San Francisco–Oakland Bay Bridge Explained

Bridge Name:San Francisco–Oakland
Bay Bridge
Crosses:San Francisco Bay
via YBI
Locale:San Francisco and Oakland, California, U.S.
Owner:State of California
Maint:California Department of Transportation and the Bay Area Toll Authority
Id:
  • 34 0003 (West)
  • 34 0004 (YBI Tunnel)
  • 33 0025 (East)
Designer:Charles H. Purcell
Design:Double-decked suspension spans (two, connected by center anchorage), tunnel, cast-in-place concrete transition span, self-anchored suspension span, precast segmental concrete viaduct
Material:Steel, concrete
Mainspan:West: two main spans
2310feet
East: one main span
1400feet
Length:West: 10304feet
East span: 10176feet
Total: 4.46miles
excluding approaches
Width:West: 5 traffic lanes totaling 57.5feet
East: 10 traffic lanes totaling 258.33feet
Height:West: 526feet[1]
East: 525feet (SAS)
Clearance:Westbound:, with additional clearance in some lanes
Eastbound:
Below:West:
East:
Traffic:260,000[2] [3]
Begin:July 8, 1933
January 29, 2002
Complete:November 12, 1936 (original eastern and western spans)
September 2, 2013 (replacement eastern span)
Open:
Closed:September 2, 2013 (original eastern span)
Coordinates:37.8181°N -122.3467°W

The San Francisco–Oakland Bay Bridge, commonly referred to as the Bay Bridge, is a complex of bridges spanning San Francisco Bay in California. As part of Interstate 80 and the direct road between San Francisco and Oakland, it carries about 260,000 vehicles a day on its two decks.[2] [3] It includes one of the longest bridge spans in the United States.

The toll bridge was conceived as early as the California Gold Rush days, with "Emperor" Joshua Norton famously advocating for it, but construction did not begin until 1933. Designed by Charles H. Purcell,[4] [5] and built by American Bridge Company, it opened on Thursday, November 12, 1936, six months before the Golden Gate Bridge. It originally carried automobile traffic on its upper deck, with trucks, cars, buses and commuter trains on the lower, but after the Key System abandoned its rail service on April 20, 1958, the lower deck was converted to all-road traffic as well. On October 12, 1963, traffic was reconfigured to one way traffic on each deck, westbound on the upper deck, and eastbound on the lower deck, with trucks and buses also allowed on the upper deck.[6]

In 1986, the bridge was unofficially dedicated to former California Governor James Rolph.[7]

The bridge has two sections of roughly equal length; the older western section, officially known as the Willie L. Brown Jr. Bridge (after former San Francisco Mayor and California State Assembly Speaker Willie L. Brown Jr.), connects downtown San Francisco to Yerba Buena Island, and the newer east bay section connects the island to Oakland. The western section is a double suspension bridge with two decks, westbound traffic being carried on the upper deck while eastbound is carried on the lower one. The largest span of the original eastern section was a cantilever bridge.

During the 1989 Loma Prieta earthquake, a portion of the eastern section's upper deck collapsed onto the lower deck and the bridge was closed for a month. Reconstruction of the eastern section of the bridge as a causeway connected to a self-anchored suspension bridge began in 2002; the new eastern section opened September 2, 2013, at a reported cost of over $6.5 billion; the original estimate of $250 million was for a seismic retrofit of the existing span.[8] [9] Unlike the western section and the original eastern section of the bridge, the new eastern section is a single deck carrying all eastbound and westbound lanes. Demolition of the old east span was completed on September 8, 2018.[10]

Description

The bridge consists of two crossings, east and west of Yerba Buena Island, a natural mid-bay outcropping inside San Francisco city limits. The western crossing between Yerba Buena and downtown San Francisco has two complete suspension spans connected at a center anchorage.[11] Rincon Hill is the western anchorage and touch-down for the San Francisco landing of the bridge connected by three shorter truss spans. The eastern crossing, between Yerba Buena Island and Oakland, was a cantilever bridge with a double-tower span, five medium truss spans, and a 14-section truss causeway. Due to earthquake concerns, the eastern crossing was replaced by a new crossing that opened on Labor Day 2013.[12] On Yerba Buena Island, the double-decked crossing is a 321foot concrete viaduct east of the west span's cable anchorage, the 540foot Yerba Buena Tunnel through the island's rocky central hill, another 790.8foot concrete viaduct, and a longer curved high-level steel truss viaduct that spans the final 1169.7feet to the cantilever bridge.[13]

The toll plaza on the Oakland side (westbound traffic only since 1969) has eighteen toll lanes, with all charges now made either through the FasTrak electronic toll collection system or through invoices mailed through the USPS, based on the license plate of the car per Department of Motor Vehicle records. Metering signals are about 1000feet west of the toll plaza. Two full-time bus-only lanes bypass the toll booths and metering lights around the right (north) side of the toll plaza; other high occupancy vehicles can use these lanes during weekday morning and afternoon commute periods. The two far-left toll lanes are high-occupancy vehicle lanes during weekday commute periods. Radio and television traffic reports will often refer to congestion at the toll plaza, metering lights, or a parking lot in the median of the road for bridge employees; the parking lot is about 1900feet long, stretching from about 800feet east of the toll plaza to about 100feet west of the metering lights.[14]

During the morning commute hours, traffic congestion on the westbound approach from Oakland stretches back through the MacArthur Maze interchange at the east end of the bridge onto the three feeder highways, Interstate 580, Interstate 880, and I-80 toward Richmond.[15] Since the number of lanes on the eastbound approach from San Francisco is structurally restricted, eastbound backups are also frequent during evening commute hours.

The western section of the Bay Bridge is currently restricted to motorized freeway traffic. Pedestrians, bicycles, and other non-freeway vehicles are not allowed to cross this section. A project to add bicycle/pedestrian lanes to the western section has been proposed but is not finalized. A Caltrans bicycle shuttle operates between Oakland and San Francisco during peak commute hours for $1.00 each way.[16]

Freeway ramps next to the tunnel provide access to Yerba Buena Island and Treasure Island. Because the toll plaza is on the Oakland side, the western span is a de facto non-tolled bridge; traffic between the island and the main part of San Francisco can freely cross back and forth. Those who only travel from Oakland to Yerba Buena Island, and not the entire length to the main part of San Francisco, must pay the full toll.

Early history

Developed at the entrance to the bay, San Francisco was well placed to prosper during the California Gold Rush. Almost all goods not produced locally arrived by ship, as did numerous travelers and erstwhile miners. But after the first transcontinental railroad was completed in May 1869, San Francisco was on the wrong side of the Bay, and separated from the new rail link.

Many San Franciscans feared that the city would lose its position as the regional center of trade. Businessmen had considered the concept of a bridge spanning the San Francisco Bay since the Gold Rush days. During the 1870s, several newspaper articles explored the idea. In early 1872, a "Bay Bridge Committee" was hard at work on plans to construct a railroad bridge. The April 1872 issue of the San Francisco Real Estate Circular reported on this committee:

The self-proclaimed Emperor Norton decreed three times in 1872 that a suspension bridge be constructed to connect Oakland with San Francisco. In the third of these decrees, in September 1872, Norton, frustrated that nothing had happened, proclaimed:

Unlike most of Emperor Norton's eccentric ideas, his decree to build a bridge had a widespread public and political appeal. Yet the task was too much of an engineering and economic challenge, since the bay was too wide and too deep there. In 1921, more than forty years after Norton's death, an underground tube was considered, but it became clear that one would be inadequate for vehicular traffic.[17] Support for a trans-bay crossing increased in the 1920s based on the popularity and availability of automobiles.

Planning

The state legislature and governor passed a law, effective in 1929, to establish the California Toll Bridge Authority (Stats. 1929, Chap 763) and to authorize it and the State Department of Public Works to build a bridge connecting San Francisco and Alameda County (Stats. 1929, Chap 762).[18] [19]

The state appointed a commission to evaluate the idea and various designs for a bridge across the Bay, the Hoover-Young Commission. Its conclusions were made public in 1930.[20]

In January 1931, Charles H. Purcell, the State Highway Engineer of California, who had also served as the secretary of the Hoover-Young Commission, assumed the position of Chief Engineer for the Bay Bridge. Glenn B. Woodruff served as design engineer for the project. He explained in a 1936 article that several elements of the bridge required not only new designs, but also new theories of design.[21]

To make the bridge feasible, a route was chosen via Yerba Buena Island, which would reduce both the material and the labor needed. Since Yerba Buena Island was a U.S. Navy base at the time, the state had to gain approval of the U.S. Congress for this purpose, as it regulates the armed services and supervises all naval and military bases. After a great deal of lobbying, California received Congressional approval to use the island on February 20, 1931, subject to final approvals by the Departments of War, Navy and Commerce.[22] The state applied for permits from the 3 federal departments as required. The permits were granted in January 1932, and formally presented in a ceremony on Yerba Buena Island on February 24, 1932.[23]

On May 25, 1931, Governor James Rolph Jr. signed into law two acts: one providing for the financing of state bridges by revenue bonds, and another creating the San Francisco–Oakland Bay Bridge Division of the State Department of Public Works. On September 15, 1931, this new division opened its offices at 500 Sansome Street in San Francisco.[24]

During 1931, numerous aerial photographs were taken of the chosen route for the bridge and its approaches.[25]

That year, engineers had not determined the final design concept for the western span between San Francisco and Yerba Buena Island, although the idea of a double-span suspension bridge was already favored.[26]

In April 1932, the preliminary final plan and design of the bridge was presented by Chief Engineer Charles Purcell to Col. Walter E. Garrison, Director of the State Department of Public Works, and to Ralph Modjeski, head of the Board of Engineering Consultants. Both agencies approved and preparation of the final design proceeded.[27] [28] In 1932, Joseph R. Knowland, a former U.S. Congressman from California, traveled to Washington to help persuade President Herbert Hoover and the Reconstruction Finance Corporation to advance $62 million to build the bridge.

