Broad Street Line Explained

Broad Street Line (B)
Logo2:SEPTA B icon.svg
Logo Width2:50px
Type:Rapid transit
System:SEPTA Metro
Status:Operational
Locale:Philadelphia, Pennsylvania, U.S.
Start:NRG station (south)
8th & Market (spur south)
End:Fern Rock Transportation Center (north)
Stations:25
Routes:
  • Local
  • Express
  • Spur
Daily Ridership:79,155 (2023)[1]
Open:September 1, 1928
Owner:City of Philadelphia
Operator:1928–39: Philadelphia Rapid Transit Co.
1940–68: Philadelphia Transportation Co.
1968–present: SEPTA
Character:Underground and surface
Depot:Fern Rock Transportation Center
Linelength:12.51NaN1[2]
Tracks:2–4

The Broad Street Line (BSL), currently rebranding as the B, is a rapid transit line in the SEPTA Metro network in Philadelphia, Pennsylvania, United States. The line runs primarily north-south from the Fern Rock Transportation Center in North Philadelphia through Center City Philadelphia to NRG station at Pattison Avenue in South Philadelphia; the latter station provides access to the stadiums and arenas for the city's major professional sports teams at the South Philadelphia Sports Complex, about a quarter mile away. It is named for Broad Street, under which the line runs for almost its entire length.

The line, which is entirely underground except for the northern terminus at Fern Rock, has four tracks in a local/express configuration from Fern Rock to Walnut-Locust and two tracks from Lombard-South to the southern terminus at NRG station. It is one of only two rapid transit lines in the SEPTA Metro system overall alongside the Market–Frankford Line, though Center City Philadelphia is also served by four stations of the PATCO Speedline rapid transit line which runs from Center City Philadelphia through Camden, New Jersey to Lindenwold, New Jersey. With about 115,000 boardings[3] on an average weekday in 2019, it is the second busiest route in the SEPTA system.

The line and its trains were leased to SEPTA in 1968[4] after it assumed operation of the city transit systems from the former Philadelphia Transportation Company (PTC).[5] Broad Street Line subway cars bear both the SEPTA logo and the seal of the City of Philadelphia to reflect the split ownership-operation arrangement.

History

Service on the northern half of the Broad Street Line, between City Hall and Olney Avenue, opened on September1, 1928. While the original subway tunnel had been finished to just north of the present-day Lombard-South station, service to the Walnut-Locust station did not begin until 1930, and the Lombard-South station entered service in 1932. Service from that point south to Snyder Avenue began on September18, 1938. Service to a new park-and-ride station built next to the Fern Rock shops began in 1956, and the line was extended further south to Pattison Avenue in 1973 to serve the recently completed Sports Complex.[6]

The total cost of the original segment, "Olney Avenue to South Street," was stated at $102 million.

Although the Broad Street Line was originally planned in the 1920s to be a 4-track facility for its entire length (Fern Rock portal to Snyder), the tunnel was built with provision for 4 tracks only from the portal to just north of Lombard-South. At the time of opening, the outer 2 tracks were built along this length, whereas the inner 2 express tracks were built only in two sections, from the Fern Rock portal/shops to just south of Olney, and from Girard to their terminus just north of Lombard South. To close the gaps, the two inner express tracks were laid from Erie to Girard in 1959, and again from Olney to Erie in 1991.

From Lombard-South station south to Snyder, the tunnel was constructed differently – only the eastern half of the line was built. The track currently used for southbound trains is actually the northbound express track. The extension in 1973 to Pattison station (now called NRG station) continued this arrangement. Space exists under the western half of Broad Street for the construction of the western half of the tunnel, which would include the remaining 2 tracks and additional island platforms for southbound local and express trains. The resulting infrastructure would match the configuration built in the northern half of the line.

Provisions for flying junctions exist in the tunnels at three locations: north of Olney station, north of Erie station, and between Tasker-Morris and Snyder stations. These were to connect to planned but never built extensions to the north, northeast, northwest and southwest. Tracks were laid in the upper levels of the flying junctions north of Olney and Erie; these have been used over the years to store out-of-service trains and as layover points for express and Ridge Spur trains.

