The Bow (skyscraper) explained

The Bow
Location:500 Centre Street SE, Calgary, Alberta, Canada
Coordinates:51.0478°N -114.0622°W
Status:Completed
Start Date:June 13, 2007
Completion Date:2012
Topped Out Date:November 2010
Building Type:Office
Roof:236m (774feet)
Floor Count:58 floors
53 office floors
2 retail floors
4 mechanical floors
3 sky gardens
Cost:$1.4 billion CAD
Floor Area:2150425square feet[1]
Architect:Foster + Partners, Zeidler Partnership Architects
Structural Engineer:Halcrow Yolles
Main Contractor:Ledcor Group of Companies
Developer:Matthews Southwest
Owner:Oak Street Real Estate Capital[2]

The Bow is a 158000m2 skyscraper in downtown Calgary, Alberta, Canada. The 236 metre (774 ft) building was the tallest in Calgary between July 8, 2010, when it surpassed the Suncor Energy Centre, and May 11, 2016, when it was exceeded by Brookfield Place. The Bow is currently the second tallest office tower in Calgary and the third tallest in Canada outside Toronto.[3] The Bow is also considered the start of redevelopment in Calgary's Downtown East Village.[4] It was completed in 2012 and was ranked among the top 10 architectural projects in the world of that year according to Azure magazine.[5] It was built for oil and gas company Encana, and was the headquarters of its successors Ovintiv and Cenovus.

History

Early plans

EnCana Corporation (now Ovintiv), North America's second largest natural gas producer, announced plans for the high-rise in 2006. Early designs suggested that the project would consist of a complex of towers (perhaps two or more) over two blocks. The initial proposal was for a tower of, which would have made it the second tallest building in Canada.[6] Early sources suggested a two tower complex spanning the entire surface of two blocks, with a second tower of 40 to 50 stories connected at sixth stories level over 6 Avenue.[7] Official statements declared that the tower will be 58 stories, or tall.

The management company in charge of the project was Texas-based Matthews Southwest, with architectural services furnished by UK-based Foster + Partners and Zeidler Partnership Architects of Calgary.[8]

Announcement of The Bow

The project filed for development permit application is called The Bow, for its crescent shape and the view of the Bow River.[8] On October 12, 2006, Foster + Partners revealed the first designs for the new tower.[9] The final tower stands 11 meters short of the original plan after concerns were raised regarding the shadow cast upon Bow River pathways.

Encana sold The Bow office project assets to H&R Real Estate Investment Trust in 2007 for $70 million,[10] while signing a 25-year tenant lease agreement that was to start after the project's completion. Encana expected to occupy the entire tower.[11]

In late June 2007, the company announced that the Portrait Gallery of Canada would not be moving from Ottawa into the Bow.[12]

Construction

Groundbreaking took place on June 13, 2007, with work starting on both sides of 6 Avenue South between Centre Street and 1st Street East.[13] Sixth Avenue was excavated, after closure of the block (August 21, 2007)[14] and the six level underground parkade was constructed on a two block area, on both north and south side of 6th Avenue.

A neighbouring historic building – The York Hotel, built 1929–1930 in the Edwardian Commercial Architectural style – was demolished to make room for the new building. Because of the historical significance of the York Hotel, it was important to save as much as reasonable to incorporate into the new structure. Between 70 and 80 percent of the bricks were saved and used to reconstruct two of the hotel’s exterior walls. The brown brick originally supplied by Clayburn Brick in Abbotsford and the cast-in-concrete friezes have been removed, numbered and graphed to show the original location the brick and friezes were installed on the new building in their original locations. The remainder of the building was demolished ahead of schedule by Calgary-based demolition and environmental contractor Hazco.

The concrete foundation was continuously poured over 36 hours on May 11 and 12, 2008, being the largest of its kind in Canada, and third largest in the world after the Howard Hughes Center in Los Angeles and the Sama Tower (Al Durrah Tower) in Dubai.[15] Some 14000m2 of concrete filled the 3000m2 foundation.

Erection of the above-ground steel superstructure began in October 2008 with the installation of the first of two Favelle Favco heavy-lift tower cranes.

Construction was briefly halted in December 2008 due to a $400 million shortage of financing needed to finish the job.[16] The project continued to move forward, despite the unresolved financing issues.[17] In April 2009, a secondary tower in the project, the 200000square feet building planned for a block south of the main tower, was put on hold for at least two years. The main tower, however, was set to continue, having secured the remaining $475 million required for completion of the structure.[18]

On July 8, 2010, the Bow surpassed Suncor Energy Centre as Calgary's highest building.[19] The 215m (705feet) tall Suncor Energy Centre was the highest building in Calgary since 1984. The addition of a steel girder, part of floors 55 to 57, raised the Bow tower to 218m (715feet). In November 2010 the Bow would be topped off at 234 metres.[20]

Opening and use

The Bow officially opened in June 2013 and became the headquarters of Encana Corporation and Cenovus Energy,[21] which had been spun-off from Encana in 2009.[22] Cenovus was announced as anchor tenant in the proposed Brookfield Place in August 2013,[23] and completed the move to Brookfield Place in 2019.[24] Also in 2019, Encana announced it would be renamed to Ovintiv and would move its corporate headquarters to Denver, Colorado.[25]

Public art

Encana officially confirmed on June 16, 2008, that Jaume Plensa, an artist most famous for the Crown Fountain in Chicago, had been chosen to complete two major public art installations for the project.[26] The first work, entitled Wonderland, was unveiled in January 2013, on the south plaza.[27] [28] The second work, entitled Alberta's Dream is located on the north side and depicts a bronze casting of the artist embracing a living tree.[29]

There is not a public observation deck. Floors 54 and 55 are home to the private meeting, lounges, conference center and sky high clubs.

