Opened:December 1839
Rebuilt:
  • 1848, 1893, 1896, 1900
  • 2014–2018 (current station)
Other Services Header:Former services
Other Services Collapsible:yes
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail
Marker-Color:
  1. 000
Zoom:14

Berlin station is a train station located in the Kensington neighborhood of Berlin, Connecticut. It is on the New Haven–Springfield Line and is served by Amtrak's,, and Valley Flyer, in addition to the Hartford Line commuter rail. Two high-level platforms, each six cars long connected by an overhead pedestrian bridge opened at the Hartford Line service launch on June 16, 2018. On December 21, 2016, the historic 1900-built station building was destroyed by a fire.

History

Early stations and branches

The Hartford and New Haven Railroad (H&NH) opened from New Haven to Meriden in December 1838, and to Hartford in December 1839.[1] The first ticket office was located about south of the modern location, possibly in a general store.[2] [3] It was replaced by a wooden station at the modern site in 1848, after the original first depot was vacated and sold to Daniel C. Spencer sometime between 1840 and 1855, which he used a steam wheel shop until March 1, 1871. Spencer sold the property the "steam wheel shop" was on to William Daniels who stated in the deed that "said shop is to be removed from the premises at the convenience of the grantor".[4]

Middletown residents, unhappy at the H&NH skipping their town, constructed the Middletown Railroad to Berlin in 1849; it was taken over by the H&NH in 1850. It connected with the mainline at a wye, with the station inside the wye. The New Britain and Middletown Railroad as built from Berlin to New Britain in 1865; the H&NH operated it from the beginning and purchased it in 1868. In 1870, all three lines connecting at Berlin became part of the New York, New Haven and Hartford Railroad.

Brick stations

The New Haven replaced the 1848 station with a standard yellow brick design, similar to those extant at South Norwalk and Torrington, opening around August 24, 1893 on the east side of the mainline tracks. The two branch lines were extended on a diamond crossing across the mainline around this time. The 1893-built station burned in 1896 and was replaced by a nearly identical building in red brick, which in turn burned on June 27, 1900. The walls and foundation of the later station were largely intact and used to build a new station, which opened in December 1900.[5]

On May 27, 1897, third rail electric service began from Hartford and Berlin to New Britain. Electrification was extended to Bristol in 1898, but withdrawn on July 7, 1906 when the City of New Britain obtained a court order against the electrification, which had caused a number of deaths. However, trolley service powered by overhead wires successfully operated over the Middletown branch from 1906 to the 1920s.

In the 1920s, a southbound station building (possibly a freight house) was constructed on the west side of the tracks. Passenger service ended on the Middletown branch around 1932, and on the branch to New Britain around 1935. The southbound building burned in the 1970s. Amtrak took over intercity service on the mainline on May 1, 1971.

With passenger service at low levels for the last part of the century, the station fell into disrepair. The roof and gutters built into the walls leaked, causing freeze-thaw damage to the brick structure. Many of the original electrical, plumbing, and heating systems were also in ill repair. Despite this, the station was among the best-preserved 19th-century stations in the state, with much of its original interior still intact. The town received $2.12 million in state and federal grants in 2005 to fund restoration. Engineering assessment of the station began in 2008, with final design completed in 2012.

New station

Construction on the new station started in 2014. The historic station building, including the ticket office, closed on March 4, 2016 for renovations. On April 25, 2016, a temporary platform was opened south of the station building so that the northbound high-level platform could be constructed on the site of the former low-level platform.[6]

On December 21, 2016, the 1900-built station building was destroyed by an early-morning fire. The under-construction platforms and bridge were not significantly harmed, but Amtrak briefly stopped service to the station before resuming with a speed restriction.[7] On December 29, state investigators ruled that the station remains were too damaged to repair. Instead, historically significant items like radiators and stone lintels were salvaged and the station remains demolished.[8] The demolition was delayed due to insurance concerns in January 2017.[9]

The rebuilt Berlin station partially opened on June 16, 2018, the same day the Hartford Line commuter rail commenced service, following and in late 2017.[10] [11] Amenities at the new station include two high-level platforms connected by a pedestrian bridge, automatic snow melt systems, and train information displays. The stops at Berlin and stations were discontinued on June 9, 2018 due to the addition of Hartford Line service.[12] A ribbon-cutting ceremony was held for the completed station on October 23, 2018.[13]

External links

Notes and References

  1. Book: Karr, Ronald Dale . The Rail Lines of Southern New England . Branch Line Press . 1995 . 0942147022 . 74–78.
  2. Web site: Stations: B-BO . Belletzkie . Bob . Tyler City Station . December 21, 2016.
  3. Book: Roy, John H. Jr. . A Field Guide to Southern New England Railroad Depots and Freight Houses . Branch Line Press . 2007 . 9780942147087 . 33–34.
  4. Berlin, Index to Land Records, Grantor, A to Z, 1785 - 1850, Pg. 626, (line 20), Vol.21,Pgs. 14 - 15 MTG. Also, Vol.21, Pgs. 14 - 15
  5. Web site: Berlin, CT (BER) . Great American Stations . Amtrak.
  6. Web site: Information Center: Archived Construction Updates . April 22, 2016 . New Haven–Hartford–Springfield Rail Program . Connecticut Department of Transportation.
  7. News: Large Fire Destroys Old Amtrak Station In Berlin . Dempsey . Christine . December 21, 2016 . Hartford Courant . December 21, 2016 . Byron . Ken.
  8. News: State Rules 116-Year-Old Berlin Train Station Will Have To Be Demolished . Leukhardt . Bill . December 30, 2016 . Hartford Courant . December 30, 2016.
  9. News: Insurance concerns delay demolition of Berlin train station . Backus . Lisa . January 10, 2017 . New Britain Herald . January 11, 2017 .
  10. Web site: New Hartford Line Stations Open in Meriden and Berlin . New Haven - Hartford - Springfield Rail Program . August 8, 2018 . 3 . Summer 2018.
  11. Web site: Thousands Take A Free Ride On Hartford Line's Inaugural Run . Porter . Mikaela . Owens . David . June 17, 2018 . June 17, 2018.
  12. Web site: Vermonter Timetable . Amtrak . June 9, 2018 . June 18, 2018.
  13. Gov. Malloy Announces Completion of New Train Station in Berlin Serving the Hartford Line . The Office of Governor Dannel P. Malloy . October 23, 2018 . October 23, 2018.