The NRG Station contains a lower level platform (very narrow compared to the very wide upper level platform), built to accommodate additional trains for large crowds at sporting events. Seldom used for passenger service in recent years, these tracks are most often used to store rolling stock and work trains.

Two of the Broad Street subway system's stations have been closed. The Spring Garden station on the Ridge Avenue spur line was closed in 1989. The Franklin Square station on the PATCO route was closed in 1953, reopened in 1976 for the US Bicentennial, then closed again in 1979. It is scheduled to reopen (after a major renovation) in 2024.[7]

The Broad Street Line is one of only two rapid transit lines in the United States outside of New York City to use separate local and express tracks for a significant length, the other being Chicago's North Side Main Line from Armitage north, used by Purple Line express trains.

During early 2020, the line operated "Lifeline Service" due to the COVID-19 pandemic in Pennsylvania. From April 2020, trains bypassed the,,,,,,, and stations. All stations were reopened by July 2020.[8]

In September 2021, SEPTA proposed updating wayfinding across the SEPTA Rail Transit network. Part of the proposal, SEPTA proposed rebranding their rail transit service as "SEPTA Metro", in order to make the system easier to navigate. Under this proposal, services along the Broad Street Line will be rebranded as the "B" lines with an orange color. Each service utilizing the trunk would receive a numeric suffix. Local service would be known as the B1 Broad Street Local, the express and special service as the B2 Broad Street Express and B2 Express Sport Special, and the Broad - Ridge Spur as the B3 Broad–Ridge Express.[9] [10]

Following public feedback, SEPTA revised the Wayfinding Master Plan. Rather than being referred to as the B Lines, the current Broad Street Line would become the B Line. Express and special services would be consolidated into the B2 Broad Street Express, with signage letting riders know whether a train terminates at Walnut–Locust or NRG station. Additionally, SEPTA stated they would pilot neighborhood maps in stations and prioritize the deployment of real-time information signage and on mobile apps.[11]

Proposed extensions

Roosevelt Boulevard

See main article: Roosevelt Boulevard Subway. Both the City of Philadelphia and SEPTA have studied extending the Broad Street Line along Roosevelt Boulevard, in order to serve a growing population in the northeast section of the city. The city government's archives contain a survey report, prepared in 1948, discussing a need for an extension of the Broad Street line from Erie Avenue to the vicinity of Pennypack Circle (see Roosevelt Boulevard).[12] Subway car destination signage even included station and terminus names for major streets along Roosevelt Boulevard such as Rhawn Street, in the newer "South Broad" cars. An expansion into another part of the City could better use the capacity of the four-track trunk line.[13]

In 1964, the city proposed a 9spell=inNaNspell=in, $94million extension of the Broad Street line along Roosevelt Blvd. in conjunction with a new Northeast Expressway to be built by the Pennsylvania Department of Transportation. Development was limited to the building of one subway station by Sears, Roebuck and Company in 1967, at its complex on Roosevelt Boulevard at Adams Avenue, at the cost of $1million, in anticipation of future service. This station was destroyed when the facility was demolished in October 1994.[14] Ultimately the Northeast Expressway was never built, due to lack of funds, and the subway extension remained a paper concept.

On September10, 1999, SEPTA filed a Notice of Intent to prepare an Environmental Impact Statement for the Northeast Extension with the EPA.[15] In December 2001, the Philadelphia City Planning Commission supported extending the Broad Street Line along Roosevelt Blvd. to Bustleton Avenue, where it would be joined by the Market–Frankford Line, extended from its Frankford terminal (now the rebuilt Frankford Transportation Center). The estimated cost had ballooned to $3.4billion.

