Bridgton and Saco River Railroad explained

Railroad Name:Bridgton and Saco River Railroad
Locale:Maine
Start Year:1883
End Year:1941
Length:21miles
Hq City:Bridgton

The Bridgton and Saco River Railroad (B&SR) was a narrow gauge railroad that operated in the vicinity of Bridgton and Harrison, Maine. It connected with the Portland and Ogdensburg Railroad (later Maine Central Railroad Mountain Division) from Portland, Maine, to St. Johnsbury, Vermont, near the town of Hiram on the Saco River.

History

B&SR design was based on experience of the Sandy River Railroad. Hinkley Locomotive Works modified their gauge Forney design to run boiler first with an extended frame similar to that installed on Sandy River Railroad #1 following a wreck in early 1882. The successful design of the Bridgton Hinkleys was subsequently repeated for the Monson Railroad and the Franklin and Megantic Railway. Construction began in 1882, and trains were running to Bridgton by early 1883.

B&SR used early profits to replace wooden trestles with earthen fills. A 14feet granite masonry arch was constructed over Hancock Brook in 1895.[1] Track was extended to Harrison with 35# steel rails in 1898. Trestles on the Harrison extension had been replaced by earthen fills and plate girder bridges by 1906.[2] Original Hinkley locomotives #1-2 were replaced by #5-6 of an improved design with pilot wheels. B&SR then replaced the original 301NaN1 steel rails from Bridgton Junction to Bridgton with 481NaN1 and 501NaN1 steel rails from 1907 to 1910 before Maine Central Railroad secured control of the B&SR in 1912.[3] [4] [5]

Under Maine Central operation, there were 4 mixed train round trips daily from Harrison to Bridgton Junction and return. The first left Harrison at 5:15 am and the last returned to Harrison at 8:45 pm. Train speed seldom exceeded 20mph. Two passenger train sets were required for this service. The first consisted of baggage #10, RPO #25, and one or two coaches. A couple of bench seats at one end of baggage-RPO #11 provided smoking accommodation for the second train set. Freight traffic in 1913 was 18% outbound lumber, 15% outbound pulpwood, 15% inbound coal, 11% outbound apples and canned corn, 11% manufactured goods, 10% feed & grain, 10% express, and 2% inbound petroleum products.[6] Locomotive #8 was the last locomotive built for the Maine gauge railways.

Bond interest went unpaid in 1926, and the town of Bridgton began a 15-year effort to preserve their railroad. The B&SR was reorganized as the Bridgton and Harrison Railway; but the extension to Harrison was dismantled after locomotive #8 tipped over when the 35# rails sagged in 1930. Locomotive #8 was the heaviest locomotive on any gauge railway in Maine. B&SR became a tourist attraction as the last gauge railroad offering passenger service in the late 1930s. Operation ceased in September 1941. The rolling stock was preserved when the rails were converted to scrap metal as the United States prepared for World War II. The rolling stock was moved to Massachusetts for another half-century of operation on the Edaville Railroad after the war. Subsequent to the restructuring of the Edaville Railroad, the historic Bridgton and Saco narrow gauge equipment returned to the state of Maine and are mostly located at the Maine Narrow Gauge Railroad Co. & Museum in Portland.

There are still signs of the B&SR evident in a few places if one searches carefully for them. Members of the Wiscasset, Waterville and Farmington Railway Museum have organized informal tours in the past several years to explore these remains. A new group, the Bridgton & Saco River Railroad Museum, was established in 2020 and have plans to build a new railyard in Bridgton for a museum and possible tourist railroad on the original right of way between Sandy Creek and Perleys Mills. More info can be found about this new revival of the Bridgton & Saco River on their website at Bridgtonrailroad.org.

Geography

Bridgton and Saco River Railroad (Main Line)
Linelength Mi:20.7

Milepost 0: Bridgton Junction - Interchange yard with the Portland and Ogdensburg (later Maine Central Railroad Mountain Division.) Agent's station shared with Maine Central Railroad. B&SR had 6 northbound spurs plus a turntable with a single-stall enginehouse. The freight house spur was dual gauge, and there was a second dual gauge spur for loading and unloading narrow gauge-equipment on standard-gauge cars. There was no runaround track; so southbound B&SR locomotives uncoupled their train on the main line, moved into the yard, threw a turnout, and let their train roll past them into the yard by gravity to avoid being trapped at the end of the spur.

Milepost 0.8: Scribner's - southbound spur.

Milepost 1: granite masonry arch over Hancock Brook.

Milepost 1.2: Small's

Milepost 2.0: Rankin's Mill - small flag stop passenger shelter.

Milepost 2.7: Mullen Siding - northbound spur.

Milepost 3: Summit - highest point on the railroad.

Milepost 4: Fill over the north end of Barker pond with granite masonry abutments for a short timber stringer span on the boundary between Hiram and the town of Sebago.