Construction

Before work began, 12 massive underwater telephone cables were moved of the proposed bridge route by crews of the Pacific Telephone and Telegraph Co. during the summer of 1931.[29]

Construction began on July 9, 1933[30] after a groundbreaking ceremony attended by former president Herbert Hoover, dignitaries, and local beauty queens.[31]

The western section of the bridge between San Francisco and Yerba Buena Island presented an enormous engineering challenge. The bay was up to deep in places and the soil required new foundation-laying techniques.[17] A single main suspension span some 4100feet in length was considered but rejected, as it would have required too much fill and reduced wharfage space at San Francisco, had less vertical clearance for shipping, and cost more than the design ultimately adopted.[32] The solution was to construct a massive concrete anchorage halfway between San Francisco and the island, and to build a main suspension span on each side of this central anchorage.[33]

East of Yerba Buena Island, the bay to Oakland was spanned by a 10176feet combination of double cantilever, five long-span through-trusses, and a truss causeway, forming the longest bridge of its kind at the time.[17] The cantilever section was longest in the nation and third-longest anywhere.[34]

Much of the original eastern section was founded upon treated wood pilings. Because of the very deep mud on the bay bottom, it was not practical to reach bedrock, although the lower levels of the mud are quite firm. Long wooden pilings were crafted from entire old-growth Douglas fir trees, which were driven through the soft mud to the firmer bottom layers.[35] The construction project had casualties: twenty-four men would die while constructing the bridge.[36]

Design and construction

California Department of Transportation engineer C.H. Purcell served as chief engineer for the Bay Bridge, including the construction of the Yerba Buena Tunnel. Before starting excavation, the ground through which the western half of the tunnel would be bored was stabilized by injecting cement grout under pressure through 25 1.5inches holes bored into the loose rock over the crown of the tunnel.[37]

After excavating the western and eastern open portals, three drifts were bored from west to east along the path of the tunnel: one at the crown and the other two at the lower corners. The first drift broke through in July 1934, approximately one year after the start of construction.[38] A ceremonial party led by Governor Merriam celebrated the completion of the first 12adj=midNaNadj=mid drift on July 24 by walking through it, followed by a short speech.[39] [40] The space between the three drifts was then excavated, resulting in a single arch-shaped bore (in cross-section), and the tunnel roof was constructed using 16inches steel I-beam ribs spaced apart to support the rock, which were then embedded in concrete up to thick at the crown. No cave-ins occurred during the excavation of the tunnel.[41]

After the roof was completed, the remaining core of rock between the tunnel roof and lower deck was excavated using a power shovel. By May 1935, work on removing the core was progressing and 40 steel ribs had been placed; concrete embedment was just starting.[42] Removal of the core was completed on November 18, 1935.[43] Once the excavation was complete, the upper deck was placed and the interior ceiling above the upper deck was lined with tiles. The last concrete poured during the construction of the Bay Bridge was part of the upper deck lining in late summer 1936. This included the emplacement of regularly spaced refuge bays ("deadman holes") along the south wall of the lower deck tunnel, escape alcoves common in all railway tunnels into which track maintenance workers could duck if a train came along.[44] These remain and are visible to eastbound motorists today.

The completed tunnel bore is wide and high overall, and the dimensions of the tunnel interior are wide and high. In 1936, it was hailed as the world's largest-bore tunnel.[45] [46] [47] The cross-sectional area of the upper half is, and the lower half is .

Reminders of the long-gone bridge railway survive along the south side of the lower Yerba Buena Tunnel. These are the regularly spaced refuge bays ("deadman holes"), escape alcoves common in all railway tunnels, along the wall, into which track maintenance workers could safely retreat if a train came along. (The north side, which always carried only motor traffic, lacks these holes.)[48] [49]

Opening day

The bridge opened on November 12, 1936, at 12:30 p.m. In attendance were the former US president Herbert Hoover, Senator William G. McAdoo, and the Governor of California, Frank Merriam. Governor Merriam opened the bridge by cutting gold chains across it with an acetylene cutting torch.[50] The San Francisco Chronicle report of November 13, 1936, read:

The total cost was US$77 million.[17] Before opening the bridge was blessed by Cardinal Secretary of State Eugene Cardinal Pacelli, later Pope Pius XII.[51] Because it was in effect two bridges strung together, the western spans were ranked the second and third largest suspension bridges. Only the George Washington Bridge had a longer span between towers.

As part of the celebration a United States commemorative coin was produced by the San Francisco Mint. A half dollar, the obverse portrays California's symbol, the grizzly bear, while the reverse presents a picture of the bridge spanning the bay. A total of 71,369 coins were sold, some from the bridge's tollbooths.[52]

Yerba Buena Tunnel

The Yerba Buena passage utilizes the Yerba Buena Tunnel, also known as the Yerba Buena Island Tunnel. The tunnel is wide, high, and long.[13] It is the largest diameter transportation bore tunnel in the world.[17] The large amount of material that was excavated in boring the tunnel was used for a portion of the landfill over the shoals lying adjacent to Yerba Buena Island to its north, a project which created the artificial Treasure Island. The contract to build the Yerba Buena Cable Anchorage, Tunnel & Viaduct segment was opened for bids on March 28, 1933, and awarded to the low bidder, Clinton Construction Company of California, for $1,821,129.50 (equivalent to $ in).[53] Yerba Buena Island was the main site of the official groundbreaking for the Bay Bridge on July 9, 1933, when President Franklin D. Roosevelt remotely set off a dynamite blast on the eastern side of the island at 12:58 p.m. local time.[54] Former President Herbert Hoover and Governor James Rolph were onsite; the two men were the first to turn over the earth with ceremonial golden spades.[55] Other ceremonies took place simultaneously in San Francisco (on Rincon Hill) and Oakland Harbor.[56] [57]

The Yerba Buena Tunnel opened, along with the rest of the Bay Bridge, on November 12, 1936. the tunnel lacks an official name.[58]

Post-opening history

1930s–1960s

The Bridge Railway

Construction of the Bridge Railway began on November 29, 1937, with the laying of the first ties.[59] The first train was run across the Bay Bridge on September 23, 1938, a test run utilizing a Key System train consisting of two articulated units with California Governor Frank Merriam at the controls.[60] On January 14, 1939, the San Francisco Transbay Terminal was dedicated. The following morning, January 15, 1939, the electric interurban trains started in revenue service, running along the south side of the lower deck of the bridge. The terminal originally was supposed to open at the same time as the Bay Bridge, but had been delayed.

Trains over the Bridge Railway were operated by the Sacramento Northern Railroad (Western Pacific), the Interurban Electric Railway (Southern Pacific) and the Key System.[61] Freight trains never used the bridge. The tracks left the lower deck in San Francisco just southwest of the end of 1st St. They then went along an elevated viaduct above city streets, looping around and into the terminal on its east end. Departing trains exited on the loop back onto the bridge.[62] The loop continued to be used by buses until the terminal's closure in 2010. The tracks left the lower deck in Oakland. The Interurban Electric Railway tracks ran along Engineer Road and over the Southern Pacific yard on trestles (some of it is still standing and visible from nearby roadways) onto the streets and dedicated right-of-ways in Berkeley, Albany, Oakland and Alameda. The Sacramento Northern and Key System tracks went under the SP tracks through a tunnel (which still exists and is in use as an access to the EBMUD treatment plant) and onto 40th St. Due to falling ridership, Sacramento Northern and IER service ended in 1941.[63]

On September 13, 1942, a stop was opened at Yerba Buena Island to serve expanded wartime needs on adjacent Treasure Island.[64]

Despite the vital role the railroad played, the last train went over the bridge in April 1958. The tracks were removed and replaced with pavement on the Transbay Terminal ramps and Bay Bridge. The Key System handled buses over the bridge until 1960 when its successor, AC Transit, took over operations. It still handles service today, running to a new transbay terminal located in the same vicinity in San Francisco, the Salesforce Transit Center.