Philadelphia Naval Yard

Currently, the Broad Street Line terminates southbound at NRG station at Pattison Avenue and three major stadiums. With the redevelopment of the Philadelphia Naval Yard directly to the south, a Health Impact Assessment report was issued in March of 2012 to determine if extending the line to the Naval Yard would be a viable option for commuters. It determined that extending the line to the Naval Yard would more than halve the number of private cars commuting back and forth, with the remainder taking the proposed subway line and/or using a bicycle sidepath. The HIA recommends making an extension of the Broad Street Line a priority, and recently, the extension has garnered much support.[16] [17]

West Philadelphia

A report in the 1940s proposed an extension of the Locust St. subway to West Philadelphia. This line would have run under one of the streets presently served by the subway-surface system. Presumably, the current subway-surface lines would have been converted to bus operation and would have been used to feed this line. It appears that this proposal was replaced by the extension of the subway portion of the subway-surface system in the 1950s.

Northwest

The same report also proposed a northwest extension. This would have branched off at the North Philadelphia station and would have taken over the Pennsylvania Railroad's Chestnut Hill Branch which is still operated today as part of the SEPTA Regional Rail system as the Chestnut Hill West Line.

Operation

Rolling stock

thumb|right|Interior of a Broad Street Line trainThe first set of rail cars for the Broad Street subway was the B-1 cars built in 1926–27 by the J.G. Brill Company. The Pressed Steel Car Company supplied an additional set in 1938 collectively known as the B-2's. The JG Brill Company also built and delivered 26 deluxe art-deco streamlined subway cars to the Delaware River Joint Commission in early 1936 for use on its Bridge Line from 8th and Market into Camden, NJ via the Benjamin Franklin Bridge. These cars were designed to be compatible with the other Broad Street cars, and could run in multiple with them. After the Bridge Line became part of the PATCO Lindenwold Hi-Speedline in late 1968, 23 of these former "Bridge Line" cars were sold to the City of Philadelphia in 1969 to be used on the Broad Street subway, and were designated as the B-3's, until they were retired by early 1984.

The first set has had the second longest lifespan of any subway car in Philadelphia, after that of the Market Street cars built for what ultimately became the Market–Frankford Line. Although the line was a host for the UMTA's State of the Art Car program, real replacements for the Broad Street cars did not come until late 1982, when SEPTA introduced new "B-IV" cars built by Kawasaki, which are currently the only cars operating the line. The cars are 67ft 6in long, 10ft 1.5in wide, and 12ft 3in tall.

Preservation

Service

Three different services run along the Broad Street Line.Whenever problems occur, trains may skip stations.

Panel indicators

valign=top
Entire service panel grid
OLNEY8th–MARKETFERN ROCK
SOUTHNRGERIE
SNYDERWALNUTGIRARD
SPECIALLOCALEXPRESS
Panel denoting Ridge Spur service
OLNEY8th–MARKETFERN ROCK
EXPRESS
Panel denoting Express service
FERN ROCK
WALNUT
EXPRESS
Panel denoting Sports Express service
FERN ROCK
NRG
SPECIALEXPRESS

The Kawasaki B-IV cars feature multi-panel signs to indicate the origin point, destination, and type of service. One sign is mounted on each side of a car, set just inside a window to make it visible from the interior and exterior. A similar, smaller sign is mounted over car-end doors when cab equipment is present; this sign is only visible from the exterior. These signs significantly improved over earlier rolling stock which completely lacked such signage.

Each sign consists of a set of 12 panels arranged in 4 rows of 3 columns each (a 3 x 4 grid). An incandescent light bulb can illuminate each panel. As shown above, the upper three rows indicate station names while the bottom row indicates the type of service. Trains normally light three panels: two station names (origin and destination) and a type of service (local, express, or special). Only significant stations are represented in the grid.