Building details

[31]

See also

External links

Notes and References

  1. Web site: The Bow. Skyscraper Center. . 2017-09-10.
  2. Web site: BREAKING: Calgary's Bow tower sold for $1.2 billion. Western Investor. 2021-09-08. live. https://web.archive.org/web/20110516092814/http://www.the-bow.com/TheBOWwebsitefactsheet.pdf. 2011-05-16.
  3. News: The Bow rises as Calgary's tallest building. July 8, 2013 . 2015-09-12 . CBC News.
  4. News: Calgary's future skyline unveiled. Calgary Herald. October 13, 2006. 2015-09-12. dead. https://web.archive.org/web/20150923221731/http://www.canada.com/calgaryherald/news/story.html?id=2f52e71a-9cf2-44f8-89ac-fdf43669c26a. September 23, 2015.
  5. 2012 in Review: Top 10 Projects. Osborne. Catherine. 2012-12-20 . Azure. 2015-09-12 . mdy-all.
  6. Book: The Vertical City: A Sustainable Development Model. 9781784662578. Al-Kodmany. Kheir . 2018-06-25 . mdy-all . 367 . WIT Press.
  7. Project could loom over Calgary skyline. Businessedge. Beatty. Bob. November 23, 2005. 2015-09-12 . mdy-all.
  8. Encana Unveils the Bow - Calgary's Newest Tower . dexigner . October 12, 2006.
  9. Web site: Projects: The Bow, Calgary 2005-2013. Foster + Partners. 2015-09-12.
  10. News: H&R REIT buying property for EnCana's new Calgary HQ . . February 9, 2007.
  11. News: Turner . Chris . It takes a tower . ROB Magazine . The Globe and Mail . 2007-05-25 . https://web.archive.org/web/20201025233126/https://www.theglobeandmail.com/report-on-business/rob-magazine/it-takes-a-tower/article17996040/ . 2020-10-25 . 2020-10-26.
  12. News: National gallery not coming to Calgary building: EnCana . . 29 June 2007.
  13. News: EnCana Tower Construction Underway. Calgary Herald. 13 June 2007. 2015-09-12. dead. https://web.archive.org/web/20121110154803/http://www.canada.com/calgaryherald/news/local/story.html?id=dc9b3fc6-f5af-431b-a0d6-3df5233f410e&k=81457. 10 November 2012.
  14. News: Dreaded downtown closure begins. Calgary Herald. 21 August 2007. 2015-09-12. dead. https://web.archive.org/web/20160304031737/http://www.canada.com/calgaryherald/news/story.html?id=33398f90-46d8-47bd-acd8-91b99ff3bd83&k=45541. 4 March 2016.
  15. News: Concrete pour smashes record. Calgary Herald. 11 May 2008. 2008-05-13. dead. https://web.archive.org/web/20090830024435/http://www.canada.com/calgaryherald/news/city/story.html?id=e8037831-d126-4742-891d-c21be53c9219. 30 August 2009.
  16. News: A sticky ending for the tar sands. . 15 January 2009 . 2015-09-11.
  17. News: A Boom in Office Towers in Calgary . Linda . Baker . . January 2009 . 2015-09-11 . mdy-all.
  18. News: Plans for Calgary's Bow tower to go ahead. Vanderklippe. Nathan. The Globe and Mail. 1 April 2009. 2015-09-12. Toronto.
  19. News: The Bow rises as Calgary's tallest building. 2015-09-12. CBC News. August 8, 2010 . Calgary.
  20. News: The Top of Calgary . . November 27, 2010 . C5.
  21. News: The Bow tower officially opens in Calgary . CBC News . 2013-06-04 . 2020-10-26.
  22. News: EnCana wraps up spinoff of its oil business . Reuters . 2009-11-30 . 2020-10-26.
  23. Web site: Stuart . Cody . Brookfield Place Announces Anchor Tenant . Calgary Real Estate News . CREB . 2013-08-06 . 2020-10-26.
  24. Web site: Cenovus Energy Inc. . 2019 Annual Information Form . SEC . 2020-02-11 . 2020-10-25.
  25. News: Dawson . Tyler . As Encana becomes Ovintiv, the rebrand begs a question: What the hell is an Ovintiv? . National Post . 2019-10-31 . 2020-10-26.
  26. News: Calgary's Wonderland sculpture joins global collection of Jaume Plensa heads. January 29, 2013. Calgary Sun.
  27. News: Unique sculpture turning heads downtown . . February 1, 2013.
  28. Web site: Bow Building head statue installation complete. CBC News. January 27, 2013. 2015-09-12.
  29. News: Alberta's Dream bronze sculpture of a man hugging a live tree by Barcelona artist Juame Plensa outside The Bow tower. Jarvie. Michele. Calgary Herald. May 2, 2013. 2015-09-12.
  30. Web site: The Bow, Calgary. https://web.archive.org/web/20070929143632/http://www.emporis.com/en/wm/bu/?id=streetbow-calgary-canada . dead . September 29, 2007 . Emporis. 2015-09-12.
  31. Web site: Specifications. The Bow Building. 2015-09-12.