Blyth Bebside railway station explained

Blyth Bebside
Status:Disused
Borough:Bebside, Northumberland
Country:England
Coordinates:55.1275°N -1.5585°W
Owned:National Rail (on reopening)
Manager:Northern Trains (on reopening)
Map Type:United Kingdom Northumberland
Grid Name:Grid reference
Platforms:2
Tracks:2
Original:Blyth and Tyne Railway
Pregroup:North Eastern Railway
Years:3 August 1850
Events:Opened as Bebside
Years1:2 November 1964
Events1:Closed
Years2:2024
Events2:Proposed reopening as Blyth Bebside

Blyth Bebside is a railway station on the Northumberland Line, which is due to reopen in the summer of 2024,[1] and will run between Newcastle and Ashington. The station will serve the town of Blyth and village of Bebside in Northumberland, England.

History

The station was opened on 3 August 1850 by the Blyth and Tyne Railway. The station was situated on the south side of Front Street on the A19. The goods shed was north of the level crossing and east of the running lines; this was closed on 9 December 1963. The station was closed on 2 November 1964.[2]

Reopening proposals

Proposals to reintroduce passenger rail services to the currently freight-only section of the former Blyth and Tyne Railway system have been discussed since the 1990s.[3] [4]

In the early 2010s, Northumberland County Council became interested in the proposals, commissioning Network Rail to complete a GRIP 1 study to examine the best options for the scheme in June 2013.[5] This report was published in March 2014 and was followed in June 2015 with the commissioning of a more detailed GRIP 2 study at a cost of £850,000.[6] The GRIP 2 study, published in October 2016, confirmed that the reintroduction of a frequent seven-day a week passenger service between, and possibly a new terminus to the east, at, was feasible and could provide economic benefits of £70 million with more than 380,000 people using the line each year by 2034.[7] The study suggested that a new Blyth Park & Ride station should be constructed close to the site of Bebside station to serve Blyth due to its proximity to the A189 dual carriageway.[8]

Despite a change in the political leadership of Northumberland County Council following the 2017 local elections[9] the authority continued to develop the project,[10] encouraged by the Department for Transport's November 2017 report, A Strategic Vision for Rail, which named the line as a possible candidate for a future reintroduction of passenger services.[11] [12] Consequentially, NCC commissioned a further interim study in November 2017 (dubbed GRIP 2B) to determine whether high costs and long timescales identified in the GRIP 2 Study could be reduced by reducing the initial scope of the project, but the report failed to deliver on this.[13]

Nonetheless, the county council has continued to develop the project, hiring AECOM and SCL Rail as contractors to develop the scheme on their behalf in 2018 and allocating an additional £3.46 million in funding for a further business case and detailed design study[14] (equivalent to GRIP 3) in February 2019. Revised plans were revealed in July 2019 which were reduced in scope from the 2016 GRIP 2 study and proposed 4-phase project[15] to reduce the initial cost of the scheme. The proposed station at Bebside (now referred to as Blyth Bebside) would have only been added during Phase 2. However, in August 2020, it was reported that these four proposed phases might be merged into a single one.[16]

The North East Joint Transport Committee's bid for £377 million of funding from the UK Government's £1.28 billion Transforming Cities Fund, submitted on 20 June 2019, includes £99 million to fund the reintroduction of passenger services between Newcastle and Ashington,[17] while further work is ongoing to secure additional public and private investment for the project.[18]

The Department for Transport allocated an initial grant of £1.5 million towards the project costs in January 2020[19] which was supplemented by an allocation of £10 million of funds from Northumberland County Council the following month.[20] This funding enabled AECOM to begin detailed on-site ground investigation works in October 2020.[21] The allocation of a further £34 million of UK Government funding for the project in January 2021 enables the necessary land to be purchased, detailed designs to be prepared and some early preparatory and site works to begin.[22] In January 2021, it was anticipated that the UK Government would fund the remainder of the project cost, estimated at £166 million as of January 2021, once the final phase of design works were completed.[23] However, in April 2021, it was reported that government officials were seeking to reduce the cost of the project as part of the Department for Transport's Project SPEED initiative.[24] It was reported that the cost-saving measures under consideration included dropping the proposed station at Bebside from initial project scope and cutting initial service frequencies from two to one trains per hour. Although Minister for Railways Chris Heaton-Harris later reiterated the UK Government's commitment to opening the new station at Bebside, it remains unclear whether other cost saving measures, such as reducing service frequencies, are being pursued.[25]