In 1982, following the delivery of the first significant number of B-IV cars, SEPTA assigned these cars to the restoration of express service. The signs were lit to show "OLNEY" "WALNUT" and "EXPRESS". In early 1983, with more B-IV cars arriving and placed into local service, signs showed "FERN ROCK" "PATTISON" and "LOCAL". After delivery of the last cars, Broad–Ridge Spur trains showed "ERIE" "8th-MARKET" (rush hour) or "GIRARD" "8th-MARKET" (off-peak and weekends). Special trains showed "FERN ROCK" "PATTISON" "SPECIAL" "EXPRESS". Subsequent changes to express and Broad–Ridge Spur service patterns led to the current signage: express trains show "FERN ROCK" "WALNUT" "EXPRESS" and Broad–Ridge trains show "OLNEY" "8th-MARKET" "EXPRESS" (weekdays) and "FERN ROCK" "8th-MARKET" "EXPRESS" (weekends). In 2010, with the renaming of the terminal, all signs were updated with "AT&T" in place of "PATTISON", and again with "NRG" replacing "AT&T" in 2018.

Operating times and headways

The local portion of the Broad Street Line carries a headway of 8 minutes or less during the daytime all day weekdays, 10–12 minutes all day on weekends and major holidays, and 12 minutes in the evenings. Weekend night service consists of a 20-minute frequency, while owl bus service early weekday mornings utilize a 15-minute frequency. The express portion of the line ranges from seven minutes during peak hours to 12 minutes off-peak, while the Broad Ridge Spur ranges from 7 minutes during peak hours to 20 minutes off-peak.

ServiceStart TimeEnd Time
Northbound train4:52am12:55am
Southbound train4:45am12:43am
Northbound night owl bus12:22am5:35am
Southbound night owl bus12:14am5:34am
Northbound Broad–Ridge Spur (Monday - Friday)5:45am9:15pm
Southbound Broad–Ridge Spur (Monday - Friday)5:24am8:48pm
Northbound Broad–Ridge Spur (Saturday)6:40am9:26pm
Southbound Broad–Ridge Spur (Saturday)6:17am9:03pm

Broad–Ridge Spur

A two-track spur of the Broad Street Line, known as the Broad–Ridge Spur, diverges from the main line at Fairmount. Originally known as the Ridge–8th Street subway, the line follows Ridge Avenue, southeastward from the intersection of Broad Street, Ridge and Fairmount Avenues to a two-level junction beneath 8th and Race Streets, where tunnels leading to and from the Benjamin Franklin Bridge to Camden connect to it, then proceeds south under 8th Street. At its southern terminus at 8th and Market streets, passengers may transfer to the Market–Frankford Line and the PATCO Speedline. The spur operates Mondays through Saturdays from 6am to 9pm, running two-car trains (though platforms can fit five cars).[24]

Ridge Spur service to 8th and Market streets began on December21, 1932.[25] As part of that project, a tunnel shell running south under 8th Street then west under Locust Street to 18th Street (reusing parts of the never-completed Center City loop constructed in 1917) was completed in 1933 but not outfitted for service.[26] [27] Bridge Line service from 8th and Market to Camden began on June7, 1936, sharing the Ridge Spur platforms at 8th and Market and splitting off from the Ridge Spur just south of Chinatown station.

Beginning in June 1949, Ridge Spur and Bridge Line trains were through-routed at 8th and Market. The unused Locust Street tunnel was completed on February15, 1953; Bridge Line trains were extended to a new terminus at 15th–16th Street station with two intermediate stops, while Ridge Spur trains reverted to running between 8th Street and Girard.[28] [29] In January 1954, due to low ridership, off-peak service and Saturday again began operating between Girard and Camden, with a shuttle train operating between 8th and 16th stations. Sunday service was suspended at that time due to minimal usage.[30] Ridge Spur service was suspended from August23 to 27, 1968, as tracks were switched to a new upper-level terminal platform at 8th Street station to allow conversion of the 8th–Locust Street subway into the Lindenwold High-Speed Line (PATCO Speedline).[31]

The Ridge Spur was closed from February 1981 to September6, 1983, during construction of the Center City Commuter Connection.[32] Spring Garden station, by then exit-only, was closed on September10, 1989, due to safety concerns.[33] [34] Never drawing high ridership, the spur has been proposed for closure on several occasions. The 2014 closure of the Gallery Mall, adjacent to 8th and Market station, caused ridership on the spur to drop by 25%.[35]

Stations

All stations are located in the city of Philadelphia, Pennsylvania. Stations on the Broad–Ridge Spur are shaded in gold. Special extra service for sports and entertainment events makes all express stops between Fern Rock to Walnut–Locust and then continue express to NRG.