Milepost 4.4: Twin Lake - small flag stop passenger shelter.

Milepost 5.4: Gravel Pit - northbound spur.

Milepost 7: The Notch - a rock cut.

Milepost 7.2: West Sebago - southbound spur with small flag stop passenger shelter.

Milepost 7.5: Water Tank Siding - passing siding adjacent to Hancock Pond. The main line ran between Hancock Pond and B&SR superintendent Joseph Bennett's lakeside cottage a short distance south of the covered water tank.

Milepost 9.0: Perley's Mills - southbound spur with small flag stop passenger shelter.

Milepost 10.5: Ingall's Road - southbound spur with small flag stop passenger shelter.

Milepost 11.3: Kennett's - southbound spur.

Milepost 12.1: South Bridgton - southbound spur with small flag stop passenger shelter.

Milepost 13: high fill with granite masonry abutments for a short timber stringer span over Willett Brook.

Milepost 13.5: Sandy Creek - agent's station with passing siding serving a sawmill.

Milepost 15.8: Bridgton - had the largest population of any village served by the Maine gauge railroads. The yard was on the stub of a wye with branches to Harrison and Bridgton Junction. There were 2 storage sidings and 4 spurs serving the agent's station, a separate freight house, a team track, an oil distributor, a grain store, the B&SR shop, and a turntable with a 4-stall enginehouse.

Milepost 15.9: Farmers Market - two northbound spurs (one was a coal trestle.)

Milepost 16.4: Forest Mills—passing siding with a northbound coal trestle spur.

Milepost 19.5: North Bridgton - agent's station with passing siding serving a separate freight house.

Milepost 20.7: Harrison - agent's station with a passing siding and several southbound spurs serving a freight house, a cannery, a grain store, a 2-track car shed, and a turntable with a single-stall enginehouse.

Master Mechanic Caswell

Bridgton machine shop foreman Millard M. "Mel" Caswell was born in 1850.[7] He took an early interest in mechanical affairs of the proposed railroad and served as master mechanic for the B&SR until he retired in 1926. He remained interested in the railroad and frequently attended the railfan excursions of the 1930s. His son, Wilfred H. Caswell, was born in 1876 and shared his father's mechanical aptitude. Wilfred Caswell was the engineer assigned to the construction train for the Harrison extension in 1898. Wilfred was the Portland Company mechanical engineer who supervised construction of the first Maine narrow gauge Forney locomotive with a pilot truck (B&SR locomotive number 5) in 1906. Wilfred then served as a consulting engineer for Baldwin Locomotive Works during construction of B&SR locomotive number 6 and an identical locomotive for the Sandy River Railroad. In May 1909 Wilfred became master mechanic of the Sandy River and Rangeley Lakes Railroad (SR&RL). Wilfred's early recognition of the technical value of photography produced excellent photographic documentation of SR&RL operations through the period of Maine Central Railroad ownership. When SR&RL profits declined in 1922, Wilfred and his wife Blanche, who had been the SR&RL book-keeper, moved to Dedham, Massachusetts, where Wilfred worked for the New York, New Haven and Hartford Railroad.

Locomotives

NumberBuilderTypeDateWorks numberNotes
1Hinkley Locomotive Works Forney locomotive10/18821563Scrapped 1913
2Hinkley Locomotive Works Forney locomotive10/18821564Sold to the Wiscasset, Waterville and Farmington Railway in 1907
3Portland Company Forney locomotive4/1892624Sold to the Kennebec Central Railroad in 1922
Bo-PeepHinkley Locomotive Works Forney locomotive18771261Temporarily leased from the Phillips and Rangeley Railroad in 1893 while fire-damaged B&SR engines 1 and 3 were repaired.
4H. K. Porter, Inc Forney locomotive8/19012360Retired 1927
5Portland Company Forney locomotive11/1906628Retired 1927
6Baldwin Locomotive Works Forney locomotive9/190731827Retired 1935
7Baldwin Locomotive Works Forney locomotive12/191340864Sold to Ellis D. Atwood for use at the Edaville Railroad in 1941.
Operable. It operated its first trips during Steam Fest on May 19, 2018, at the Maine Narrow Gauge Railroad Co. & Museum. Currently at the WW&F.
8Baldwin Locomotive Works Forney locomotive3/192457659Sold to Ellis D. Atwood for use at the Edaville Railroad in 1941.
Stored. awaiting cosmetic restoration at the Maine Narrow Gauge Railroad Co. & Museum. 8 is the largest Maine 2 footer locomotive in existence, heavier then even the 2-6-2's on the SR&RL railroad. Currently stored at the WW&F.
9Plymouth Locomotive Works 10 ton diesel 1930sbought from the Silver Lake Railroad in New Hampshire 2022, will be rebuilt with a new prime mover and regauged to 2ft gauge

