Brent Civic Centre Explained

Brent Civic Centre
Map Type:United Kingdom London Brent
Map Dot Label:Brent Civic Centre
Building Type:Municipal headquarters
Owner:Brent London Borough Council
Location:Engineers Way, Wembley Park
Location Town:London
Location Country:United Kingdom
Coordinates:51.559°N -0.2815°W
Opened Date:2013
Architect:Hopkins Architects
Main Contractor:Skanska

Brent Civic Centre is the headquarters of Brent London Borough Council, situated on Engineers Way in the Wembley Park area of the London Borough of Brent. It was opened in 2013, replacing the former headquarters at Brent Town Hall located a mile north on Forty Lane.

History

The building was commissioned to replace the aging Brent Town Hall. The site selected for the new building had previously been occupied by the former Palace of Industry which had been built for the British Empire Exhibition in 1924.[1]

The construction work started on site in November 2010.[2] The new building, which was designed by Hopkins Architects[3] and built by Skanska at a cost of £75 million,[4] was officially opened to the public on 6 October 2013.[5]

Key aspects of the internal design for the nine-storey glass structure included a large atrium and a feature looking like a circular drum. The atrium, which at high, was also intended to double as an events venue, featured a wide staircase which was fitted with seating in the central section so allowing it to function as a grandstand.[6] The circular drum, which was clad in timber, was partitioned inside to create a council chamber, community hall and library.[7] The design also allowed the building to act as a community hub, with two cafés, entertainment spaces, meeting rooms and a wedding garden.[8] When it opened, the civic centre was described by a journalist at the Guardian as "like ...the parliament of a small nation state".[9]

The scheme allowed some 2,000 council staff carrying out civic and administrative functions, who had previously been based at various locations around the borough, to be co-located in one place. The intention was to provide most of the Council's services in the new building, which is roughly in the centre of the borough, other than its archives department which was to remain at The Library at Willesden Green.[10] Brent Civic Centre was awarded a BREEAM 'Outstanding' rating. The design reduced carbon emissions by a third thanks to solar shading, natural ventilation and a combined cooling, heating and power using waste fish oil.[11]

In May 2015 the building had to be evacuated when an unexploded Luftwaffe bomb dating from the Second World War was uncovered by construction workers operating in Empire Way.[12]

Notes and References

  1. Web site: On The British Empire Exhibition, 1924-25. Anne . Clendinning. Branch Collective. 29 August 2020.
  2. Web site: Brent Civic Centre will open in 2013. Premier Construction News. 19 September 2012. 5 April 2020.
  3. Web site: Brent Civic Centre. Architects' Journal. 5 April 2020.
  4. Web site: Go-ahead for £75m Brent Civic Centre. 18 March 2010. Construction News. 15 November 2020.
  5. Web site: Brent's new civic centre opens. ITV. 6 October 2013. 15 November 2020.
  6. Web site: Brent Civic Centre Officially Opens. 6 October 2013. Hopkins Architects. 15 November 2020.
  7. Web site: Brent Civic Centre. Hopkins Architects. 29 August 2020.
  8. Web site: Brent Civic Centre. The Wedding Directory. 5 April 2020.
  9. News: Brent council's new £90m civic centre seen as machine for making money. Wainwright. Oliver. 2013-06-03. The Guardian. en-GB. 0261-3077. 29 August 2020.
  10. Web site: Celebration as Willesden Green Library marks its 125th anniversary. Nathalie. Raffray. Kilburn Times. 15 November 2020.
  11. Book: Brent Civic Centre guide for non-movers. London Borough of Brent. 2013.
  12. Web site: Kashmira Gander. Wembley bomb: Unexploded World War II device discovered by builders near national Stadium . The Independent . 21 May 2015 . 17 May 2020.