Services

Local (B1) Express (B2)

  1. Broad-Ridge Spur
(B3)

NeighborhoodStationB1B2B3ConnectionsWeekday Ridership (2018)[36] Notes
Fern Rock,,
4,498
Logan16,591Serves Einstein Medical Center Philadelphia and La Salle University
2,452

2,087
Hunting Park3,006
7,750Serves Temple University Hospital
Glenwood3,842Serves Maurice H. Kornberg School of Dentistry
Northeast and Keystone Corridor services (at)
, (at),, (at)
4,168
Cecil B. Moore3,392Originally named Dauphin-Susquehanna
7,375Serves Temple University, originally Columbia Avenue
Francisville 15
4,009
2,156
CallowhillClosed since 1989
Chinatown
322Originally named Vine
Market East Market–Frankford Line
Lindenwold Line
,,,
2,254Originally named Market Street
Chinatown7,462Serves the Community College of Philadelphia

3,226Serves the Pennsylvania Convention Center
Center City
Market–Frankford Line (at)


30,506Located in the Downtown Link concourse
Washington Square West Lindenwold Line
,
7,633Serves the Kimmel Center and Academy of Music
2,915Serves University of the Arts, Peirce College, and Graduate Hospital
South Philadelphia3,715Serves the Italian Market
4,505
5,500Serves Methodist Hospital
4,045Serves Marconi Plaza
1,541Serves the South Philadelphia Sports Complex, originally named Pattison and later AT&T

