Blowering Dam Explained

Blowering Dam
Location Map:Australia New South Wales
Location Map Size:280
Location Map Caption:Location of the Blowering Dam
in New South Wales
Country:Australia
Location:Snowy Mountains, New South Wales
Status:O
Construction Began:1964
Opening:1968
Owner:State Water Corporation
Dam Type:E
Dam Crosses:Tumut River
Spillway Count:1
Spillway Type:Concrete chute
Res Name:Blowering Reservoir
Plant Operator:Snowy Hydro
Plant Commission:1969
Plant Turbines:1
Website:Blowering Dam

The Blowering Dam is a major ungated rock fill with clay core embankment dam with concrete chute spillway impounding a reservoir under the same name. It is located on the Tumut River upstream of Tumut in the Snowy Mountains region of New South Wales, Australia. Purposes for the dam include flood mitigation, hydro-power, irrigation, water supply and conservation. The dam is part of the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

Location and features

Commenced in 1964, completed in 1968, and upgraded in 2010, the Blowering Dam is a major ungated dam, located approximately south of Tumut. The dam was built by consortium including Morrison, Knudsen, Utah and Mcdonald on behalf of the New South Wales Department of Land and Water Conservation for town water supplies, river flows and domestic requirements, irrigated agriculture, industry, flood mitigation and environmental flows.[1] [2] [3] Together with releases from Burrinjuck Dam, on the Murrumbidgee River, Blowering Dam also provides a regulated flow of water for the Coleambally and Murrumbidgee Irrigation Areas.

The dam wall constructed with of rock fill with clay core is high and long. The maximum water depth is and at 100% capacity the dam wall holds back of water at AHD. The surface area of the Blowering Reservoir is and the catchment area is . The uncontrolled concrete chute spillway is capable of discharging .

A 33 million upgrade of facilities was completed between 2009 and 2012, and involved the construction of a parapet wall on top of the dam wall crest and raising the spillway training walls. The addition of the parapet wall increased the crest height to . Storage capacity and water releases from the dam were not altered by the upgrade.[4] [5]

Power generation

The dam houses a hydroelectric power station and has one turbine generator, with a generating capacity of of electricity; with a net generation of per annum. The power station has rated hydraulic head.

Recreation

In 1978, Ken Warby set the water speed record of on Blowering Reservoir[6] - a record that still stands.

See also

External links

Notes and References

  1. Web site: Blowering Dam. https://web.archive.org/web/20090913035809/http://statewater.com.au/_Documents/Dam%20brochures/Blowering%20Dam.pdf. dead. 13 September 2009. PDF brochure. State Water Corporation. 2009. 22 April 2013.
  2. Web site: Register of Large Dams in Australia. Excel (requires download). The Australian National Committee on Large Dams Incorporated. 2010. 22 April 2013. Dams information. 12 December 2013. https://web.archive.org/web/20131212120804/http://www.ancold.org.au/wp-content/uploads/2012/10/Dams-Australia-2010-v1-for-website.xls. dead.
  3. Web site: Blowering Dam . Water delivery: dams . State Water Corporation . 22 April 2013 . dead . https://web.archive.org/web/20130410023533/http://www.statewater.com.au/Water%20delivery/Dams/Blowering%20Dam . 10 April 2013 . dmy .
  4. Web site: Blowering upgrade. https://web.archive.org/web/20090913025400/http://www.statewater.com.au/current+projects/Dam+safety+upgrades/Blowering+upgrade. dead. 13 September 2009. Projects: dam safety upgrades. State Water Corporation. 2012. 22 April 2013.
  5. News: $33m flood-prevention works set for Blowering Dam. The Daily Advertiser. 24 April 2009. 24 April 2009.
  6. News: Warby announces bid on own world speed record. 11 August 2010. Sydney Morning Herald. 8 October 2008.