Brampton Assembly Explained

Brampton Assembly should not be confused with Brampton Assembly (AMC).

Brampton Assembly Plant
Operated:1986–present
Location:Brampton, Ontario
Coordinates:43.752°N -79.718°W
Industry:Automotive
Products:Automobiles
Employees:3,045 (2022)
Area:269acres
Volume:2950000square feet[1]
Address:2000 Williams Parkway East
Owner:

Brampton Assembly Plant is a Stellantis Canada automobile factory located at 2000 Williams Parkway East Brampton, Ontario, Canada. Originally built by American Motors Corporation (AMC) for US$260 million, in the former Bramalea area of Brampton, the manufacturing plant was specially designed for building the Eagle Premier. Its role since has primarily been to assemble full-sized Chrysler products.

It was originally opened as the "Bramalea Assembly" under American Motors. At the time, AMC had another facility that was known as "Brampton Assembly" which was located at Kennedy Road/Steeles Avenue in Brampton. It had been built and operated from 1961 until 1992 under American Motors and later Chrysler, assembling American Motors and Jeep vehicles. As the previous facility was shut down and sold off for warehouse use in 1992, Chrysler called the new Bramalea Assembly the Brampton Assembly.

History

American Motors

In June 1984, American Motors (AMC) established an agreement with the governments of Ontario and Canada to build a new assembly plant.[2] Both the national and provincial governments loaned AMC each to build the facility.[2] The agreement also included a royalty to the government equal to 1% of the sales price of every vehicle produced at the facility.[2]

The infrastructure builder EllisDon Construction completed the US$260 million (US$ in dollars) plant and associated buildings.[3] The factory was opened by AMC in 1986 as "Bramalea Assembly", a state-of-the-art robotics-based assembly facility with 2950000square feet of floor space located on 269acres specifically designed to produce the Eagle Premier.

The production line speed was initially about 400 cars per shift (54 jobs per hour) with only one shift scheduled.[4] There were frequent layoffs at this new factory, while AMC's old Brampton plant, located at Kennedy Road, worked steadily to produce Jeep Wranglers.[4]

Chrysler - Stellantis

This facility was acquired (along with the rest of AMC) by Chrysler in August 1987. The factory was ranked top in Chrysler's 1988 quality audit of cars produced in each of the automaker's plants.[2]

Production of the Chrysler LH platform cars began in June 1992 and continued with the updated LH cars in 1997. Production switched to the rear-wheel drive Chrysler LX platform cars in January 2004. The retooling for the LX platform was described as "a low-budget effort", as Chrysler was experiencing some hardships at the time. Robots in the body shop were hand-me-downs from other plants. The paint shop was said to be the oldest FiatChrysler had in North America at that time.[5]

The attached "Brampton Satellite Stamping", which opened in 1991, was built for the launch of the Chrysler LH platform. At that time, Brampton Assembly operated with three shifts of production. It is the city of Brampton's largest employer, with over 4,200 people working there.

On 19 July 2007, Chrysler Group announced an investment of US$1.2 billion in the Brampton plant for upgrades to the Chrysler 300 series, Dodge Magnum, and Dodge Charger, as well as a $500 million manufacturing investment to prepare for European-market LX platform product loading.[6]

On 16 August 2007, the one-millionth LX rear-wheel-drive vehicle platform rolled-off Brampton Assembly's production line.[7]

On 1 November 2007, Chrysler announced that it was ending the third shift in Brampton, with the loss of 1,000 direct jobs, and declared that production of the Dodge Magnum in Brampton would end in early 2008.[8]

On 1 May 2009, both the Brampton Assembly and Windsor Assembly plants were shut down as a result of Chrysler's bankruptcy protection filing on 30 April 2009, in the United States, affecting about 2,700 employees at the Brampton Assembly and 4,400 at the Windsor Assembly. A Chrysler parts plant in Etobicoke, Toronto operated until 10 May 2009, when it was closed down for 30 to 60 days, affecting 300 employees, while the company through restructuring under court-ordered creditor protection.[9]

After the reorganization, Chrysler announced the launch of new models of the 300 and Charger to be produced in the Brampton assembly plant, beginning in 2010.[10]

The factory began production of the redesigned 2011 Chrysler 300 in January 2011. At this time, total employment was 2,871 (2,733 hourly; 138 salaried), working two shifts.