Emperor Norton plaque and relocation

In 1872, the San Francisco entrepreneur and eccentric Emperor Norton issued three proclamations calling for the design and construction of a suspension bridge between San Francisco and Oakland via Yerba Buena Island (formerly Goat Island).[65] A 1939 plaque honoring Emperor Norton for the original idea for the Bay Bridge was dedicated by the fraternal society E Clampus Vitus and was installed at The Cliff House in February 1955. In November 1986, in connection with the bridge's 50th anniversary, the plaque was moved to the Transbay Terminal, the public transit and Greyhound bus depot at the west end of the bridge in downtown San Francisco. When the terminal was closed in 2010, the plaque was placed in storage.[66]

1960s–2010s

Roadway retrofit

Until the 1960s, the upper deck (58feet wide between curbs) carried three lanes of traffic in each direction and was restricted to automobiles only.[17] The lower deck carried three lanes of truck and bus traffic, with autos allowed, on the north side of the bridge.[17] In the 1950s traffic lights were added to set the direction of travel in the middle lane, but there still remained no divider. Two interurban railroad tracks on the south half of the lower deck carried the electric commuter trains.[67] In 1958 the tracks were replaced with pavement, but the reconfiguration to what the traffic eventually became did not take place until 1963.

The Federal highway on the bridge was originally a concurrency of U.S. Highway 40 and U.S. Highway 50. The bridge was re-designated as Interstate 80 in 1964, and the western ends of U.S. 40 and U.S. 50 are now in Silver Summit, Utah, and West Sacramento, California, respectively.

Reconstruction of approaches

The original western approach to (and exit from) the upper deck of the bridge was a long ramp to Fifth Street, branching to Harrison St for westward traffic off the bridge and Bryant St for eastward traffic entering. There was also an on-ramp to the upper deck on Rincon Hill from Fremont Street (which later became an off-ramp) and an off-ramp to First Street (later extended over First St to Fremont St). The lower deck ended at Essex and Harrison St; just southwest of there, the tracks of the bridge railway left the lower deck and curved northward into the elevated loop through the Transbay Terminal that was paved for buses after rail service ended.[68]

The eastern approach to the bridge included a causeway landing for the "incline" section, and the construction of three feeder highways, interlinked by an extensive interchange,[69] which in later years became known as "The MacArthur Maze". A massive landfill was emplaced, extending along the north edge of the existing Key System rail mole to the existing bayshore, and continuing northward along the shore to the foot of Ashby Avenue in Berkeley.[70] The fill was continued northward to the foot of University Avenue as a causeway which enclosed an artificial lagoon, subsequently developed by the WPA as "Aquatic Park". The three feeder highways were U.S. Highway 40 (Eastshore Highway) which led north through Berkeley, U.S. Highway 50 (38th Street, later MacArthur Blvd.) which led through Oakland, and State Route 17 which ran parallel to U.S. 50, along the Oakland Estuary and through the industrial and port sections of the city.

The current approaches were constructed in the 1960s, as the original ones were not up to interstate highway standards and were designed mainly for local use.

Yerba Buena Tunnel Reconstruction

As originally completed, the upper deck was reserved for automobile traffic, and carried six lanes, each 9inchesft8inchesin (ftin) wide. The lower deck was further divided into three lanes of traffic for heavy trucks (each 10inchesft4inchesin (ftin) wide), and the two railroad tracks on the south side (27feet wide for both tracks).[71] The initial design in 1932 called for the two rail tracks to flank a central truck deck on the lower level.[72] After Key System trains stopped running over the bridge in 1958, bids were opened on October 11, 1960, to rebuild the tunnel. The rebuild consisted of multiple stages of work:

  1. Remove Key System rails, lower rail deck and repave
  2. Lower the truck traffic half of the lower deck by and repave
  3. Remove center columns supporting upper deck
  4. Lower the upper deck by by placing precast concrete units

After the reconstruction, the tunnel would handle only road traffic. The upper deck was lowered to accommodate heavy truck traffic, as each deck would now carry five lanes of unidirectional traffic. The upper deck was dedicated to westbound traffic, and the lower deck was dedicated to eastbound traffic.[73] The impact to traffic during reconstruction of the tunnel was minimized mainly by working outside normal commuting hours and through the use of a portable steel bridge long and wide, designed to fit between the curbs of the existing upper deck.[74] The bridge spanned the gap between the new upper deck and old upper deck, and the overall elevation change of caused drivers to slow to 15mph, resulting in traffic jams.[75] [76] The first accident caused by "The Hump", the nickname the bridge acquired after prominent warning signs advertising its presence, occurred just twelve minutes after it was first deployed on November 25, 1961.

The new precast upper deck units were each 7feet long, and were installed in two halves. One side of each half rested on a temporary falsework erected in the middle of the lower deck, and the other side rested on the shoulder of the tunnel wall previously used to support the old upper deck. After the two halves were fastened together, a steel form was used to close the 1feet gap between halves, and concrete was poured in the gap. The upper deck rests on 12adj=midNaNadj=mid shoulders built into the tunnel wall, padded by NaNadj=midNaNadj=mid Masonite.

The planned completion date for tunnel reconstruction was July 1962,[77] but "The Hump" was not dismantled until October 27, 1962. The San Francisco Chronicle marked the occasion by quipping "[The Hump] produced more jams than Grandma ever made."[78] After reconstruction, both the upper and lower decks featured of vertical clearance. Upper deck clearance is restricted by the tunnel portal, and lower deck clearance is restricted by the upper deck.

Rail removal

Automobile traffic increased dramatically in the ensuing decades of the bridge's opening. This, among other things, resulted in the Key Systems decline, and by the 1960s having rails on the bridge had become obsolete and a detriment to traffic, as they carried nothing on them. Work began on removing the tracks in October 1963. After the work was completed, the Bay Bridge was reconfigured with five lanes of westbound traffic on the upper deck and five lanes of eastbound traffic on the lower deck. The Key System originally planned to end train operations in 1948 when it replaced its streetcars with buses, but Caltrans did not approve of this. Trucks had their ban lifted and were allowed on the top deck for the first time.[17] Due to this, the upper deck was retrofitted to handle the increased loads, with understringers added and prestressing added to the bottom of the floor beams. This retrofit is still in place today, and is visible to Eastbound traffic on the western span.

In current times, there have been attempts to restore rail service to the bridge, but none were successful. A study released in 2000 estimated the cost of restoring rail service across the bridge at up to $8 billion .[79]

1968 aircraft accident

On February 11, 1968, a U.S. Navy training aircraft crashed into the cantilever span of the bridge, killing both reserve officers aboard. The T2V SeaStar, based at NAS Los Alamitos in southern California, was on a routine weekend mission and had just taken off in the fog from nearby NAS Alameda. The plane struck the bridge about 15feet above the upper deck roadway and then sank in the bay north of the bridge.[80] There were no injuries among the motorists on the bridge.[81] One of the truss sections of the bridges was replaced due to damage from the impact.[82]

1986 Cable lighting

The series of lights adorning the westbound spans suspension cables were added in 1986 as part of the bridge's 50th-anniversary celebration.[83]

James B. Rolpf Jr. designation

The bridge was unofficially "dedicated" to James B. "Sunny Jim" Rolph, Jr.,[84] but this was not widely recognized until the bridge's 50th-anniversary celebrations in 1986. The official name of the bridge for all functional purposes has always been the "San Francisco–Oakland Bay Bridge", and, by most local people, it is referred to simply as "the Bay Bridge". Rolph, a Mayor of San Francisco from 1912 to 1931, was the Governor of California at the time construction of the bridge began. He died in office on June 2, 1934, two years before the bridge opened, leaving the bridge to be named for him out of respect.[17]

1989 Loma Prieta Earthquake and emergency repairs

On the evening of October 17, 1989, during the Loma Prieta earthquake, which measured a 6.9 on the moment magnitude scale,[85] a 50feet section of the upper deck of the eastern truss portion of the bridge at Pier E9 collapsed onto the deck below, indirectly causing one death. The bridge was closed for just over a month as construction crews repaired the section. That same year, the bridge reopened to traffic on November 18.

2001 terrorism threat

On November 2, 2001, in the aftermath of the September 11 attacks, Governor Gray Davis announced a threat of a rush hour attack against a West Coast suspension bridge (a group which includes the Bay Bridge and the Golden Gate Bridge) some time between November 2 and 7, resulting in an increase of openly armed law enforcement patrols.[86] [87]

A small fraction of drivers shifted to ferries and BART.[88] It was later revealed that crews had secretly been working under armed guard for several weeks to harden the suspension cable attachment points, which were vulnerable to cutting with common weapons and tools. An anchor room was filled with concrete, doors welded shut, and a razor wire fence added. A blast wall was also added to defend against a potential truck bomb.[89] In the end, no attack occurred.