Citations

External links

Notes and References

  1. Web site: Route Operating Statistics . May 6, 2024.
  2. Web site: Philadelphia, Pennsylvania: The Broad Street Subway . January 22, 2005 . https://web.archive.org/web/20050208193312/http://web.presby.edu/~jtbell/transit/Philadelphia/Broad/ . February 8, 2005 . dead .
  3. Web site: July 2019 . Fiscal Year 2020 Annual Service Plan . September 27, 2020 . SEPTA . August 27, 2020 . https://web.archive.org/web/20200827224154/http://septa.org/strategic-plan/reports/FY%202020%20Annual%20Service%20Plan-update.WEB.pdf . dead.
  4. Web site: Student Voices: Phila. threatens to seize subways from SEPTA . May 17, 2007 . https://web.archive.org/web/20150216180542/http://student-voices.org/news/index.php?NewsID=33647 . February 16, 2015 . dead .
  5. Web site: SEPTA . SEPTA history . dead . https://web.archive.org/web/20070520115222/http://www.septa.org/inside/history.html . May 20, 2007 . mdy .
  6. Web site: Stations of The Broad Street Subway . 11 March 2016 . https://web.archive.org/web/20010430052927/http://web.presby.edu/~jtbell/transit/Philadelphia/Broad/stations.html . 30 April 2001 . 1 Mar 2009.
  7. Web site: Franklin Square Station. June 26, 2023. Port Authority Transit Corporation.
  8. Web site: April 2020. SEPTA Transit Network Lifeline Service Schedule. April 14, 2020. SEPTA. April 16, 2020. https://web.archive.org/web/20200416084044/http://septa.org/covid-19/img/2020-covid-service-map.pdf. dead.
  9. News: Vitarelli. Alicia. Staff. SEPTA Metro? Transit agency mulling big changes including new name, map, and signage. WPVI-TV. Philadelphia, PA. September 7, 2021. September 7, 2021.
  10. Web site: Wayfinding Recommendations. SEPTA. September 7, 2021. September 7, 2021. https://web.archive.org/web/20210907141259/https://planning.septa.org/projects/wayfinding-master-plan/recommendations/. dead.
  11. Web site: Design Concept Feedback . 2022-03-18 . planning.septa.org.
  12. http://www.phila.gov/phils/docs/Inventor/textonly/archser/S069.htm City archive on BSS
  13. Web site: Pennsylvania Transit Expansion Coalition (PA-TEC) . Broad Street Line – Boulevard Extension . February 17, 2011 . March 20, 2012 . https://web.archive.org/web/20120320142232/http://www.blvdsubway.pa-tec.org/ . dead .
  14. Web site: Secrets Beneath the Streets . August 23, 2005 . https://web.archive.org/web/20050829185812/http://www.whyy.org/tv12/secrets/subway.html . August 29, 2005 . dead .
  15. Environmental Impact Statement on Transportation Improvements Within the Roosevelt Boulevard Corridor in Philadelphia, Pennsylvania. Federal Register. September 10, 1999. 64. 175. 49271–49273. 10 May 2015.
  16. Web site: Sandy . Smith . Phillmag.com . Metro Corp. . Navy Yard Subway Extension Update: Funding for New Feasibility Study Secured . November 16, 2015 .
  17. Web site: LOWER SOUTH DISTRICT HEALTH IMPACT ASSESSMENT: Summary Report . March 2012 . Philadelphia City Planning Commission.
  18. Web site: nycsubway.org: SEPTA Broad Street Subway. 2021-09-23. www.nycsubway.org.
  19. Web site: About. 2021-09-23. Trackside Brick Oven Pizzeria. en-US.
  20. Web site: IRM Roster - Southeastern Pennsylvania Transportation Authority 55. 2021-09-23. www.irm.org.
  21. Web site: 2011-03-03. Philadelphia Subway #1009 » Rockhill Trolley Museum. 2021-09-23. Rockhill Trolley Museum. en-US.
  22. Web site: SEPTA 1018. live. 23 September 2021. Seashore Trolley Museum. https://web.archive.org/web/20210923221729/https://collection.trolleymuseum.org/browse.php?id=01018RPA . September 23, 2021 .
  23. Web site: DELAWARE RIVER PORT AUTHORITY 1023. live. 23 September 2021. Seashore Trolley Museum. https://web.archive.org/web/20210923221734/https://collection.trolleymuseum.org/browse.php?id=01023RPA . September 23, 2021 .
  24. Web site: Route of the Week – Broad–Ridge Spur . ISEPTAPHILLY Blog . SEPTA.
  25. News: Ridge Ave. Subway to Run Tomorrow . December 20, 1932 . . 1, 6 . Newspapers.com.
  26. News: First Cash Riders Aboard As Locust Subway Opens . February 16, 1953 . 21 . . Newspapers.com.
  27. News: Subway Bids Due for Work On Locust St . . April 10, 1950 . 21 . Newspapers.com.
  28. News: Mere 150 Miles of Cable Stalls Locust Subway Start . . January 5, 1953 . 19 . Newspapers.com.
  29. News: Beginning Sunday, February 15: New Highspeed Rail Service to and through Central Philadelphia via Bridge Line and Locust St. Subway (advertisement) . February 13, 1953 . Philadelphia Transportation Company . Courier-Post . 19 . Newspapers.com.
  30. News: Lack of Riders to Cut Service On Locust Street Subway: Full Shutdown On Sundays Listed by PTC . . January 6, 1954 . 19 . Newspapers.com.
  31. News: Ridge Ave. Subway Halted for Weekend; Buses to Substitute . August 21, 1968 . 41 . . Newspaper.com.
  32. News: Praise, confusion greet reopening of subway spur . Sara . Kennedy . September 7, 1983 . 6B . Newspapers.com . The Philadelphia Inquirer.
  33. News: SEPTA to close Ridge Ave. stop . July 27, 1989 . 24 . . Newspapers.com.
  34. News: Subway Station Closed for Good . 16 . September 11, 1989 . . Newspapers.com.
  35. News: New hope for lonely Broad–Ridge Spur, part of the Center City Loop that never was . August 29, 2019 . Billy Penn . Michaela . Winberg . February 16, 2021.
  36. Web site: July 2019. Fiscal Year 2020 Annual Service Plan. September 27, 2020. SEPTA.