Boston University Central station explained

Boston University Central
Style:MBTA
Style2:Green
Address:Commonwealth Avenue at St. Marys Street
Coordinates:42.3499°N -71.1068°W
Other: MBTA bus:
Platform:2 side platforms
Tracks:2
Passengers:2,194 (weekday average boardings)
Pass Year:2011
Opened:[1]
Rebuilt:March 18, 2002–November 18, 2003
Accessible:Yes
Former:St. Mary's Street
Other Services Header:Former services
Other Services Collapsible:yes
Mapframe:yes
Mapframe-Marker:rail-light
Mapframe-Zoom:14

Boston University Central station is a surface-level light rail station on the MBTA Green Line B branch, located the center median of Commonwealth Avenue west of St. Marys Street in Boston, Massachusetts, surrounded by the Boston University campus. It consists of two side platforms, which serve the B branch's two tracks. The station is accessible, with raised platforms to allow level boarding onto low-floor trams and a high platform on the inbound side to serve high-floor light rail vehicles.

History

The station has the third-highest ridership on the B branch (after only Harvard Avenue and). In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility. Portable lifts were installed at Boston University Central around 2000 as a temporary measure.[2] [3] Construction at Boston University Central and Boston University East was part of a $32 million modification of thirteen B, C, and E branch stations.[4] During construction, an interim station with temporary platforms between the two stops was used.[5] Construction began on March 18, 2002, a week behind schedule due to delays in finishing up similar work at Harvard Avenue and Washington Street. The project was then expected to be completed within six months.

However, poor weather and limited work periods (as most work could only be done during the four hours at night that no trains used the line) delayed the completion date first to December 2002, then March 2003.[6] The contractor informed the MBTA in early 2003 that they would be unable to complete the work; a new contractor was chosen in mid-2003, but work did not resume until September.[7] The stations were completed and reopened on November 18, 2003.[8]

Around 2006, the MBTA added a wooden mini-high platform on the inbound side, allowing level boarding on older Type 7 LRVs. These platforms were installed at eight Green Line stations in 2006–07 as part of the settlement of Joanne Daniels-Finegold, et al. v. MBTA.[9] [10]

Nearby stops were proposed on the Urban Ring – a circumferential bus rapid transit (BRT) line designed to connect the existing radial MBTA rail lines to reduce overcrowding in the downtown stations.[11] Under draft plans released in 2008, the Urban Ring would have run over the Grand Junction Railroad Bridge, on a dedicated busway under the Boston University Bridge, and along University Road and Mountfort Street. A southbound BRT stop would have been located on University Road, with the northbound stop on Mountfort Street near Carlton Street.[12] The project was cancelled in 2010.[13]

External links

Notes and References

  1. Web site: History of subways, tunnels and elevated lines . Massachusetts Bay Transportation Authority . Engineering and Maintenance Department . 1981 . 17 December 2016.
  2. Web site: https://web.archive.org/web/20120220063458/http://www.bostonmpo.org/bostonmpo/pmt-old/PMT-1.pdf . February 20, 2012 . Executive Summary . Program of Mass Transportation . January 2004 . Boston Regional Metropolitan Planning Organization . 29.
  3. Web site: https://web.archive.org/web/20010701041753/http://www.mbta.com/text-only/schedmaps/map/map.pdf . July 1, 2001 . Subway Map . 2001 . Massachusetts Bay Transportation Authority.
  4. Web site: https://web.archive.org/web/20011030194756/http://www.mbta.com/text-only/newsinfo/pressview.cfm#564 . The MBTA Continues Accessibility Program At Coolidge Corner Station . October 30, 2001 . Rivera, Lydia . July 12, 2001 . Massachusetts Bay Transportation Authority . MBTA Press Releases.
  5. News: BU East, Central T Stop Construction Begins Monday . Daily Free Press . March 15, 2002 . December 13, 2016.
  6. News: T construction continues . Daily Free Press . February 7, 2003 . December 18, 2016.
  7. News: T stops set for Nov. finish . Daily Free Press . September 22, 2016 . December 18, 2016.
  8. https://web.archive.org/web/20031205091335/http://www.mbta.com/insidethet/press_releases_details.asp?ID=945 . December 5, 2003 . MBTA Accessibility Program Update On Green Line . November 7, 2003 . Massachusetts Bay Transportation Authority.
  9. Web site: Settlement Agreement . Joanne Daniels-Finegold et al. v. MBTA . April 10, 2006 . 10–11.
  10. Web site: Green Line Stations Upgraded to Improve Accessibility . https://web.archive.org/web/20110116153104/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0607.pdf . June 2007 . TRANSReport . Boston Regional Metropolitan Planning Organization . January 16, 2011.
  11. Web site: https://web.archive.org/web/20110708181035/https://www.commentmgr.com/projects/1169/docs/URnews0105c.pdf . July 8, 2011 . Urban Ring Phase 2 Fact Sheet . January 2009.
  12. Web site: https://web.archive.org/web/20170514232004/http://www.massdot.state.ma.us/theurbanring/downloads/Plan_Profile_Drawings.pdf . May 14, 2017 . The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement . Massachusetts Executive Office of Transportation . November 2008.
  13. Web site: Re: Urban Ring Phase 2, EOEEA #12565 . January 22, 2010 . Mullan . Jeffery B. . Massachusetts Executive Office of Energy and Environmental Affairs.