Beijing–Xiong'an–Shangqiu high-speed railway 京雄商高铁 | |
Status: | Under Construction |
Linelength: | 552.80NaN0 (Xiong'an-Shangqiu section) 6390NaN0 (full line) |
Speed: | 3500NaN0 |
Map State: | collapsed |
Beijing–Xiong'an–Shangqiu high-speed railway (京雄商高铁)[1] is a high-speed railway under construction in China. The section from Xiong'an to Shangqiu is also called Xiong'an–Shangqiu high-speed railway (雄商高铁).[2]
The to section had been expected to start construction in January 2021. Construction officially started on 30 September 2022.[3]
The to section is part of long-term planning. In short-term it will through service with the Beijing-Xiong'an intercity railway to .
The route will form part of Beijing–Hong Kong (Taipei) corridor. The section between Beijing and Xiong'an will be the second to link the two cities, taking a more direct route than the existing Beijing–Xiong'an intercity railway.
--! colspan="2" | Route--> | Station №--> | Station Name | Chinese | Distance -->< | --! China Railway transfers/connections--> | Metro transfers/connections | Location--> | ||
---|---|---|---|---|---|---|---|---|---|---|
北京丰台 | ||||||||||
[4] (reserved) | 大兴西 | |||||||||
双辛 | ||||||||||
Through service via Beijing–Xiong'an intercity railway to/from | ||||||||||
雄安 | ||||||||||
任丘西 | ||||||||||
肃宁东 | ||||||||||
深州东 | ||||||||||
衡水南 | ||||||||||
枣强南 | ||||||||||
清河西 | ||||||||||
临清东 | ||||||||||
聊城西 | ||||||||||
阳谷东 | ||||||||||
台前东 | ||||||||||
梁山 | ||||||||||
郓城 | ||||||||||
菏泽东 | ||||||||||
曹县西 | ||||||||||
商丘 |