Emperor Norton naming campaign

In November 2004, after a campaign by San Francisco Chronicle cartoonist Phil Frank, then-San Francisco District 3 Supervisor Aaron Peskin introduced a resolution to the San Francisco Board of Supervisors calling for the entire two-bridge system, from San Francisco to Oakland, to be named for Emperor Norton.[90]

On December 14, 2004, the Board approved a modified version of this resolution, calling for only "new additions"—i.e., the new eastern crossing—to be named "The Emperor Norton Bridge".[91] Neither the City of Oakland nor Alameda County passed any similar resolution, so the effort went no further.

Western span retrofit

The western section has undergone extensive seismic retrofitting. During the retrofit, much of the structural steel supporting the bridge deck was replaced while the bridge remained open to traffic. Engineers accomplished this by using methods similar to those employed on the Chicago Skyway.[92]

The entire bridge was fabricated using hot steel rivets, which are impossible to heat treat and so remain relatively soft. Analysis showed that these could fail by shearing under extreme stress. Therefore, at most locations, rivets were replaced with high-strength bolts.[93] Most bolts had domed heads placed facing traffic so they looked similar to the rivets that were removed.[94] . This work had to be performed with great care as the steel of the structure had for many years been painted with lead paint, which had to be carefully removed and contained by workers with extensive protective gear so that they would not suffocate.

Most of the beams were originally constructed of two plate -beams joined with lattices of flat strip or angle stock, depending upon structural requirements. These have all been reconstructed by replacing the riveted lattice elements with bolted steel plate and so converting the lattice beams into box beams. This replacement included adding face plates to the large diagonal beams joining the faces of the main towers, which now have an improved appearance when viewed from certain angles.

Diagonal box beams have been added to each bay of the upper and lower decks of the western spans. These add stiffness to reduce side-to-side motion during an earthquake and reduce the probability of damage to the decking surfaces.

Analysis showed that some massive concrete supports could burst and crumble under likely stresses. In particular the western supports were extensively modified. First, the location of existing reinforcing bar is determined using magnetic techniques. In areas between bars holes are drilled. Into these holes is inserted and glued an L-shaped bar that protrudes . This bar is retained in the hole with a high-strength epoxy adhesive. The entire surface of the structure is thus covered with closely spaced protrusions. A network of horizontal and vertical reinforcing bars is then attached to these protrusions. Mold surface plates are then positioned to retain high-strength concrete, which is then pumped into the void. After removal of the formwork the surface appears similar to the original concrete. This technique has been applied elsewhere throughout California to improve freeway overpass abutments and some overpass central supports that have unconventional shapes. (Other techniques such as jacket and grout are applied to simple vertical posts; see the seismic retrofit article.)

The western approaches have also been retrofitted in part, but mostly these have been replaced with new construction of reinforced concrete.

2007 Cosco Busan oil spill

In 2007, a container ship then named the Cosco Busan, and subsequently renamed the Hanjin Venezia, collided with the Delta Tower fender, resulting in the Cosco Busan oil spill.[95] [96] [97] [98]

October 2009 eyebar crack, repair failure and bridge closure

During the 2009 Labor Day weekend[99] closure for a portion of the replacement, a major crack was found in an eyebar, significant enough to warrant bridge closure.[100] Working in parallel with the retrofit, California Department of Transportation (Caltrans), and its contractors and subcontractors, were able to design, engineer, fabricate, and install the pieces required to repair the bridge, delaying its planned opening by only hours. The repair was not inspected by the Federal Highway Administration, which relied on state inspection reports to ensure safety guidelines were met.[101]

On October 27, 2009, during the evening commute, the steel crossbeam and two steel tie rods repaired over Labor Day weekend[102] snapped off the Bay Bridge's eastern section and fell to the upper deck.[103] [104] [105] This may have been due to metal-on-metal vibration from bridge traffic and wind gusts of up to 55mph, which resulted in one of the rods breaking off and caused one of the metal sections to come crashing down.[106] Three vehicles were either struck by or hit the fallen debris, though there were no injuries.[107] [108] [109] [110] On November 1, Caltrans announced that the bridge would probably stay closed at least through the morning commute of Monday, November 2 after repairs performed during the weekend failed a stress test on Sunday.[111] BART and the Golden Gate Ferry systems added supplemental service to accommodate the increased passenger load during the bridge closure.[112] The bridge reopened to traffic on November 2, 2009.

The pieces that broke off on October 27 were a saddle, crossbars, and two tension rods.[107] [113]

2010s–present

Willie L. Brown, Jr., Bridge naming resolution

In June 2013, nine state assemblymen, joined by two state senators, introduced Assembly Concurrent Resolution No. 65 (ACR 65) to name the western crossing of the bridge for former California Assembly Speaker and former San Francisco Mayor Willie Brown.[114] Six weeks later, a grassroots petition was launched seeking to name the entire two-bridge system for Emperor Norton.[115] In September 2013, the petition's author launched a nonprofit, The Emperor's Bridge Campaign — now known as The Emperor Norton Trust — that advocates for adding "Emperor Norton Bridge" as an honorary name (rather than "renaming" the bridge) and that undertakes other efforts to advance Norton's legacy.[116] The state legislative resolution naming the western section of the Bay Bridge the "Willie L. Brown, Jr., Bridge" passed the Assembly in August 2013 and the Senate in September 2013.[117] A ceremony was held on February 11, 2014, marking the resolution and the installation of signs on either end of the section.[118]

Eastern span replacement

See main article: Eastern span replacement of the San Francisco–Oakland Bay Bridge. For various reasons, the eastern section would have been too expensive to retrofit compared to replacing it, so the decision was made to replace it.

The replacement section underwent a series of design changes, both progressive and regressive, with increasing cost estimates and contractor bids. The final design included a single-towered self-anchored suspension span starting at Yerba Buena island, leading to a long inclined viaduct to the Oakland touchdown.[119]

Separated and protected bicycle lanes are a visually prominent feature on the south side of the new eastern section. The bikeway and pedestrian path across the eastern span opened in October 2016 and carries recreational and commuter cyclists between Oakland and Yerba Buena Island.[120] The original eastern cantilever span had firefighting dry standpipes installed. No firefighting dry or wet standpipes were designed for the eastern section replacement, although, the firefighting wet standpipes do exist on the original western section visible on both the north-side upper and lower decks.

The original eastern section closed permanently to traffic on August 28, 2013, and the replacement span opened for traffic five days later.[121] The original eastern section was dismantled between January 2014 and November 2017.[122] [123]

2013 public "light sculpture" installation

On March 5, 2013, a public art installation called "The Bay Lights" was activated on the western span's vertical cables. The installation was designed by artist Leo Villareal and consists of 25,000 LED lights originally scheduled to be on nightly display until March 2015.[124] However, on December 17, 2014, the non-profit Illuminate The Arts announced that it had raised the $4 million needed to make the lights permanent; the display was temporarily turned off starting in March 2015 in order to perform maintenance and install sturdier bulbs and then re-lit on January 30, 2016.[125] [126]

In order to reduce driver distractions, the privately funded display is not visible to users of the bridge, only to distant observers. This lighting effort is intended to form part of a larger project to "light the bay".[127] Villareal used various algorithms to generate patterns such as rainfall, reflections on water, bird flight, expanding rings, and others. Villareal's patterns and transitions will be sequenced and their duration determined by computerized random number generator to make each viewing experience unique.[128] Owing to the efficiency of the LED system employed, the estimated operating cost is only US$15.00 per night.

The lights were switched off permanently at 8 pm on March 5, 2023 – the 10th anniversary of the artwork. This was done due to their poor condition and increasing costs to maintian properly. There is a plan to raise additional funds and install a new set of lights later in the year.[129]

Alexander Zuckermann Bike Path

The pedestrian and bicycle route on the eastern section opened on September 3, 2013, and is named after Alexander Zuckermann, founding chair of the East Bay Bicycle Coalition.[130] This forms a transbay route for the San Francisco Bay Trail. Until October 2016, the path did not connect to Yerba Buena and Treasure Island sidewalks, due to the need to demolish more of the old eastern section before final construction.[131] On May 2, 2017, public access was extended to seven days a week, 6 a.m. to 9 p.m.,[132] with occasional closure days for continued demolition of the old bridge foundations.[133] This work was completed on November 11, 2017.[134]

Yerba Buena Tunnel closure and repair

On January 30, 2016, a chunk of concrete the size of an automobile tire fell from the tunnel wall into the slow lane of eastbound traffic on the lower deck of the Yerba Buena Tunnel, causing a minor accident. The concrete fell from where the upper deck is connected to the tunnel wall. Based on an examination of photographs, a professor from Georgia Tech postulated that water infiltration into the concrete wall had caused the reinforcing steel to corrode and expand, forcing a chunk of the tunnel wall out.[135] A subsequent California Department of Transportation (Caltrans) investigation identified 12 spots on both sides of the tunnel wall in the lower deck space showed signs of corrosion-induced damage, but no immediate risk of further spalling. The apparent cause was rainwater leaking from upper deck drains. Caltrans engineers speculated the Masonite pads had swelled due to rainwater infiltration, cracking the tunnel walls and allowing moisture in to the reinforcing steel.[136] Repairs to the degraded concrete started in February 2017. Drains and catch basins were replaced to reduce the likelihood of clogging, and fiberglass-reinforced mortar was used to patch removed concrete. The repairs, which required some daytime lane closures, were expected to last until June 2017.[137]