A planning application for the proposed new station at Bebside was submitted to Northumberland County Council on 5 March 2021.[26] The submitted planning documents indicate that the station will be located approximately 200m (700feet) to the south of the original one,[27] where the line passes through a cutting.[28] The station will have entrances on both sides of the tracks and its two 100m (300feet) platforms will be accessed via lifts and stairs from a glass-sided footbridge.[29] A 293 space car park will be provided adjacent to the western entrance while a new cycle path will be created to link the eastern entrance directly to Bebside and Blyth (crossing the A189 road via a new bridge).

Northumberland County Council submitted a Transport and Works Act Order application to the Secretary of State for Transport Grant Shapps on 26 May 2021,[30] [31] under which they would be conferred certain additional powers deemed necessary for the new stations to be constructed and the line upgraded to carry regular passenger services.[32] The application was approved in June 2022. The new Blyth Bebside station was constructed by the project's primary construction contractor, Morgan Sindall.[33] It is anticipated that the opening date will be in 2024.[34]

Construction of the new station is underway and but is not expected to be ready in time for the line opening in Summer 2024. [35]

Services

Weekday and Saturday daytime services are expected to operate twice-hourly, with an hourly service during the evening and on Sunday, with an end-to-end journey time between Newcastle and Ashington of around 35 minutes.[36] All services are expected to be operated by Northern Trains.

(Expected) rolling stock used: Class 156 Super Sprinter and Class 158 Express Sprinter

