Bombardier CR4000 explained

Bombardier CR4000
Interiorimage:Bombardier CR4000 interior.jpg
Interiorcaption:The interior of a refurbished CR4000
Service:10 May 2000 – present
Manufacturer:Bombardier Transportation
Factory:Vienna, Austria
Family:Flexity Swift
Yearconstruction:1998–2000
Refurbishment:2008–2009, 2015
Numberbuilt:24
Numberservice:23
Fleetnumbers:2530–2553
Capacity:70 seated, 138 standing per tram
Operator:Tramlink
Depots:Therapia Lane
Carbody:Aluminium
Trainlength:30.1m (98.8feet)
Width:2.65m (08.69feet)
Height:3.67m (12.04feet)
Floorheight:350–
Platformheight:3501NaN1
Entrylevelorstep:3501NaN1
Doors:8 plug doors per set
Art-Sections:1
Wheeldiameter:630– (new–worn)
Wheelbase:
  • 1800mm (motorised)
  • 1900mm (trailer)
Maxspeed:500NaN0
Weight: per tram
Acceleration:1.2m/s2
Deceleration:
  • 1.3m/s2 (service)
  • 2.73m/s2 (emergency)
Traction:Kiepe Electric DPU 251[1] GTOVVVF
Traction Motors:4 × Alstom 4 LXA 1442 1200NaN0 asynchronous 3-phase AC
Poweroutput:4800NaN0
Transmission:7.225 : 1 gear ratio
Electricsystem: overhead catenary
Collectionmethod:Pantograph
Uicclass:Bo′+2′+Bo′

The Bombardier CR4000 is a 76% low floor model of the Bombardier Flexity Swift series of tram operated by Tramlink in London. They are based on and very similar in appearance to the K4000 used on the low-platform routes of the Cologne Stadtbahn network. Built between 1998 and 2000, the trams entered service in the spring of 2000.[2]

History

24 trams were ordered from Bombardier Transportation and built at its factory in Vienna, Austria between 1998 and 2000. The first tram, 2530, was delivered to Therapia Lane depot on 13 September 1998, with testing beginning soon afterwards. Although service was due to begin in November 1999, delays in the construction of the line meant that the first tram entered passenger service on 10 May 2000.[3] [4]

The trams are numbered 2530 through to 2553, following on from the highest numbered tram in the original London Transport numbering system, 2529, which was scrapped in 1952. All entered service in a red and white livery except for 2550, which was painted in FirstGroup livery.[5]

Overview

The trams are six-axle single-articulated double-ended cars, with four doors on each side. The low floor section stretches between both the outer doors through the articulation (which rests on an unpowered bogie). Between the outer door and each car end is a higher-floor section, accessed up a step and situated over the car's two power bogies. The low-floor section is 40cm (20inches) above rail-level, sloping down to 35cm (14inches) in the doorways, a height that matches the platforms at tram stops, and each car has two wheelchair positions.

The trams are 30.1m (98.8feet) long and 2.65m (08.69feet) wide, with 70 seats and a total capacity of just over 200 passengers. They operate from an overhead power supply at, and have a maximum speed of 80km/h.

Each tram has an integral traction braking controller with deadman's handle. While stationary, the tram is immobilized until the driver's hand is on the controller: if the driver's hand is removed from the controller while moving, an alarm sounds immediately and the driver's hand must return to the controller to disarm it. If a three-second countdown passes and it is not disarmed, the track brakes are applied.