2020 bus lane proposal

In January 2020, the AC Transit and BART boards of directors supported the establishment of dedicated bus lanes on the bridge.[138] [139] In February 2020, Rob Bonta introduced state legislation to begin planning bus lanes on the bridge.[140]

Opening of the Judge John Shutter Regional Shoreline

On October 21, 2020, the Judge John Sutter Regional Shoreline park opened to the public. Located at the foot of the bridge, the opening of the park has led to easier access to the bike and pedestrian path due to improved parking and pedestrian access.[141]

2016-2023 exit reconstructions

In the 1960s directional reconfiguration, there were three off-ramps added to Yerba Buena Island and Treasure Island: a single left-hand side exit in the western direction at the east end of the tunnel, a left-hand side exit in the eastern direction at the west end of the tunnel (originally signed as just "Treasure Island"), and a right-hand side exit in eastern direction at the east end of the tunnel (originally signed as just "Yerba Buena Island"). The eastbound left exit in particular presented an unusual hazard – drivers had to slow within the normal traffic flow and move into a very short off-ramp that ended in a short radius turn left turn; accordingly, a 15 MPH advisory was posted there. The turn had been further narrowed from its original design by the installation of crash pads on the island side. The eastbound and westbound on-ramps were then on the usual right-hand side, but they did not have dedicated merge lanes, forcing drivers to await gaps in traffic and then accelerate from a stop sign to traffic speeds in a short distance. In 2016, a new on-ramp and off-ramp at the east end of the tunnel were opened in the western direction on the right-hand side of the roadway, replacing the left-hand side off-ramp in that direction.[142] Meanwhile, the eastbound right-hand side off-ramp and on-ramp at the east end of the tunnel was demolished during the reconstruction of the eastern span of the bridge. A new on-ramp on this side was built with a dedicated merge lane, but the off-ramp's replacement was not completed until early-May 2023, well after the bridge's bike path from the Oakland side to the island was fully completed. The eastbound left-hand side off-ramp and westbound on-ramp at the west end of the tunnel are then scheduled then close as early as late-May 2023 while the western span undergoes a seismic retrofit.[143] [144]

pro-Palestinian ceasefire protest

On November 16, 2023, around 7:40 AM PST, more than 80 pro-Palestinian protesters blocked the five westbound lanes on Interstate 80 on the eastern span to demand ceasefire to the 2023 Israel–Hamas war. Some of the protesters parked their cars in the five westbound lanes, threw their keys in the bay, rolled out banners demanding ceasefire and an end to the war in Gaza, and pretended to be in body bags, shutting down the Bay Bridge. This created a traffic jam from the toll plaza in Oakland to the tower of the eastern span. The protesters were arrested by the California Highway Patrol, and all traffic was diverted to Yerba Buena Island. All five westbound lanes were then reopened in the afternoon.[145] Later that evening, at about 5:30 PM PST, on one of the five eastbound lanes, there was a car accident close to the eastern span tower, again closing eastbound traffic for around an hour.[146] [147] Eight days later, on November 24, 2023 (the day after Thanksgiving,) more than 100 pro-Palestinian protesters from the same protest group of the one at the eastern span protest, again rolling out two identical banners after a four-day ceasefire took effect between Hamas and Israel. It took place in downtown San Francisco again demanding permanent ceasefire and an end to killings in Gaza.[148]

Financing and tolls

Current toll rates

Tolls are only collected from westbound traffic at the toll plaza on the Oakland side of the bridge. Those just traveling between Yerba Buena Island and the main part of San Francisco are not tolled. All-electronic tolling has been in effect since 2020, and drivers may either pay using the FasTrak electronic toll collection device, using the license plate tolling program, or via a one time payment online. Effective, the regular toll rate for passenger cars on weekends is $7. Under a congestion pricing scheme on weekdays, the rate increases to $8 during peak traffic hours and decreases to $6 during non-peak hours. Also during peak traffic hours, carpool vehicles carrying three or more people, clean air vehicles, or motorcycles may pay a discounted toll of $3.50 if they have FasTrak and use the designated carpool lane. Drivers must pay within 48 hours after crossing the bridge or they will be sent a toll violation invoice. No additional fees will be added to the toll violation if it is paid within 21 days.[149]

Historical toll rates

When the Bay Bridge opened in 1936, the toll was 65 cents,[83] collected in each direction by men in booths fronting each lane of traffic. Within months, the toll was lowered to 50 cents in order to compete with the ferry system, and finally to 25 cents since this was shown sufficient to pay off the original revenue bonds on schedule (equivalent to $ and $ in respectively). In 1951 there were eighty collectors working various shifts.[150]

On Monday, September 1, 1969, (Labor Day) a change of policy resulted in the toll being collected thereafter only from westbound traffic, at twice the previous rate; eastbound vehicles were toll-exempt.[151]

Tolls were subsequently raised to finance improvements to the bridge approaches, required to connect with new freeways, and to subsidize public transit in order to reduce the traffic over the bridge. The toll was increased by a quarter dollar to 75 cents in 1978 (equivalent to $ in), where it remained for a decade.[152]

Caltrans, the state highway transportation agency, maintains seven of the eight San Francisco Bay Area bridges. (The Golden Gate Bridge is owned and maintained by the Golden Gate Bridge, Highway and Transportation District.)[153]

The basic toll (for automobiles) on the seven state bridges was raised to $1 by Regional Measure 1, approved by Bay Area voters in 1988.[152] [154]

A $1 seismic retrofit surcharge was added in 1998 by the state legislature, originally for eight years, but since then extended to December 2037 (AB1171, October 2001).[155] On March 2, 2004, voters approved Regional Measure 2, raising the toll by another dollar to a total of three dollars (equivalent to $ in). An additional dollar was added to the toll starting January 1, 2007, to cover cost overruns concerning the replacement of the eastern span.

The Metropolitan Transportation Commission, a regional transportation agency, in its capacity as the Bay Area Toll Authority, administers RM1 and RM2 funds, a significant portion of which are allocated to public transit capital improvements and operating subsidies in the transportation corridors served by the bridges. Caltrans administers the "second dollar" seismic surcharge, and receives some of the MTC-administered funds to perform other maintenance work on the bridges. The Bay Area Toll Authority is made up of appointed officials put in place by various city and county governments, and is not subject to direct voter oversight.[156]

Due to further funding shortages for seismic retrofit projects, the Bay Area Toll Authority again raised tolls on all Bay Area bridges in its control (this excludes the Golden Gate Bridge) in July 2010.[157] The toll rate for autos on other Bay Area bridges was increased to five dollars, but in the Bay Bridge a variable pricing tolling scheme based on congestion was implemented. The Bay Bridge congestion pricing scheme charged a $6 toll from 5 a.m. to 10 a.m. and 3 p.m. to 7 p.m., Monday through Friday. During weekends cars paid $5. Carpools before the implementation were exempted but began to pay $2.50, and the carpool toll discount became available only to drivers with FasTrak electronic toll devices. The toll remained at the previous toll of $4 at all other times on weekdays.[158] [159] The Bay Area Toll Authority reported that by October 2010 fewer users are driving during the peak hours and more vehicles are crossing the Bay Bridge before and after the 5–10 a.m. period in which the congestion toll goes into effect. Commute delays in the first six months dropped by an average of 15% compared with 2009.[160] [161] For vehicles with at least 3 axles, the toll rate was $5 per axle.[162]

In June 2018, Bay Area voters approved Regional Measure 3 to further raise the tolls on all seven of the state-owned bridges to fund $4.5 billion worth of transportation improvements in the area.[163] [164] Under the passed measure, the tolls on the Bay Bridge will be raised by $1 on January 1, 2019, then again on January 1, 2022, and again on January 1, 2025. Thus under the congestion pricing scheme, the tolls for autos during the peak weekday rush hours will be $7 in 2019, $8 in 2022, and $9 in 2025; for the non-rush periods, $5 in 2019, $6 in 2022, and $7 in 2025; and on weekends, $6 in 2019, $7 in 2022, and $8 in 2025.[165]

In September 2019, the MTC approved a $4 million plan to eliminate toll takers and convert all seven of the state-owned bridges to all-electronic tolling, citing that 80 percent of drivers are now using Fastrak and the change would improve traffic flow.[166] On March 20, 2020, accelerated by the COVID-19 pandemic, all-electronic tolling was placed in effect for all seven state-owned toll bridges.[167] The MTC then installed new systems at all seven bridges to make them permanently cashless by the start of 2021.[168] In April 2022, the Bay Area Toll Authority announced plans to remove all remaining unused toll booths and create an open-road tolling system which functions at highway speeds.[169]