References

Sources

Notes and References

  1. Web site: 16 January 2024 . Passenger rail service confirmed for 2024 opening . 9 April 2024 . . en-gb.
  2. Web site: Disused Stations: Bebside. Disused Stations. 10 March 2017.
  3. . Ashington, Blyth and Tyne Railway. . 10 January 2007 . 135WH . 139WH . Denis Murphy . etal .
  4. Web site: Graham. Hannah. 24 January 2021. 'They said it was impossible': Campaigners celebrate success in 15-year Northumberland railway fight - Chronicle Live. 25 January 2021. Chronicle Live.
  5. News: The Journal: Ashington Blyth and Tyne rail line restoration scheme gets green light. 10 March 2017. 12 March 2017. https://web.archive.org/web/20170312055609/http://www.thejournal.co.uk/news/north-east-news/ashington-blyth-tyne-rail-line-4391984. dead.
  6. News: New Post Leader: Plans for rail line reach milestone. 10 March 2017. https://web.archive.org/web/20170312081250/http://www.newspostleader.co.uk/news/plans-for-rail-line-reach-milestone-1-7510419. 12 March 2017. dead.
  7. News: Chronicle Live: Reopening of Newcastle to Ashington rail link moves one step closer. 10 March 2017.
  8. Web site: Ashington Blyth & Tyne GRIP 2 Study. https://web.archive.org/web/20170312050704/http://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Infrastructure%20Studies/Ashington-Blyth-and-Tyne-GRIP-Study-June-2016.pdf. 12 March 2017. dead. 10 March 2017. dmy-all.
  9. Web site: Northumberland local elections results IN FULL - council held by Tories in 'straw draw' drama - Chronicle Live. Kelly. Mike. Muncaster. Michael. 5 May 2017. Chronicle Live. 22 July 2019.
  10. Web site: Northumberland's draft local plan unveiled: What it means for houses, jobs and the green belt - Chronicle Live. Graham. Hannah. 1 June 2018. Chronicle Live. 22 July 2019.
  11. Book: Connecting people: a strategic vision for rail. November 2017. Department for Transport. 9781528601252. 22 July 2019.
  12. Web site: What's in the government's new rail strategy? CityMetric. Allen. Andrew. 12 December 2017. CityMetric. 22 July 2019. 22 July 2019. https://web.archive.org/web/20190722174624/https://www.citymetric.com/transport/what-s-government-s-new-rail-strategy-3543. dead.
  13. Web site: SENRUG - South East Northumberland Rail User Group: Re-open Ashington Blyth & Tyne Line. live. https://web.archive.org/web/20190408210613/http://www.senrug.co.uk/Re-open-AshingtonBlythTyneLine.php. 8 April 2019. 22 April 2019. SENRUG - South East Northumberland Rail User Group.
  14. Web site: Phasing of proposed Northumberland rail line explained after concerns raised News Post Leader. O'Connell. Ben. 28 February 2019. News Post Leader. 22 July 2019.
  15. Web site: Six new stations could open if Ashington to Newcastle passenger trains resume - Chronicle Live. O'Connell. Ben. 15 July 2019. Chronicle Live. 22 July 2019.
  16. Web site: 15 August 2020. Northumberland line could reopen in one phase News Post Leader. 25 January 2021. News Post Leader.
  17. Web site: North East's £377m transport funding bid confirmed - but leaders say there is more to come - Chronicle Live. Holland. Daniel. 19 June 2019. Chronicle Live. 22 July 2019.
  18. Web site: Northumberland Line could reopen for passengers in 2022 Rail Engineer. 28 March 2019. Rail Engineer. 22 July 2019. 22 July 2019. https://web.archive.org/web/20190722174614/https://www.railengineer.co.uk/2019/03/28/northumberland-line-could-reopen-for-passengers-in-2022/. dead.
  19. Web site: How plans to re-open Newcastle to Ashington railway line could boost region. Sharma. Sonia. 2020-01-28. North East Chronicle. 2020-02-26.
  20. Web site: £162m Northumberland Line scheme moves to design phase. The Construction Index. 14 May 2020. 25 May 2020.
  21. Kennedy. Catherine. 26 October 2020. Ground investigation underway to convert Northumberland Line for passenger services - New Civil Engineer. 25 January 2021. New Civil Engineer.
  22. Web site: Burroughs. David. 23 January 2021. £794m package to reopen British lines unveiled International Railway Journal. 21 January 2021. International Railway Journal.
  23. Web site: O'Connell. Ben. 23 January 2021. Government confirms £34million for Northumberland Line - Rail Minister says he's 'lucky to be reopening train lines' Northumberland Gazette. 25 January 2021. Northumberland Gazette.
  24. Web site: Walker. Jonathan. 16 April 2021. Planned new Northumberland rail line is being cut back before work has even begun - Chronicle Live. 2 July 2021. Chronicle Live.
  25. Web site: Sharma. Sonia. 25 April 2021. Minister confirms plans for all six stations on Northumberland rail line are on track - Chronicle Live. 2 July 2021. Chronicle Live.
  26. Web site: 21/00878/CCD Construction of a two platform railway station including: pedestrian lifts, stepped and ramped pedestrian access, upgrade of existing junction to provide signalised access to station; modifications to highways including pedestrian footways; provision of parking for buses, cars, electric vehicles, motorcycles, cycles, and taxis; works to public rights of way ; construction of a pedestrian and cycle bridge, facilities ancillary to the station including, lighting, soft and hard landscaping, surface and subsurface drainage, utilities and other services, boundary treatment and other associated works. Land South Of Heather Lea Errington Street Bebside Northumberland. 15 March 2021. Northumberland County Council.
  27. Web site: Healey. Alannah. Gillan. Peter. 3 March 2021. 21/00878/CCD - PLANNING STATEMENT. 15 March 2021. Northumberland County Council.
  28. Web site: 3 March 2021. 21/00878/CCD - PLATFORM GENERAL ARANGEMENT. 15 March 2021. Northumberland County Council.
  29. Web site: 3 March 2021. 21/00878/CCD - STATION FOOTBRIDGE. 15 March 2021. Northumberland County Council.
  30. Web site: Smith. Ian. 28 May 2021. New application seeks authorisation for return of passenger rail services on the Northumberland Line New Post Leader. 2 July 2021. New Post Leader.
  31. Web site: Northumberland County Council - Northumberland Line. 2 July 2021. Northumberland County Council.
  32. Web site: O'Connor. Duncan. 26 May 2021. Northumberland Line TWAO Application Letter. 2 July 2021. Northumberland County Council.
  33. Horgan. Rob. 9 August 2021. Morgan Sindall to build six new stations for Northumberland line restoration New Civil Engineer. 11 August 2021. New Civil Engineer.
  34. Web site: About the Northumberland Line . 2024-03-07 . Northumberland Line . en.
  35. Web site: Signalling goes live on new rail line . BBC News . BBC . 15 April 2024.
  36. Web site: The Northumberland Line project . 2024-04-09 . . en-GB.