Upgrades and refurbishment

The trams have undergone a series of upgrades since their introduction. In 2006, the bus-like destination blinds were replaced with LED destination blinds, and the on-board announcements were also updated, featuring the voice of BBC News presenter and tram-enthusiast Nicholas Owen.[6] [7]

All 24 trams were refurbished between 2008 and 2009, which involved a deep clean of the interior, installation of new seat moquette and a new lime green, blue and white external livery.[8]

The trams underwent a second refurbishment from 2015–2016. This included a full interior repaint, including the repainting of all handrails, new flooring, new seat moquette, new safety signage and the removal of the stop request buttons. Externally, new LED headlights were fitted. 2553 was the first unit to be completed, having been out of service since 2014 following a serious road traffic accident. Following repairs and refurbishment, it re-entered service in May 2015.[9] [10]

Naming

2535 was officially named Stephen Parascandolo 1980 - 2007 in a special ceremony at Beckenham Junction on 20 October 2007, in honour of Stephen Parascandolo, a well known local tram enthusiast and webmaster of the "Unofficial Croydon Tramlink website" who died at the age of 26 in a car accident in Hitchin. The ceremony was attended by his parents, fellow enthusiasts and officials from Tramlink.[11]

Accidents and incidents

See main article: 2016 Croydon tram derailment. On 9 November 2016, unit 2551 derailed and overturned on a sharp bend approaching Sandilands Junction, before Sandilands tram stop. There were seven fatalities, with 58 other people injured, sixteen of them sustaining serious injuries. Although the speed limit approaching the junction was 20km/h, the tram had been travelling at an estimated speed of .[12]

The Rail Accident Investigation Branch (RAIB) are investigating the type of glass installed in the CR4000 vehicles. During the derailment, the right hand side of the tram was heavily damaged, breaking or dislodging several bodyside and door windows, and causing multiple people to be ejected or partially ejected from the tram. Of the seven fatalities, six were ejected through the windows. The Office of Rail Regulation (ORR) declined to comment on whether the derailed tram was fitted with laminated safety glass, claiming that it was unable to do so because of the RAIB's investigation. Bombardier did not respond to requests for information on the type of glass that could have been the cause of fatalities in this derailment.[13]

Following the accident vehicle 2551 was significantly damaged and was permanently withdrawn from the fleet.[14]

External links

Notes and References

  1. Web site: Electrical Equipment for Low-Floor Light Rail Vehicle CR4000 for Croydon Tramlink . . 29 March 2023 . de, en . PDF.
  2. Web site: FLEXITY Swift – London-Croydon, United Kingdom . 2022-11-29 . Bombardier . https://web.archive.org/web/20180113150255/https://www.bombardier.com/en/transportation/projects/project.flexity-uk.html . 2018-01-13 . dead.
  3. Web site: Delivery . 12 January 2019.
  4. Web site: Croydon Tramlink - the Unofficial Site.
  5. Croydon Tramlink opened for business The Railway Magazine issue 1191 July 2000 page 10
  6. Web site: Croydon Tramlink - the Unofficial Site.
  7. Web site: Tramlink celebrates its seventh birthday. 17 May 2007 .
  8. News: End of an era as Croydon's last red tram turns green. 3 April 2009. Croydon Advertiser. Neil. Millard. 27 April 2010. https://web.archive.org/web/20101007080528/http://www.thisiscroydontoday.co.uk/news/Exclusive-End-era-Croydon-s-red-tram-turns-green/article-869210-detail/article.html. 7 October 2010. dead. dmy-all.
  9. Web site: Bombardier Trams - GLP . www.greaterlondonphotos.co.uk . dead . https://web.archive.org/web/20170927181448/http://www.greaterlondonphotos.co.uk/bombardier-trams.html . 2017-09-27.
  10. Web site: In Pictures: London Tramlink 2553 returns to service | British Trams Online News.
  11. Web site: 2535 Stephen Parascandolo naming ceremony : Pictures : Croydon Tramlink : TheTrams.co.uk.
  12. Web site: Fatal accident involving the derailment of a tram at Sandilands Junction, Croydon, 9 November 2016. 20 February 2017. Rail Accident Investigation Branch. 10 April 2017.
  13. News: Did type of glass in crashed tram's windows contribute to deaths?. 2016-11-24. Croydon Advertiser. 2016-12-15.
  14. Web site: Tramlink. Current Fleet Availability - a Freedom of Information request to Transport for London . WhatDoTheyKnow . 8 March 2024 . en . 3 February 2024.