Rolling stock

NumberBuilderTypeDateLengthCapacityNotes
10Laconia Car Companybaggage car188241feetno seatsrenumbered #31
11Jackson & Sharpebaggage-RPO190041feet6 passengersrenumbered #30 3-door Baggage/RPO later converted by Edaville to Baggage/Coach, and later again to Coach. Located at Boothbay Railway Village, Boothbay ME
15Laconia Car Companycoach188241feet28 passengers
16Laconia Car Companycoach188241feet28 passengers
17Laconia Car Companycoach190442feet28 passengersnamed "Elthea" on Edaville Railroad
18Jackson & Sharpecoach189439feet28 passengerspurchased from Wiscasset, Waterville and Farmington Railway in 1911. leased to WW&F Railway Museum, restored as Wiscasset and Quebec #3
25Portland Terminal CompanyRPO-smoking car191342feet30 passengersbadly damaged in a collision with locomotive #7 in the Bridgton yard about 1927. The larger smoking compartment was rebuilt to carry express with a single baggage door on only one side of the car; and the smaller RPO compartment was rebuilt with a few seats to carry passengers. The car was sold for use as a restaurant in 1935. The appearance of locomotive #7 was permanently changed by replacement of a smaller number plate on the front of the boiler.
101Laconia Car Companycaboose188226feet5 passengers
2-7Portland Terminal Companyflat cars191634feet15STthe largest flat cars on any gauge railway in Maine.
8-10Portland Terminal Companyflat cars191534feet15STthe largest flat cars on any gauge railway in Maine.
11-13Portland Terminal Companyflat cars191334feet15 tonsthe largest flat cars on any gauge railway in Maine.
14-21Portland Companyflat cars190330feet15 tonsFlat car #21 was fitted with a 3000USgal oil tank for the Standard Oil Company of New York in 1920.[8] The tank was later transferred to flat car #14 when #21 was scrapped.[9]
22Portland Companyflat cars189928feet10 tons[10] fitted with a 2500USgal oil tank for the Standard Oil Company in 1901.[11] Cars #22 and #21/14 were the only gauge tank cars in Maine.
23Portland Companyflat cars189928feet10 tonsparts used by Edaville to construct open car #202
24-27Portland Companyflat cars189928feet10 tons
28-33Portland Companyflat cars189128feet10 tons
34B&SRflat car188926feet10 tonsPreserved at WW&F
35-44Laconia Car Companyflat cars188226feet10 tonsFlat cars #35, 38, and 41-42 were rebuilt by B&SR to a length of 28feet when they required repairs. Flat car #40 was rebuilt as a flanger.
45-49Laconia Car Companybox cars188226feet10 tons
50-51B&SRbox cars188926feet10 tons
52-54Portland Companybox cars189528feet10 tonscar 54 converted by Edaville to excursion car, leased by SR&RL, Phillips, ME
55-58Portland Companybox cars189828feet10 tonsBox cars #56-58 had two small hinged doors on either side which could be opened as windows when transporting livestock.
59-62Portland Companybox cars190030feet15 tonsthe first 30feet freight cars built for any gauge railroad in Maine.
63-68Laconia Car Companybox cars190530feet15 tons
69-70B&SRbox cars190630feet15 tons
71-73Portland Terminal Companybox cars191334feet15 tonsthe largest box cars on any gauge railway in Maine.

References

External links

Notes and References

  1. Railroad Commissioners' Report State of Maine 1895 p. 35
  2. Railroad Commissioners' Report State of Maine 1906 p.56
  3. Railroad Commissioners' Report State of Maine 1907 p.59
  4. Railroad Commissioners' Report State of Maine 1909 p. 73
  5. Railroad Commissioners' Report State of Maine 1910 p. 83
  6. Railroad Commissioners' Report State of Maine 1913 p. 211
  7. United States Census 1880
  8. Jones, Robert C. Two Feet to the Lakes, The Bridgton & Saco River Railroad Pacific Fast Mail 1993 p.90 -- Jones incorrectly associates this tank with car number 22 (fitted with a tank 19 years earlier) and states capacity as 5000USgal (inconsistent with tank dimensions from scale drawings on Jones page 234 and Barney page 91)
  9. Jones, Robert C. Two Feet to the Lakes, The Bridgton & Saco River Railroad Pacific Fast Mail 1993 pp.223 & 235
  10. Jones, Robert C. Two Feet to the Lakes, The Bridgton & Saco River Railroad Pacific Fast Mail 1993 pp.222-223
  11. Jones, Robert C. Two Feet to the Lakes, The Bridgton & Saco River Railroad Pacific Fast Mail 1993 p.63 -- Jones incorrectly associates this tank with car number 14 (built 2 years after this tank was fitted) and states capacity as 3000USgal (inconsistent with tank dimensions from scale drawings on Jones page 235 and Barney page 91)