See also

References

Notes

Bibliography

External links

Official sites
Journals
Media
Other

Notes and References

  1. http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/Sfobbfacts.html San Francisco-Oakland Bay Bridge
  2. Web site: Traffic Census Program . Traffic Volumes: Annual Average Daily Traffic . 2015 . California Department of Transportation . July 14, 2017.
  3. Web site: San Francisco-Oakland Bay Bridge . Bay Area Toll Authority . Metropolitan Transportation Commission . 45.5 million toll-paid vehicles (91.0 million trips) annually . 2014–15 . July 14, 2017.
  4. Web site: San Francisco Oakland Bay Bridge (West) . May 12, 2006 . Structurae . Nicolas Janberg . August 8, 2008.
  5. Web site: San Francisco Oakland Bay Bridge (East) . February 28, 2007 . Structurae . Nicolas Janberg . August 8, 2008.
  6. Bay Bridge Artery, Chris Carlson, "Found SF", orig.2013, updated
  7. Book: 2008 Named Freeways, Highways, Structures and Other Appurtenances in California . January 2009 . . 41 . dead . https://web.archive.org/web/20130523161116/http://dot.ca.gov/hq/tsip/hseb/products/Named_Freeways.pdf . May 23, 2013.
  8. Web site: First Cars Cross SF-Oakland Bay Bridge's New Span . ABC News . September 3, 2013.
  9. News: From $250 Million to $6.5 Billion: The Bay Bridge Cost Overrun . CityLab . Jaffe . Eric . October 13, 2015 . September 28, 2017 . https://web.archive.org/web/20170928174214/https://www.citylab.com/equity/2015/10/from-250-million-to-65-billion-the-bay-bridge-cost-overrun/410254/ . September 28, 2017 . live .
  10. Web site: Old Bay Bridge Demolition. California Department of Transportation.
  11. Web site: San Francisco Oakland Bay Bridge . September 8, 2009 . Bay Bridge Public Information Office . November 16, 2010 . https://web.archive.org/web/20210622003447/http://baybridgeinfo.org/projects/west-span . June 22, 2021 . dead.
  12. Web site: Self-Anchored Suspension (SAS) Span . . Anticipated Completion Date: late 2013 . July 15, 2010 . https://web.archive.org/web/20101026035142/http://baybridgeinfo.org/projects/sas . October 26, 2010 . live .
  13. "Yerba Buena Crossing (Contract No. 04-5)As Built Drawings" Caltrans 2006
  14. News: Richards. Gary. From the Two Trees to the Sig Sanchez: Bay Area road nicknames explained. February 24, 2017. San Jose Mercury News. Bay Area News Group. December 5, 2008.
  15. Rebounding Economy Prompts Rise in Freeway Congestion . . September 14, 2005 . July 12, 2008 . https://web.archive.org/web/20101102174737/http://www.mtc.ca.gov/news/press_releases/2005/rel325.htm . November 2, 2010 . live .
  16. Web site: Caltrans District 4 Bicycle Resources . July 14, 2008 . . July 26, 2008 . https://web.archive.org/web/20101122101833/http://www.dot.ca.gov/dist4/shuttle.htm . November 22, 2010 . live .
  17. Web site: The San Francisco–Oakland Bay Bridge Facts at a glance . Caltrans toll bridge program . . July 12, 2008 . https://web.archive.org/web/20101103075716/http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/Sfobbfacts.html . November 3, 2010 . live .
  18. https://clerk.assembly.ca.gov/sites/clerk.assembly.ca.gov/files/archive/Statutes/1929/29Vol1_29Chapters.pdf Statutes of California, 48th Session, 1929, Chaps. 762-3, p.1489
  19. https://archive.org/stream/californiahighwa192729calirich#page/n467/mode/2up California Highways and Public Works, May-June, 1929, p.15
  20. https://archive.org/stream/californiahighwa193031calirich#page/n441/mode/2up California Highways and Public Works, December, 1930, p.8
  21. Woodruff . Glenn B. . November 1936 . New Problems of Design Solved by Bridge Engineers . Official Journal of the California Department of Highways and Public Works . San Francisco-Oakland Bay Bridge Dedication Number . 21 . Metropolitan Transportation Commission.
  22. https://www.loc.gov/law/help/statutes-at-large/71st-congress/session-3/c71s3ch238.pdf U.S. Statutes at Large, 71st Congress, Chap.238, pp.1192-3
  23. California Highways and Public Works, February, 1932, p.22
  24. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1936_nov.pdf California Highways and Public Works, November, 1936, p.12
  25. http://www.lib.berkeley.edu/EART/AerialPhotos/airphotoc1600/ "Aerial photographs of the San Francisco-Oakland Bay Bridge Approaches-1931", Fairchild Aerial Surveys Inc.
  26. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1931_jun.pdf California Highways and Public Works, June, 1931, p.5
  27. https://archive.org/stream/californiahighwa193031calirich#page/n901/mode/2up California Highways and Public Works, October, 1931, p.12
  28. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1932_apr.pdf California Highways and Public Works, April, 1932, p.22
  29. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1931_jul.pdf "Spectacular Job at Bottom of Sea; 10 Boals, 33 Men Remove Phone Cables", California Highways and Public Works, July, 1931, p.12-13
  30. News: Billions for Building . . XXII . 4 . New York . July 24, 1933 . https://web.archive.org/web/20090916200543/http://www.time.com/time/magazine/article/0,9171,745778-5,00.html . dead . September 16, 2009 . 0040-781X . December 17, 2008.
  31. Web site: Scott . Mall . FreightWaves Classics: San Francisco-Oakland Bay Bridge celebrates 85th anniversary today! . FreightWaves . 20 October 2022 . 12 November 2021.
  32. Leboski, pp. 339–40
  33. https://books.google.com/books?id=ricDAAAAMBAJ&pg=PA22#v=twopage&f=true "World's Largest Bridge rest on sunken skyscrapers"
  34. Petroski, p. 340
  35. Reisner, p. 113
  36. Web site: Building the Bay Bridge: 1930s vs. today. August 9, 2013.
  37. Safety Method of Boring Yerba Buena Tunnel Leaves Core to be Removed . September 1935 . California Highways and Public Works . 13 . 9 . 20–21 . California Department of Public Works . December 20, 2017 .
  38. News: Yerba Buena Tunnel Diggers Near Light . June 23, 1934 . Madera Tribune . December 20, 2017 .
  39. Governor Merriam Leads First Party Through Yerba Buena Pioneer Bore . August 1934 . California Highways and Public Works . 12 . 8 . 16–17 . California Department of Public Works . December 20, 2017 .
  40. News: Island shaft for Bay span is completed . United Press . July 25, 1934 . Healdsburg Tribune . December 21, 2017 .
  41. Construction History of San Francisco Bay Bridge . Andrew . Charles E. . February 1937 . California Highways and Public Works . 15 . 2 . 10–11, 20 . California Department of Public Works . December 20, 2017 .
  42. Bay Bridge to Have 16 Toll Stations All Located on the Oakland Approach . May 1935 . California Highways and Public Works . 13 . 5 . 12–13 . California Department of Public Works . December 20, 2017 . Far inside Yerba Buena, miners have bored ribs down from a crown tunnel to two side tunnels and placed 40 I-beams in these lateral drifts. For 20feet, steel lining has been placed on top of the I-beam ribs, and the space between these plates and the rock roof has been packed with broken rock. The work of concreteing this loose rock above the steel, all of which later will be encased in concrete, has just been started..
  43. Chief Engineer Purcell Tells Construction Story of the Bridge . Purcell . C.H. . November 1936 . California Highways and Public Works . 14 . 11 . 6–8 . California Department of Public Works . December 20, 2017 .
  44. Web site: Tunnel Section and Details, Yerba Buena Crossing, San Francisco-Oakland Bay Bridge, Sup. Drawing No. 19A . State of California, Dept. of Public Works . June 1934 . https://web.archive.org/web/20030418115859/http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/EastSpan/012024/MaterialsHandout/cd1/asbuilt/Yerba%20Buena%20Crossing%20(Contract%20No.%2004-5).pdf . dead . April 18, 2003.
  45. Web site: Facts - Bay Area . . 13 August 2024 . https://web.archive.org/web/19961018035750/http://www.dot.ca.gov/dist4/trivia.htm . 18 October 1996.
  46. News: Ready great fetes start bridge trips . November 10, 1936 . Madera Tribune . December 20, 2017 .
  47. News: Facts about the San Francisco-Oakland Bay Bridge . November 12, 1936 . Madera Tribune . December 20, 2017 . The Yerba Buena Island Tunnel, 65 feel wide by 52 feet high, through which a four-story building could be towed upright, is the largest diameter bore in the world. .
