Blue Line (Calgary) Explained

Blue Line
Type:Light rail
System:CTrain
Status:Operational
Locale:Calgary, Alberta, Canada
Start: (West)
End: (Northeast)
Linelength Km:23
Stations:25
Website:Calgary Transit
Owner:Calgary Transit
Operator:Calgary Transit
Character:At-grade, elevated, underground
Routenumber:202
Tracks:2
Electrification:[1]
Map Name:Route diagram
Map State:collapsed

The Blue Line, also known as Route 202, is a light rail transit (LRT) line in Calgary, Alberta, Canada. Partnered with the Red Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, with the first trains running on what is now the Blue Line in 1985.

History

Origin

The concept of a light rail transit system (LRT) was approved in 1976 by the City of Calgary, with the first 12.9km (08miles) section running from Anderson Road in the southwest, northbound, and into downtown, opening in 1981. Originally planned for 40,000 passengers per day, this initial section quickly achieved its designed ridership and is now part of the Red Line. Based on the success of the Anderson-downtown section, the city approved a second route which would head northwest towards the University of Calgary and the Southern Alberta Institute of Technology. Opposition to the routing through the neighborhood of Sunnyside resulted in a switch of priority to the northeast, in what would become the Blue Line. The median of some main roads had already been allocated to serve as the right of way for what would become the CTrain's Blue Line, and the first 9.8km (06.1miles) section opened in 1985, before the originally proposed northwestern expansion. Both lines share a right-of-way through the downtown core. [2]

Northeast expansion

The Blue Line's first expansion was to McKnight–Westwinds station in 2007.[3] with Martindale station and Saddletowne (the current terminus) opening in 2012.[4]

Western expansion

In February 2008 the Western expansion of the CTrain began, extending the line from downtown towards 69 Street SW, and adding an additional six stations. The Western expansion opened at the end of 2012, ahead of the planned 2013 opening.[5]

Capacity upgrade

Up until the completion of the Red Line's Fish Creek–Lacombe station, all platforms for the CTrain were originally designed to service three-car trains, although there had been enough space allotted to allow four-car trains. Beginning in 2007 construction on station platforms began to expand the entire network to allow four-car trains, with the project being completed in 2017 for CA$300 million.[6] In 2017, Calgary Transit began running four-car trains on the Blue Line. The increase from three-car trains realized an additional capacity of 200 passengers per trip.[7]

Stations and route

See main article: List of CTrain stations. Starting at 69 Street station, the Blue line runs along 17 Avenue SW, crossing Sarcee Trail, passes briefly underground towards Westbrook Mall, and then follows along Bow Trail. The line then continues to Downtown Calgary where it shares a right of way with the Red Line along 7 Avenue S. The two lines diverge after City Hall station, where it turns north to cross the Bow River, and runs along the median of Memorial Drive, crossing Deerfoot Trail (Highway 2), to 36 Street NE, where it turns northbound, continuing within the median of 36 Street NE, crossing 16 Avenue NE (Highway 1 / Trans-Canada Highway), and McKnight Boulevard. After McKnight Boulevard, 36 Street NE turns to Métis Trail, and the Blue Line passes under a bridge in the northbound lane running parallel to the road until Martindale station, at which point it turns northeast to its terminus at Saddletowne station.

Key
Terminus
Westbound only
Eastbound only
StationOpened
(rebuilt)
TransfersNotes
69 St2012 -  -
Sirocco2012 -  -
45 St2012 -  -
Westbrook2012 MAX Teal -
Shaganappi Point2012 -  -
Sunalta2012 -  -
Downtown West–Kerby2012 -  -
8 St Southwest1981 (2009) Red LineFare-free zone
7 St Southwest1981 (2009)Fare-free zone
6 St Southwest1981 (2009)Fare-free zone
4 St Southwest1981 (2011)Fare-free zone
3 St Southwest1981 (2010)Fare-free zone
1 St Southwest1981 (2005)Fare-free zone
Centre St1981 (2000)Fare-free zone
City Hall1981 (2011)
300 Airport
MAX Yellow
MAX Purple
Fare-free zone
Bridgeland/Memorial1985 (2014) -  -
Zoo1985 (2014) -  -
Barlow/Max Bell1985 (2014) -  -
Franklin1985 (2013) -  -
Marlborough1985 (2013) -  -
Rundle1985 (2013) MAX Orange -
Whitehorn1985 (2011) -  -
McKnight–Westwinds2007None -
Martindale2012 -  -
Saddletowne2012100 Airport -

[8] [9]

