Brazilian submarine Tupi (S-30) explained

S Tupi (S-30) is the lead boat of the of the Brazilian Navy.[1] [2]

Construction and career

The boat was built at Howaldtswerke-Deutsche Werft in Germany and was launched on 28 April 1987 and commissioned on 6 May 1989.

Notes and References

  1. Book: Gardiner. Robert. Conway's All the World's Fighting Ships 1947–1995. Chumbley. Stephen. Budzbon. Przemysław. Naval Institute Press. 1995. 1-55750-132-7. Annapolis, Maryland.
  2. Web site: "S Tupi - S 30 Classe Tupi/IKL 209.". 2021-08-10. www.webcitation.org. 2015-03-10. https://archive.today/20150310212649/http://www.naviosbrasileiros.com.br/ngb/T/T070/T070.htm. dead.