  48. http://www.dot.ca.gov/hq/esc/tollbridge/SFOBB/EastSpan/012024/MaterialsHandout/cd1/asbuilt/Yerba%20Buena%20Crossing%20%28Contract%20No.%2004-5%29.pdf State of California, Dept. of Public Works, Tunnel Section and Details, Yerba Buena Crossing, San Francisco-Oakland Bay Bridge, June 1934, Sup. Drawing No. 19A, PDF p.28
  49. Web site: San Francisco-Oakland Bay Bridge Lower Deck Eastbound Drive California. https://ghostarchive.org/varchive/youtube/20211113/f9Eo5-PpPVU. 2021-11-13 . live. kevinsyoza. July 3, 2010. YouTube.
  50. Web site: Two Bay Area Bridges . U.S. Department of Transportation . January 18, 2005 . June 13, 2008 . https://web.archive.org/web/20091011014705/http://www.fhwa.dot.gov/infrastructure/2bridges.htm . October 11, 2009 . live .
  51. Web site: Caltrans Facts/Information . . https://web.archive.org/web/20070407142058/http://www.dot.ca.gov/dist4/trivia.htm . April 7, 2007 . February 4, 2007.
  52. Web site: Commemoratives Classic Commemorative Silver and Gold (1936) San Francisco Oakland Bay Bridge Opening Coin Value Guide. whitman.com. 2018-12-18. December 18, 2018. https://web.archive.org/web/20181218193322/https://whitman.com/redbook/Coins/Detail/Commemoratives+Classic-Commemorative-Silver-and-Gold+1936-San-Francisco---Oakland-Bay-Bridge-Opening. dead.
  53. Savings of Over $9,000,000 Shown in San Francisco—Oakland Bridge Bids . April 1933 . California Highways and Public Works . 11 . 4 . 4, 15 . California Department of Public Works . December 20, 2017 .
  54. Huge Monolith Rises from Bay Waters to Bear Bridge Tower . December 1933 . California Highways and Public Works . 11 . 12 . 14–15 . California Department of Public Works . December 20, 2017 .
  55. Governor Rolph, Breaking Ground for Bay Bridge, Puts Hundreds to Work . Purcell . C.H. . July–August 1933 . California Highways and Public Works . 11 . 7–8 . 2–3;12–13;26 . California Department of Public Works . December 20, 2017 .
  56. News: Three fetes mark start of Bay Bridge . July 13, 1933 . Healdsburg Tribune, Enterprise and Scimitar . December 20, 2017 .
  57. President Expected to Assist in Bay Bridge Ceremony . May 1933 . California Highways and Public Works . 11 . 5 . 6 . California Department of Public Works . December 20, 2017 .
  58. 2019 Named Freeways, Highways, Structures and Other Appurtenances in California . . 2020 . California Department of Transportation . May 31, 2021 .
  59. https://archive.org/details/california193638highwacalirich/page/n608/mode/1up?view=theater California Highways and Public Works, December, 1937, p.23
  60. https://archive.org/details/california193638highwacalirich/page/n921/mode/2up?view=theater California Highways and Public Works, October, 1938, p.18-19
  61. Web site: Swenerton. Jeff. When Trains Ruled the East Bay. March 11, 2017. November 16, 2018. https://web.archive.org/web/20181116050248/http://www.oaklandmagazine.com/Oakland-Magazine/January-2008/When-Trains-Ruled-the-East-Bay/. dead.
  62. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1938_may.pdf "Building Bay Bridge Railroad", California Highways and Public Works, v.16 no.5, May, 1938, pp.8-11
  63. Red Trains in the East Bay, Robert Ford, Interurbans Special 65, 1977
  64. The Key Route, Harre Demoro, Interurbans Special 95, 1985, p.111
  65. The Emperor Norton Trust, "Emperor Norton's Bridge Proclamations".
  66. http://emperornortontrust.org/bridge/historical-efforts/1939 "A Plaque in 1939"
  67. Ford, Robert S. Red Trains in the East Bay (1977) Interurbans Publications p.258
  68. https://www.smdailyjournal.com/news/local/the-old-transbay-terminal-when-trains-came-first/article_6f56f1e6-bf99-11e8-a2d4-1f92575e34dc.html "The old Transbay Terminal: When trains came first", San Mateo Daily Journal online edition, September 24, 2018
  69. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1936_nov.pdf California Highways and Public Works, November, 1936, p.27
  70. http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1933_dec.pdf "'Great Fill and Wall for Bay Bridge Approach", California Highways and Public Works, Dec. 1933, p.13
  71. Yerba Buena Tunnel Bore Completed with Removal of all Core . December 1935 . California Highways and Public Works . 13 . 12 . 26–27 . California Department of Public Works . December 20, 2017 .
  72. Transbay Bridge Tunnel Unit to be World's Largest Cross-Section Bore . Purcell . C.H. . January 1932 . California Highways and Public Works . 10 . 1 . 6–7;17 . California Department of Public Works . December 20, 2017 .
  73. Bid Opening Set for Yerba Buena Tunnel . September–October 1960 . California Highways and Public Works . 39 . 9–10 . 40 . California Department of Public Works . December 20, 2017 . https://web.archive.org/web/20160826093718/http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1960_sepoct.pdf . August 26, 2016 . live .
  74. Bay Bridge: Second Phase of Reconstruction Nearing Completion . Raab, N.C. . January–February 1962 . California Highways and Public Works . 41 . 1–2 . 36–43 . California Department of Public Works . December 20, 2017 . https://web.archive.org/web/20171203082923/http://libraryarchives.metro.net/DPGTL/Californiahighways/chpw_1962_janfeb.pdf . December 3, 2017 . live .
  75. News: Commuters Learning to Live with Bay Bridge Tunnel Hump . United Press International . November 28, 1961 . Madera Tribune . December 20, 2017 .
  76. News: Bay Bridge Hump Work On . United Press International . December 28, 1961 . Madera Tribune . December 20, 2017 .
  77. News: Bay Bridge Hump Is Inspected By Works Director . Associated Press . December 27, 1961 . Santa Cruz Sentinel . December 20, 2017 .
  78. News: Bridge Has Been on This Road Before / Bay span's revamp was a mess in '60s . Nolte . Carl . February 5, 1996 . San Francisco Chronicle . December 21, 2017 .
  79. News: Cabanatuan . Michael . Cost of Bay Bridge Rail System Put at Up to $8 Billion in Study / Critics accuse planners of not taking transit proposal seriously . 21 December 2023 . San Francisco Gate . June 20, 2000.
  80. News: Jet Smashes Into Bay Span . Lodi News-Sentinel . United Press International . February 12, 1968 . 1.
  81. News: Bay Bridge rammed by Navy jet trainer . Associated Press . Spokane Daily Chronicle . February 12, 1968 . 2.
  82. Web site: The Battle of the Bay Bridge . Check-Six.com . 2002 . July 13, 2008 . https://web.archive.org/web/20101019173025/http://check-six.com/Crash_Sites/BayBridgeT33.htm . October 19, 2010 . live .
  83. News: East Span News . California Department of Transportation . May 2002 . July 13, 2008 . https://web.archive.org/web/20110525033601/http://www.dot.ca.gov/dist4/eastspans/spring02.html . May 25, 2011 . live .
  84. http://www.dot.ca.gov/hq/tsip/hseb/products/Named_Freeways_Final.pdf "Named Freeways, Highways, Structures and Other Appurtenances in California"
  85. Web site: Historic Earthquakes . United States Geological Survey . January 25, 2008 . July 13, 2008 . http://archive.wikiwix.com/cache/20080911050322/https://earthquake.usgs.gov/regional/states/events/1989_10_18.php . September 11, 2008 . dead .
  86. News: Security tightened at Calif. bridges after threat . November 2, 2001 . CNN.
  87. News: Terrorist alert at California bridges . Duncan . Campbell . November 2, 2001 . The Guardian.
  88. News: A NATION CHALLENGED: THE CALIFORNIA ALERT; Bay Area's Bridge-Wary Jam Ferries and Trains. November 6, 2001 . Evelyn . Nieves . .
  89. News: Bay Bridge Vulnerability Was Kept Secret . November 5, 2001 . . Dan. Stober.
  90. http://www.emperornortonbaybridge.com/uploads/9/0/8/8/9088913/norton_resolution_-_aaron_peskin_proposed_pdf.pdf Resolution in Support of the Emperor Norton Bridge
  91. News: Herel . Suzanne . Emperor Norton's name may yet span the bay . San Francisco Chronicle . A–1 . December 15, 2004 . July 12, 2008 . https://web.archive.org/web/20110604010007/http://www.sfgate.com/cgi-bin/article.cgi?file=/c/a/2004/12/15/MNGUMAC6LN1.DTL . June 4, 2011 . live .
  92. Book: Ali Khan . Mohiuddin . Accelerated Bridge Construction: Best Practices and Techniques . August 12, 2014 . Elsevier . 9780124072244 . 282 . 1 . September 24, 2014.
