between the junctions Phöben and Leest has already been built six lanes, with currently only two lanes are released in each direction. Furthermore, the six-lane extension between Groß Kreutz and Havelland is planned (further demand with planning rights). In the area of the Berlin-Spandau interchange, the overpass of the newly built Federal Highway 5 has already been prepared for the upcoming expansion, as well as the double bridge over the Havel Canal in the further course.

Exit list

scope=colStatescope=colDistrictscope=colMunicipalityscope=colkm[1] scope=colmiscope=colExitscope=colNamescope=colDestinationsscope=colNotes
BrandenburgBarnimPanketal195.8
0.0
1Dreieck Barnim
Bernau bei BerlinNo major junctions
Ahrensfelde3.62Berlin-Hohenschönhausen
Märkisch-OderlandHoppegartenNo major junctions
Altlandsberg10.93Berlin-MarzahnMarzahn, Altlandsberg, Strausberg
Neuenhagen bei Berlin12.3TRSeeberg
Fredersdorf-Vogelsdorf18.74Berlin-Hellersdorf
Rüdersdorf bei Berlin21.65RüdersdorfRüdersdorf, Woltersdorf, Schöneiche
24.8PWCKalkbergeCounterclockwise direction only
Oder-SpreeWoltersdorf27.0PWCKranichbergeClockwise direction only
Erkner28.66ErknerErkner, Köpenick, Grünheide (Mark), AM Erkner
32.57FreienbrinkFreienbrink, GVZ Freienbrink, Hangelsberg
Gosen-Neu ZittauNo major junctions
Spreenhagen40.58Dreieck Spreeau
Dahme-SpreewaldKönigs Wusterhausen43.2PWCUckleyseeClockwise direction only
43.3PWCLankenseeCounterclockwise direction only
46.49NiederlehmeNiederlehme, Zernsdorf, Königs Wusterhausen port
Wildau and Zeuthen50.510Königs Wusterhausen
Schönefeld54.011Schönefelder Kreuz
Mittenwalde58.0-58.2TRAm Fichtenplan
Teltow-FlämingRangsdorfNo major junctions
Blankenfelde-Mahlow61.412Rangsdorf
RangsdorfNo major junctions
Blankenfelde-Mahlow66.9PWCJünsdorfer HeideClockwise direction only
Ludwigsfelde70.713GenshagenGenshagen
72.514Ludwigsfelde-Ost
78.215Ludwigsfelde-WestLudwigsfelde
79.1PWCSchieferbergCounterclockwise direction only
79.9PWCSiethener ElsbruchClockwise direction only
NuthetalNo major junctions
Potsdam-MittelmarkMichendorf86.816Dreieck Nuthetal
90.917Michendorf
91.5-91.7TRMichendorf
Seddiner See and Schwielowsee94.518FerchFerch, Neuseddin
Schwielowsee98.919Dreieck Potsdam
102.220GlindowGlindow, Werder (Havel), Klaistow
103.7PWCCaputhClockwise direction only
Werder (Havel)104.2PWCSchwielowseeCounterclockwise direction only
Kloster Lehnin107.821Dreieck Werder
Werder (Havel)114.322Groß Kreutz
119.923PhöbenPhöben, Werder (Havel)
121.1PClockwise direction only
122.824LeestLeest, Töplitz
Potsdam127.525Potsdam-Nord
HavellandWustermark133.2-134.3P
136.926Berlin-Spandau
Brieselang139.027BrieselangBrieselang, GVZ Wustermark
Nauen144.128FalkenseeFalkensee, GVZ Brieselang
145.6PClockwise direction only
Schönwalde-Glien149.7-152.0TWolfslake
OberhavelOberkrämer and Kremmen155.029Dreieck Havelland
Oberkrämer161.530OberkrämerOberkrämer, Velten
Velten, Leegebruch, and Hohen Neuendorf167.531Dreieck Kreuz Oranienburg
Birkenwerder173.033Birkenwerder
Hohen Neuendorf176.0-176.4P
Mühlenbecker Land180.234MühlenbeckMühlenbeck, Wensickendorf
181.3-181.6P
BarnimWandlitzNo major junctions
OberhavelMühlenbecker LandNo major junctions
BarnimWandlitz185.935Dreieck Pankow
186.6Brandenburg-Berlin state border
BerlinNo major junctions
191.9Berlin-Brandenburg state border
BrandenburgBarnimPanketal195.8
0.0
1Dreieck Barnim

See also

Notes and References

  1. Web site: Autobahnverzeichnis 2016. de. hbz-nrw.de. 21 August 2023.