Boisar high-speed railway station explained

Boisar high-speed railway station
Type: Mumbai-Ahmedabad High-Speed Railway station
Style:Indian Railways
Address:Warangade, Boisar, Maharashtra, India
Coordinates:19.7904°N 72.793°W
Elevation:22m (72feet)
Line:Mumbai–Ahmedabad high-speed rail corridor
Structure:Elevated
Platform:2
Tracks:2
Parking:Yes
Opened:[1]
Electrified:Yes
Owned:National High Speed Rail Corporation Limited
Operator:National High Speed Rail Corporation Limited
Status:Under construction[2]
Map Type:India Maharashtra#India
Map Size:300
Mapframe:yes
Mapframe-Caption:Interactive map

Boisar high-speed railway station is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located in Warangade, Boisar, Maharashtra, India. It is the fourth station of the Mumbai–Ahmedabad high-speed rail corridor, after Virar station and before Vapi station.[3] [4]

Construction

The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C3" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in November 2022, with a deadline of around 4.5 years.[5] In June 2023, Larsen and Toubro won the tender.[6] The NSHRCL signed a letter of agreement (LoA) with Larsen and Toubro for the design and construction of Thane depot, Thane, Virar and Boisar stations in July 2023.[7] The land acquisition of around 70 hectares for the station in Warangade and for the high-speed railway viaduct in the region began in 2021, and was completed in March 2024, marking the completion of the land to be acquired for the entire Mumbai–Ahmedabad high-speed rail corridor. Hence, construction on the station began from the same month, and is expected to be completed by the first half of 2028, the time also slated for the completion of the Maharashtra section of the corridor.[8] [9] [2]

Lines

The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the fourth station of the Mumbai–Ahmedabad high-speed rail corridor in Boisar.[10]

Structure

The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The exterior design of the station building will be inspired by the Arabian Sea because of its close location to it and the fishing nets used by local fishermen. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.[11]

Features

The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[11]

Connectivity

Road

An approach road to the station will be built to connect it with Boisar and the under-construction Delhi–Mumbai Expressway through Boisar Road.

Rail

The nearest railway station after the station's completion will be Boisar railway station, located west from the station.

Metro

A possible extension of Line 13 (Purple Line) of Mumbai Metro is being considered by the Mumbai Metropolitan Region Development Authority (MMRDA) to link Boisar with Mumbai, as part of the proposed expansion plan of Mumbai Metropolitan Region. If implemented, then Lines 13, 9, and 7 of Mumbai Metro will directly connect the station with Chhatrapati Shivaji Maharaj International Airport.[12] [9]

Air

The nearest airport after the station's completion will be Chhatrapati Shivaji Maharaj International Airport in Mumbai, located around south from the station.

Land acquisition issues

When the National High Speed Rail Corporation Limited (NHSRCL) began acquiring land in the Boisar region, the Warli tribals living in the region began protests against NHSRCL and blocked surveyors from creating land surveys and soil testing required to start the construction, fearing that the project's implementation would lead to loss of their lands and residences. Such actions from people as well as from state government departments in Vasai-Virar, who challenged the development plan of the Mumbai Metropolitan Region that includes the high-speed railway project to pass through the region, had delayed land acquisition altogether in the entire Maharashtra section of the Mumbai-Ahmedabad high-speed rail corridor, that continued until 2022. Officials from the main funding agency of the Mumbai-Ahmedabad high-speed rail corridor project, the Japan International Cooperation Agency (JICA), met the tribals for negotiations, and hence, solved the problem.[9] [13]

See also

Notes and References

  1. News: Sen. Anindita. Bullet Train Project in India! 32-metre deep BKC station to be ready in 2028, work starts in Mumbai. The Financial Express. 13 September 2023. 4 October 2023. en.
  2. News: Land Acquisition Completed for Mumbai-Ahmedabad Bullet Train. Construction World. 11 March 2024. 27 March 2024. en.
  3. Web site: Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders & Updates. The Metro Rail Guy. 5 October 2023. en.
  4. News: Tiwari. Neeraj. Bullet train: 3 growth centres planned along corridor. The Indian Express. 5 December 2018. 6 October 2023. en.
  5. Web site: Information on MAHSR C-3 Package. National High Speed Rail Corporation Limited. 15 November 2022. 6 October 2023.
  6. News: L&T wins ₹15,697 cr civil contract package C3 of Mumbai-Ahmedabad Bullet Train project. Metro Rail Today. 16 June 2023. 6 October 2023. en.
  7. News: L&T Awarded Mumbai – Ahmedabad Bullet Train’s C3 Contract in Maharashtra. The Metro Rail Guy. 20 July 2023. 6 October 2023. en.
  8. News: Lewis. Clara. With bullet train, MMRDA feels new BKC can be built in Boisar. The Times of India. 28 October 2018. 6 October 2023. en.
  9. News: Nair. Sandhya. Vasai-Virar civic body opposes govt on bullet train plan. The Times of India. 15 February 2019. 5 October 2023. en.
  10. Web site: Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6. Japan International Cooperation Agency (JICA). 6 October 2023. en.
  11. News: Aklekar B.. Rajendra. Maharashtra: Designs of four bullet train stations unveiled . Mid-Day. Mumbai. 10 February 2023. 5 October 2023. en.
  12. Web site: Mumbai Metro Line 13 (Mumbai Metro Purple Line): Stations, Route, And Status. Times Property. 12 September 2023. 6 October 2023. en.
  13. News: Pant. Manish. EXCLUSIVE: Maharashtra land acquisition for country’s first bullet train nears completion as project returns on fast track. Business Today. 7 December 2022. 6 October 2023. en.