Blue line (Taichung Metro) explained

Blue Line (Taichung Metro)
Native Name:臺中捷運藍線
Native Name Lang:zh-tw
Color:0072C6
Type:Rapid transit
Locale:Taichung, Taiwan
Stations:20 planned
Character:Underground, Elevated
Tracks:2

The Blue line is a proposed rapid transit line in Taichung and will be operated by Taichung Metro. [1]

Route description

The Blue line will begin at the Port of Taichung and follows Taiwan Boulevard for its entire length until it reaches Taichung railway station. Then, it will cross the railway tracks and terminate in East District. The tracks will be elevated from the Port of Taichung until the border of Longjing District and Xitun District, where the tracks then proceed underground. The depot will be located in Longjing District near the Longjing Interchange of National Freeway 3.[1]

History

The planning of network of rapid transit in Taichung was initially started in 1990s. A prototype of rapid transit line running on Taiwan Boulevard (then known as Zhonggang Road) was first proposed in 1998, along with the current Green line and a third Red line, but never progressed past the planning stage.[2]

During his mayoralty, Lin Chia-lung continued to advocate for a rapid transit line along the route.[3] In October 2018, the Executive Yuan approved the feasibility study submitted by the Taichung City Government.[2] In 2019, the line embarked on its overall planning phase with an estimated cost of $128.56 billion NTD.[4] [5]

A proposal for the Blue line was approved by the Ministry of Transportation and Communications in late January 2024. Construction of the Blue line was expected to take ten years, and cont NT$161.51 billion, of which of which NT$67.56 billion was to be funded by the Executive Yuan. The planned Blue line is to start at the Port of Taichung, travel eastward through Shalu and Xitun, before terminating in central Taichung.[6]

Notes and References

  1. News: 蘇木春 . 中市府完成捷運藍線綜合規劃 將報交通部審議 . 2 February 2021 . . 1 February 2021 . zh-tw.
  2. Web site: 台中第2條捷運28年終於成真 中市府接獲行政院捷運藍線核定公文 . Public Transportation & Rapid Transit System Office of Taichung City . September 16, 2020 . zh-tw . October 5, 2018.
  3. News: 盧金足 . 林佳龍:捷運藍線非做不可 . September 16, 2020 . . 14 July 2015 . zh-tw.
  4. News: 陳秋雲 . 台中捷運藍線 連3場公聽會廣徵民意 . September 16, 2020 . . July 22, 2020 . zh-tw.
  5. News: 張菁雅 . 台中捷運藍線2020動工?中市府這麼說... . September 16, 2020 . . November 29, 2019 . zh-tw.
  6. News: Wang . Shu-fen . Mazzetta . Matthew . MOTC approves Taichung Metro's proposed Blue Line . 22 May 2024 . Central News Agency . 29 January 2024.