In 2012, employees at the Chrysler factories in Windsor and Brampton, Ontario ratified the CAW's labor agreement by an overwhelming majority, without any information from the automaker about plans for new products or investment at either plant.[11] As of December 2012, the Brampton Assembly Plant is the single largest employer in Canada's 11th largest city.[12]

On 19 August 2014, the first Challenger SRT Hellcat (VIN #700001) rolled off the assembly line. It sold at the Barrett-Jackson auction in Las Vegas auction for $825,000 to benefit Opportunity Village, a non-profit charity for those with intellectual disabilities in the Las Vegas area.[13] Rick Hendrick, owner of Hendrick Motorsports, bought the 707-hp "pony car" for his collection.[14]

The plant earned "bronze status" in 2015 for its work in implementing "World Class Manufacturing" (WCM), a "methodology that focuses on eliminating waste, increasing productivity, and improving quality and safety in a systematic and organized way."[15]

Fiat Chrysler Automobiles announced in May 2019 plans for investments in new and existing assembly plants in Michigan "after intense political pressure in the U.S. to increase domestic manufacturing."[16] This strategy could be an opportunity for Canadian parts suppliers, but also mean cuts in production at FCA's facilities in Ontario that include Brampton Assembly. Although there is still demand for the models produced by Brampton Assembly, "the market has gone really soft for cars, especially for sedans" and future FCA products may not use the platform currently made for the Chrysler 300, Dodge Charger, and Dodge Challenger.[17]

As of 2021, the facility may see a new generation of the LX platform or be converted to making batteries for the automaker given its proximity to other Stellantis facilities. Because the property is in a rapidly expanding suburb of Toronto, the increasing traffic congestion impeeds shipments while the outright sale of the land would make it excellent for housing development.[18]

In 2022, Stellantis announced a $2.8 billion (3.6 billion Canadian dollars) investment, thus preserving the futures of its Canadian operations in Windsor and Brampton assembly plants.[19] This includes Brampton Assembly Plant making a transition to new "flexible architecture" for the company's electrification plans.[19] Further changes were released that production of its new STLA Large platform cars will be in Windsor with Chrysler 300, Dodge Charger, and Dodge Challenger assembly ending at Brampton in 2024."[20] The Brampton plant will then undergo retooling and modernizing to be "flexible, multi-energy vehicle assembly facilities" to "produce the electric vehicles of the future."[20]

During August 2023, Stellantis held an event for select visitors to provide a final tour of the Brampton Assembly Plant. This open house by invitation commemorated the "birthplace of automotive legends for decades" starting from 1986 and Chrysler's purchase of the factory in 1987. The facility will transform in 2024 with the production of flexible electrified automobile designs scheduled in 2025.[21] Professional automotive journalists were able to order vehicles and see them being built.[22]

The ratification of the contract with Stellantis by the Canadian Auto Workers calls for Brampton Assembly to be retooled for the next-generation Jeep Compass that has been built in Toluca, Mexico. Stellantis is planning a US$970 million (1.32 billion Canadian-dollar) investment so that Brampton can build cars with internal combustion engines as well as battery-electric vehicles.[23] Plans are for the plant to start building the new Jeep Compass on a single shift in the fourth quarter of 2025.[24] The union agreement also includes the installation of air conditioning systems for the plant, a requirement that mandatory shift changes be announced by Wednesday of the week before the change, and also study the possibility of having day-care on-site.[25]

