Bedford Avenue station explained

Bedford Avenue
Address:Bedford Avenue & North Seventh Street
Brooklyn, NY
Borough:Brooklyn
Locale:Williamsburg
Coordinates:40.7177°N -73.9576°W
Division:BMT
Line:BMT Canarsie Line
Service:Canarsie
Platforms:1 island platform
Tracks:2
Structure:Underground
Accessible:yes

The Bedford Avenue station is a station on the BMT Canarsie Line of the New York City Subway. Located at the intersection of Bedford Avenue and North Seventh Street in Williamsburg, Brooklyn, it is served by the L train at all times. With an annual total of 9,388,289 passengers for 2015, Bedford Avenue is the busiest subway station in Brooklyn outside of Downtown Brooklyn, as well as the busiest station in Brooklyn served by one subway service.

History

Bedford Avenue opened on June 30, 1924, as part of the initial segment of the underground Canarsie Line that originally stretched from Sixth Avenue station in Manhattan to Montrose Avenue station,[1] built by the Brooklyn–Manhattan Transit Corporation (BMT) under the Dual Contracts.[1] [2] [3]

As part of the wide scope in the rebuilding of the Canarsie Tubes that were damaged during Hurricane Sandy, the Metropolitan Transportation Authority started renovating the station in 2017.[4] At the Bedford Avenue end of the station, two new street-level stairways were built, platform stair capacity was increased, the mezzanine was expanded, turnstiles were added, and new elevators were installed and opened on August 6, 2020.[5] [6] At the Driggs Avenue end, two new street-level stairways were added, the mezzanine area was redesigned with additional turnstiles installed, and a new platform stairway was built.[7] [8] Substantial completion was projected for November 2020,[9] and MTA officials formally dedicated the new elevators and entrances that October.[10] [11]

New York City councilmember Lincoln Restler founded a volunteer group, the Friends of MTA Station Group, in early 2023 to advocate for improvements to the Bedford Avenue station and four other subway stations in Brooklyn.[12] [13] In 2023, a short barrier was installed at the center of the platforms to reduce the probability of passengers being pushed into the tracks.[14]

Station layout

GStreet levelExit/entrance
MMezzanineFare control, station agent
P
Platform level
Westbound← toward
Island platform
Eastbound toward

At platform level, Bedford Avenue utilizes a simple island platform setup with two tracks.[15] The track normally used by southbound trains to Canarsie is labeled Q1, and the track normally used by northbound trains to Manhattan is labeled Q2. The Q- prefix denotes that the track is on the Canarsie Line, but this is only used by MTA officials and not by the general public.

The Bedford Avenue station's walls have a brown-and-green mosaic pattern with geometric shapes and embellished "B" ornamentation.[15]

There are two mezzanines above the platform: one at Bedford Avenue on the west and one at Driggs Avenue on the east. Two stairs and an elevator rise from the west end of the platform to the Bedford Avenue mezzanine, while a stair from the east end of the platform rises to the Driggs Avenue mezzanine.

Exits

There are two sets of entrance and exit points. The western set comprises four street stairs: two stairs each to the southeastern and northeastern corners of Bedford Avenue and North 7th Street. It also comprises a 24-hour booth and an elevator to the northeastern corner of the intersection. The eastern exits are two stairs each to the southeastern and northeastern corners of North 7th Street and Driggs Avenue.[16]

Some of these staircases are original to the station, while others were built as part of the 2019 expansion. The entrances built as part of the expansion are similar to those at Enhanced Station Initiative stations in other parts of the subway system, with next-train countdown clocks and neighborhood wayfinding maps at the exterior of the entrance.[17] The new entrances contain a mural by Marcel Dzama entitled No Less Than Everything Comes Together, which depicts a sun and moon rising over fanciful figures.[18]

Ridership

Bedford Avenue has experienced a surge in ridership along with the recent gentrification of Williamsburg. In the 1970s, the station had a fairly low annual ridership of 1.2 million, amounting to an average of 3,000 entries during weekdays.[19] In 2000, there were 3.783 million boardings recorded at the station,[20] but after the neighborhood was re-zoned in 2005, the MTA noted even higher ridership. By 2007, ridership had increased over 50%, to 5.776 million annual passengers.[21] In 2008, Bedford Avenue was used by more than 6 million people, making it the 53rd most-used subway station in New York City and one of the busiest in Brooklyn.[22] In

,

riders used this station.