Future expansion

Northeast leg

The city of Calgary published a study in 2012 describing a 7.5km (04.7miles) extension for the northeast leg of the Blue Line beyond the existing terminus at Saddletowne station, to run north along the west side of 60 Street NE, continuing west along the north side of 128 Avenue NE, then running north along the west side of 32 Street NE. One at-grade crossing would be created at 60 St and 88 Ave; the route would be grade-separated at the crossings of Airport Trail (above grade), Country Hills Blvd (below grade), 128 Ave (below), and Metis Trail (above). The study included four stations:[10]

The four stations were studied with side-loading platforms, but the proposed terminal station at Stoney Trail would have sufficient space for a centre-loading platform. 230m (760feet) of tail tracks for LRV storage would be built north of the Stoney Trail station.[10] By 2017, the proposed northeast leg extension had been truncated to three stations (ending at 128 Ave) and 5km (03miles). However, the project is not included in the City's mobility plan and has yet to be funded.[11]

The same 2012 study included concepts to provide transit connections from Calgary International Airport to either Saddletowne or the proposed 88 Ave station using light rail, tram, or bus services. The potential airport connector rail line along Airport Trail could be extended further west to connect with the proposed Green Line north-central leg, specifically at the future 96th Ave N station. [12]

West leg

An extension west from the current terminus at 69 Street to a future station at Aspen Woods has been planned but not funded. The Aspen Woods station would be at approximately the intersection of 17 Avenue and 85 Street SW.[13]

See also

Notes and References

  1. Web site: SD160 Light Rail Vehicle: Calgary, Canada . Siemens Transportation Systems, Inc . Catenary supply voltage: 600 Vdc . 2007 . January 23, 2011 . dead . https://web.archive.org/web/20101026082202/http://www.mobility.siemens.com/shared/data/pdf/sts_usa_internet/calgary_sd160.pdf . October 26, 2010 . mdy-all .
  2. Hubbel. John. Colquhoun. Dave. Light Rail Transit in Calgary The First 25 Years. 12 April 2006. 12 March 2018.
  3. http://www.calgarytransit.com/pdf/mcknight_westwinds_riders_guide.pdf McKnight-Westwinds Rider's Guide
  4. News: Saddletowne, Martindale LRT Openings Confusing For Some In Calgary. 12 March 2018. HuffPost Canada. 27 August 2012. en-CA.
  5. News: West leg of LRT on track for December opening. CTV Calgary. 7 November 2012. en-CA.
  6. News: Markusoff. Jason. Four-car LRT project's price tag hits $300M. 12 March 2018. Calgary Herald. 8 May 2014. en-ca.
  7. News: Gilligan. Melissa. Calgary Transit launches 4-car CTrain service on Blue Line LRT. 12 March 2018. Global News. 1 May 2017. en.
  8. Web site: 2019_ctrainmap. live. https://web.archive.org/web/20190214153154/http://www.calgarytransit.com:80/sites/default/files/content/PDF/2019_ctrainmap.pdf . 2019-02-14 . 2020-07-19. Calgary Transit.
  9. Web site: 2019 Mini Metro Network-SWTSR. live. https://web.archive.org/web/20200327152106/http://www.calgarytransit.com:80/sites/default/files/content/PDF/2019_rapid_transit_network_map.pdf . 2020-03-27 . 2020-07-19. Calgary Transit.
  10. Functional Study for a future Light Rail Transit alignment from Saddletowne Circle at 60th Street NE to Stoney Trail North via 128th Avenue NE . Calgary Transit . September 2012 . HDR, Inc. . HDR, Inc. . 6 September 2017 . https://web.archive.org/web/20170906113144/http://www.calgarytransit.com/sites/default/files/reports/northeast_lrt_functional_plan_-_saddletowne_to_stoney.pdf . dead.
  11. Web site: Blue Line (Northeast) LRT Extension Preliminary Design Study . City of Calgary . 19 May 2017 . en-CAN . 27 April 2017 . https://web.archive.org/web/20170519130411/http://www.calgary.ca/Transportation/TI/Pages/Transit-projects/Blue-line-lrt-extension-preliminary-design-study.aspx?redirect=%2Fnelrtextension . dead . 11 June 2019 .
  12. NE LRT Functional Study: Airport Transit Link Service Options Overview . Calgary Transit . September 2012 . HDR, Inc. . HDR, Inc. . 6 September 2017 . https://web.archive.org/web/20170906113144/http://www.calgarytransit.com/sites/default/files/reports/northeast_lrt_functional_plan_-_saddletowne_to_stoney.pdf#page=47 . dead.
  13. News: Canada's light rail renaissance . Smith, Kevin . October 29, 2012 . International Railway Journal . 21 May 2019.