Future production

Former products

Annual production

Total production through 2023 = 7,147,888

External links

Notes and References

  1. Web site: Brampton Assembly Plant and Brampton Satellite Stamping Plant . Stellantis NA . 16 December 2023.
  2. Book: Rubenstein, James M. . The changing US auto industry: a geographical analysis . James M. Rubenstein . 264 . Taylor & Francis . 1992 . 978-0-415-05544-4 . 6 November 2014.
  3. Web site: Chrysler Corporation Assembly Plant AMC . https://web.archive.org/web/20080917055828/http://www.ellisdon.com/ed/projects/view/?id=3088665 . EllisDon Corporation . 17 September 2008 . 6 November 2014.
  4. Web site: The History of Bramptons Largest Union Local . Canadian Auto Workers Local 1285. 18 May 2008. 6 November 2014. dead. https://web.archive.org/web/20140415003713/http://www.cawlocal.ca/1285/history.asp. 15 April 2014.
  5. Web site: Boudette . Neal . 'Do or die' time as FCA's Brampton plant awaits investment . Autonmotive News . registration . 9 November 2021.
  6. News: Chrysler Group to invest $1.2 bln in Brampton assembly plant . Reuters . 19 July 2007 . 6 November 2014.
  7. Web site: Brampton sets production milestone . 16 August 2007 . Wheels Canada . 6 November 2014.
  8. News: Chrysler Brampton Assembly Plant Job Cuts . 1 November 2007 . The Brampton News . 6 November 2014 . https://web.archive.org/web/20141107011202/http://www.thebramptonnews.com/articles/2770/1/Chrysler-Brampton-Assembly-Plant-Job-Cuts/Page1.html . 7 November 2014 . dead .
  9. News: Chrysler Canada assembly plants shut down . CBC News . 1 May 2009 . 6 November 2014.
  10. Web site: New Chrysler Business Plan Promising News for Canadian Workers, CAW President says . Canadian Auto Workers . 4 November 2009 . 6 November 2014.
  11. Web site: CAW Workers Ratify Chrysler Agreement As The Countdown To 2016 Begins . Derek . Kreindler . 1 October 2012 . The Truth About Cars . 6 November 2014.
  12. Web site: Units . Canadian Auto Workers Local 1285 . 14 December 2012 . 6 November 2014 . dead . https://web.archive.org/web/20120916034610/http://www.cawlocal.ca/1285/units.asp . 16 September 2012 .
  13. Web site: Vijayenthiran . Viknesh . First production 2015 Dodge Challenger SRT Hellcat . Motor Authority . 29 September 2014 . 22 January 2020.
  14. Web site: Lingeman . Jake . First Challenger SRT Hellcat Sells for $825,000 . Autoweek . 29 September 2014 . 22 January 2020.
  15. Web site: The FCA Brampton Assembly plant awarded bronze status . Canadian Metalworking . 22 January 2020 . 21 December 2015.
  16. News: Bickis . Ian . FCA invests big in Michigan as analysts question future of Brampton plant . The Star . Toronto . The Canadian Press . 28 February 2019 . 22 January 2020.
  17. Web site: Flavelle . Dana . FCA's U.S. expansion stokes fears for Brampton . Automotive News Canada . 15 May 2019 . 22 January 2020.
  18. Web site: Irwin . John . Stellantis Brampton now at a crossroads . Automotive News Canada . 22 August 2021 . 9 November 2021.
  19. News: Associated Press . Stellantis' $2.8 billion investment secures future for Brampton, Windsor plants . Greater Milwaukee Today . 3 May 2022 . 4 August 2022.
  20. Web site: Stellantis details production changes at its Brampton and Windsor assembly plants . 3 June 2022 . CBC/Radio-Canada . 4 August 2022.
  21. Web site: Miller . Robert S. . Last Glimpse: Brampton Assembly Plant Open House . MoparInsiders . 10 August 2023 . 16 December 2023.
  22. Web site: Wallcraft . Stephanie . Closing a chapter on Dodge muscle—and a long family history — at Brampton Assembly . d/driving.ca . 8 September 2023 . 16 December 2023.
  23. News: Noble . Breana . Unifor: Brampton gets Jeep Compass, Windsor first in line for Dodge muscle cars . The Detroit News . 4 November 2023 . 16 December 2023.
  24. Web site: Stellantis plans 3-shift operations at Ontario plants, but not soon . Automotive News Canada . 11 April 2024 . But the plant will not start output of the new Jeep Compass on a single shift until the fourth quarter of 2025, leading to layoffs for some staff in excess of two years..
  25. Web site: Ensing . Chris . Dodge muscle cars to be built in Windsor and Jeep Compass coming to Brampton, Unifor-Stellantis deal says . CBC News . 3 November 2023 . 16 December 2023.
  26. Web site: Boshouwers . Derek . Stellantis to idle Ontario plants in July and August . auto123.com . 9 July 2021 . 4 August 2022.