----Beijing–Shenyang Section | |
Native Name: | Chinese: 京沈客运专线<br>京哈高速铁路北京至沈阳段 |
Native Name Lang: | zh-hans |
Type: | High-speed rail |
System: | China Railway High-speed |
Status: | Operational |
Locale: | |
Stations: | 20 |
Owner: | China Railway |
Operator: | |
Depot: | Shenyang, Harbin |
Stock: | CRH380BG series CR400BF series |
Tracklength: | 5 m |
Electrification: | (Overhead line) |
Map State: | collapsed |
Beijing–Shenyang high-speed railway is a 700km (400miles)-long high-speed rail line of the China Railway High-speed between Beijing and Shenyang, the capital of Liaoning province. It is a section of the Beijing–Harbin high-speed railway.
The line was intended to relieve a significant bottleneck in China's transportation network between the Northeast region and Beijing. The route runs to the north and inland of the existing routes which hug the coast around the Bohai sea. The new line leaves Beijing heading northeast to Chengde in Hebei province then turns east through Chaoyang, and Fuxin in Liaoning province, on route to Shenyang. There are 16 stations, which were the last section of the Beijing–Harbin high-speed railway to be completed; the other sections of that line had been operational since December 1, 2012.
The line has a maximum design speed of 350km/h[1] though regular services operate at around 250km/h300km/h. Travel time between Shenyang and Beijing was cut from 4 hours to just 2 hours and 17 minutes.[2]
Construction was supposed to have started in 2010 with the project to be completed by 2012, but was delayed until March 2014.[3] [4]
Protests by residents along the planned route caused several safety reviews to examine the potential noise pollution and electro-magnetic radiation.[5] [6] The first two reviews suggested installing noise shielding along sensitive parts of the line. The third review called for noise shielding, in addition to above ground tunnels, to completely enclose the line while near urban areas. In addition, the starting point has been relocated to Beijing Chaoyang railway station (formerly known as Xinghuo railway station) in Chaoyang District of Beijing.
In August 2013, the Beijing municipal government published a notice calling for bids to build the line until its status is completed and operational. The total investment was expected to be 124.5 billion yuan.[7] [8]
The Shenyang to Chengde South section opened on December 29, 2018. The remaining section between Chengde South and Beijing Chaoyang opened on January 22, 2021.[9]
On June 25, 2021, G902/903, G907/908 and G915/916 trains were extended to the Beijing railway station, thus the Beijing-Shenyang high-speed railway has charted trains arriving and departing at the Beijing railway station.[10]
Station | Chinese | Distance (km) | Prefecture-level city | Province/ Municipality | Metro transfers | |||
---|---|---|---|---|---|---|---|---|
Chinese: 北京 | align=right | N/A | ||||||
Chinese: 北京朝阳 | align=right | (Under construction) | ||||||
Chinese: 顺义西 | align=right | |||||||
Chinese: 怀柔南 | align=right | |||||||
Chinese: 密云 | align=right | |||||||
Chinese: 兴隆县西 | align=right | |||||||
Chinese: 安匠 | align=right | |||||||
Chinese: 承德南 | align=right | |||||||
Chengdexian North | Chinese: 承德县北 | align=right | ||||||
Chinese: 平泉北 | align=right | |||||||
Chinese: 牛河梁 | align=right | |||||||
Chinese: 喀左 | align=right | |||||||
Nailingao | Chinese: 奈林皋 | align=right | ||||||
Chinese: 辽宁朝阳 | align=right | |||||||
Chinese: 北票 | align=right | |||||||
Wulanmutu | Chinese: 乌兰木图 | align=right | ||||||
Chinese: 阜新 | align=right | |||||||
Heishan North | Chinese: 黑山北 | align=right | ||||||
Xinmin North | Chinese: 新民北 | align=right | ||||||
Shenyang West | Chinese: 沈阳西 | align=right | ||||||
Chinese: 沈阳 | align=right |