Between 1998 and 2011, passenger numbers on the L increased three times as much as ridership on the subway system as a whole. As a result, by 2011, many Manhattan-bound L trains were running at their full capacity of 1,160 riders per train by the time they reached the Bedford Avenue station.[23] In 2010, Bedford Avenue surpassed seven million entries for the first time in its history, receiving press for its particularly high weekend passenger volume.[24] Crowding has become such an issue that politicians have called upon the MTA to "create a schedule that is more reflective of ridership patterns."[25]

External links

Notes and References

  1. News: 1924-07-01. Celebrate Opening of Subway Link; Civic and City Officials Ride in First Train Over 14th St. Line to Brooklyn.. en-US. The New York Times. 2023-03-11. 0362-4331.
  2. nycsubway.org — The Dual System of Rapid Transit (1912)
  3. News: Subway Tunnel Through. August 8, 1919. The New York Times. February 28, 2010.
  4. Web site: Project Description, Budget and Scope. March 31, 2018. Metropolitan Transportation Authority. 2018-06-05.
  5. Governor Cuomo Announces Completion of Nation-leading L Project Tunnel Rehabilitation With No Shutdown. April 26, 2020. New York State - Governor Andrew M. Cuomo. Albany, NY. April 27, 2020. https://web.archive.org/web/20200427110938/https://www.governor.ny.gov/news/governor-cuomo-announces-completion-nation-leading-l-project-tunnel-rehabilitation-no-shutdown. April 27, 2020. live.
  6. Musluoglu. Subutay. November 2020. Canarsie Line Rehabilitation Update - Substantial Completion of Work at Bedford Avenue L Station. The Bulletin. Electric Railroaders' Association. 63. 11.
  7. Web site: mta.info Superstorm Sandy: One Year Later. web.mta.info. June 5, 2016.
  8. Web site: MTA Press Conference - 08/06/2020. YouTube.
  9. Web site: Capital Program Oversight Committee Meeting November 2018. November 13, 2018. November 10, 2018. 90. Metropolitan Transportation Authority.
  10. Web site: Verde . Ben . MTA christens new elevators at Bedford Avenue L station . Brooklyn Paper . October 20, 2020 . March 11, 2023.
  11. Web site: Elevators Debut at Bedford Avenue L Subway Station . Greenpointers . October 22, 2020 . March 11, 2023.
  12. Web site: Brendlen . Kirstyn . February 24, 2023 . Restler launches new 'Friends of MTA Station' initiative to care for 5 local subway stops . May 6, 2023 . Brooklyn Paper.
  13. Web site: Nessen . Stephen . March 5, 2023 . Want to be 'friends' with a subway station? A Brooklyn councilmember seeks volunteers. . May 6, 2023 . Gothamist.
  14. Web site: Mocker . Greg . MTA testing new safety measures on subway platforms . PIX11 . October 27, 2023 . January 21, 2024.
  15. http://nycsubway.org/perl/stations?203:650 BMT Canarsie Line: Bedford Avenue
  16. Web site: 2015. MTA Neighborhood Maps: Williamsburg & Bedford Stuyvesant. July 20, 2016. mta.info. Metropolitan Transportation Authority.
  17. Web site: June 13, 2018. Enhanced Stations Initiative: Community Board 6. November 19, 2018. cbsix.org. Metropolitan Transportation Authority. 11. November 20, 2018. https://web.archive.org/web/20181120221100/http://cbsix.org/wp-content/uploads/2018/06/esi-package-4-cb6-061318-FINAL-10-am.pdf. dead.
  18. Web site: Schulz . Dana . MTA unveils colorful new subway mosaics at Bedford and 1st Avenue L train stations . 6sqft . 2021-09-24 . 2022-03-22.
  19. Web site: May 7, 2009. Spark It Up. dead. https://web.archive.org/web/20111018030742/http://transit.frumin.net/subway/spark.php. October 18, 2011. July 27, 2016. frumin.net. Frumination.
  20. http://transit.frumin.net/subway/growth/nyc-station-ridership.xls.zip 1904-2006 ridership figures
  21. Web site: 2007 ridership by subway station. dead. https://web.archive.org/web/20090529101142/http://www.mta.info/nyct/facts/ridership/ridership_sub_07.htm. May 29, 2009. May 7, 2009. Metropolitan Transportation Authority.
  22. Web site: 2008 subway ridership. live. https://web.archive.org/web/20090512192919/http://www.mta.info/nyct/facts/ridership/ridership_sub.htm. May 12, 2009. May 7, 2009. Metropolitan Transportation Authority.
  23. Web site: Grynbaum . Michael M. . Soon, L Will Mean Less Crowded, Subway Officials Say . City Room . June 8, 2012 . March 11, 2023.
  24. News: Grynbaum. Michael M.. July 10, 2011. With weekends not sleepy anymore, subway faces a test. The New York Times. live. August 22, 2011. https://web.archive.org/web/20110716103912/http://www.nytimes.com/2011/07/11/nyregion/with-weekends-not-sleepy-anymore-subway-faces-a-test.html?pagewanted=all. July 16, 2011.
  25. Web site: Squadron: "Review weekend ridership on the L, F.". August 22, 2011. Second Ave. Sagas. Kabak. Benjamin. 14 July 2011.