  93. Reno . Mark L. . Pohll . Martin . Seismic Retrofit of San Francisco–Oakland Bay Bridge West Crossing . Transportation Research Record . 1998 . 1624 . 1 . 73–81 . 10.3141/1624-09 . 110996417 . Paper 98-0809.
  94. Caltrans contract 04-0435U4, 1999–2004
  95. Web site: Bay Bridge fender repaired ahead of schedule. December 22, 2007.
  96. https://safety4sea.com/wp-content/uploads/2019/05/NTSB-Cosco-Busan-allision-November-2007.pdf
  97. https://www.oig.dhs.gov/sites/default/files/assets/Mgmt/OIG_08-38_Apr08.pdf
  98. https://www.dco.uscg.mil/Portals/9/DCO%20Documents/5p/CG-5PC/INV/docs/documents/Cosco.pdf
  99. 5 September 2009 to 7 September 2009
  100. News: Janet . DiGiacomo . Officials: Crack may keep Bay Bridge closed past Tuesday . CNN . San Francisco, California . September 6, 2009 . September 6, 2009 . https://web.archive.org/web/20100305092208/http://www.cnn.com/2009/US/09/06/california.bridge.closed/index.html . March 5, 2010 . live .
  101. News: Bay Bridge failure stirs fear, anger over new span . Dearen, Jason . Sudhin . Thanawala . October 28, 2009 . . . November 1, 2010 . https://archive.today/20101101160016/http://www.sfexaminer.com/local/ap/66787942.html . November 1, 2010 . dead .
  102. News: Emergency repair and detour connection completed on Bay Bridge. . September 8, 2009 . Bay Bridge Public Information Office . Press Release . November 1, 2009 . https://web.archive.org/web/20100612195139/http://baybridgeinfo.org/1/index.html . June 12, 2010 . dead .
  103. News: Bridge parts couldn't take the wind . Michael . Cabanatuan . Jaxon . Van Derbeken . Jill . Tucker . Carolyn . Jones . San Francisco Chronicle . October 29, 2009 . https://web.archive.org/web/20100204104529/http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2009/10/28/BA621ABP3G.DTL . February 4, 2010 . live .
  104. http://www.dot.ca.gov/dist4/sfobbeyebar/ Bay Bridge Closed for Eyebar Assessment and Repair
  105. http://twitpic.com/n7hv3 photograph of bridge damage by commuter directly behind it
  106. https://abc7news.com/archive/7086605/ Bay Bridge closed indefinitely
  107. News: Marshall . John . Tough commute likely after Bay Bridge rod snaps . Leff . Lisa . The Seattle Times . . October 28, 2009 . June 16, 2015.
  108. News: No estimate when Bay Bridge will open . San Francisco Chronicle . October 28, 2009 . Jason . Dearin . Sudhin . Thanawala . dead . https://web.archive.org/web/20091030133306/http://www.sfgate.com/cgi-bin/article.cgi?f=%2Fn%2Fa%2F2009%2F10%2F28%2Fnational%2Fa175859D54.DTL . October 30, 2009 .
  109. News: Bay Bridge closed after repair falls apart . Michael . Cabanatuan . Justin . Berton . October 28, 2009 . San Francisco Chronicle . https://web.archive.org/web/20101025152232/http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2009/10/28/MNO81ABJTF.DTL . October 25, 2010 . live .
  110. News: Bay Bridge will remain closed for 'a few days' . Los Angeles Times . October 28, 2009 . dead . https://web.archive.org/web/20091029222912/http://www.latimes.com/news/la-bay-bridge-mobile%2C0%2C7254922.story . October 29, 2009 .
  111. News: Bay Bridge stays closed . Carolyn . Jones . November 2, 2009 . San Francisco Chronicle . https://web.archive.org/web/20100206130927/http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2009/11/01/BAE11ADOBI.DTL . February 6, 2010 . live .
  112. News: Extra ferry, BART trains planned for morning commute . Denis . Cuff . Janis . Mara . Contra Costa Times . October 28, 2009 . https://web.archive.org/web/20110606122934/http://www.insidebayarea.com/news/ci_13656681 . June 6, 2011 . live .
  113. KSBW Action News Sunrise (5-7am), October 28, 2009
  114. California Legislature, 2013–14 Regular Session, Assembly Concurrent Resolution No. 65 – Relative to the Willie L. Brown, Jr. Bridge, June 12, 2013.
  115. Justin Slaughter, "Petition to name Bay Bridge after Emperor Norton gains 1,000 signatures", San Francisco Bay Guardian, August 13, 2013.
  116. http://www.EmperorNortonBridge.org EmperorNortonBridge.org
  117. Official California Legislative Information, "Documents associated with ACR 65", Legislative Counsel of California.
  118. Web site: Behold the Willie L. Brown Jr. Bridge . KQED News . October 4, 2014.
  119. Web site: Nader . M . Maroney . B . One-of-a-Kind Design: The New San Francisco Oakland Bay Bridge Eastern Span . STRUCTURE magazine . https://web.archive.org/web/20110728065546/http://www.structuremag.org/article.aspx?articleID=270 . July 28, 2011 . October 2007.
  120. Web site: BICYCLE AND PEDESTRIAN PATH Bay Bridge Info. baybridgeinfo.org. 2018-12-18. August 24, 2017. https://web.archive.org/web/20170824181334/http://baybridgeinfo.org/path. dead.
  121. News: Bay Bridge eastern span opens . Michael . Cabanatuan . September 13, 2013 . San Francisco Chronicle.
  122. News: Cabanatuan . Michael . Demolition crews start chipping away at old Bay Bridge . 14 September 2019 . San Francisco Chronicle . 28 January 2014.
  123. News: Demolition of Bay Bridge's old eastern span completed . 14 September 2019 . Bay City News Service . 11 November 2017.
  124. News: Long-Overshadowed Bay Bridge Will Go From Drab Gray to Glowing . The New York Times . Malia . Wollan . March 4, 2013.
  125. Web site: Egelko . Bob . Bay Bridge light show will go on . San Francisco Chronicle . May 7, 2015 . https://web.archive.org/web/20141231001830/http://www.sfgate.com/bayarea/article/Bay-Bridge-light-show-will-go-on-5964267.php . December 31, 2014 . December 17, 2014 . ... the nonprofit Illuminate the Arts announced Wednesday that it had raised the needed $4 million to reinstall the "Bay Lights" as a permanent fixture on the western end of the bridge..
  126. News: Bay Bridge light sculpture turns back on Saturday night . Denis . Cuff . January 28, 2016 . Contra Costa Times . January 30, 2016.
  127. http://thebaylights.org/ The Bay Lights
  128. http://latimesblogs.latimes.com/lanow/2013/03/bay-bridge-light-display-dazzles-san-francisco-.html Bay Bridge light display dazzles San Francisco
  129. News: Light installation on San Francisco's Bay Bridge shuts off . SF Gate . Sam . Mauhay-Moore . March 6, 2023.
  130. News: Bicycle Die-Hards Test Out Bay Bridge Bike Path. NBC News . September 3, 2013 . October 26, 2015.
  131. News: No longer the Bay Bridge Trail to nowhere. SFGate . October 23, 2016 . December 13, 2016.
  132. News: Bay Bridge bike path has new $2 million 'vista point;' will open seven days a week starting Tuesday. The Mercury News . April 29, 2017 . November 25, 2017.
  133. Web site: Bicycle and Pedestrian Path. California Department of Transportation. November 25, 2017. August 24, 2017. https://web.archive.org/web/20170824181334/http://baybridgeinfo.org/path. dead.
  134. Web site: Old Bay Bridge Demolition. California Department of Transportation . November 25, 2017.
  135. News: New Bay Bridge corrosion probe: Concrete chunk falls in tunnel . Van Derbeken . Jaxon . February 6, 2016 . San Francisco Chronicle . December 21, 2017 .
  136. News: More damage found to concrete wall in Bay Bridge tunnel . Van Derbeken . Jaxon . February 21, 2016 . San Francisco Chronicle . December 21, 2017 .
  137. News: Daytime lane closures for Bay Bridge tunnel repairs . Cabanatuan . Michael . March 19, 2017 . San Francisco Chronicle . December 21, 2017 .
  138. News: Bay Area transit agencies push for bus-only lane on Bay Bridge . KTVU . January 18, 2020.
  139. Web site: Swan . Rachel . 2020-01-13 . Adding a bus-only lane on the Bay Bridge: The idea seems simple. Except it’s not . 2023-11-21 . San Francisco Chronicle . en.
  140. News: Lawmaker introduces legislation to kick off creation of Bay Bridge bus lane . San Francisco Examiner . February 21, 2020 . Joe Fitzgerald Rodriguez.
  141. Web site: 2020-10-18. Oakland's new Sutter Regional Shoreline park now open. 2020-10-31. East Bay Times. en-US.
  142. Web site: New Bay Bridge on-off ramps to Treasure Island now open. ABC 7 News San Francisco Oakland San Jose. October 22, 2016. ABC 7 News. October 26, 2017.
  143. Web site: The Bay Bridge Is Getting a New Yerba Buena Island Off-Ramp, Opening On Sunday. sfist.com. May 4, 2023. May 10, 2023. May 9, 2023. https://web.archive.org/web/20230509040709/https://sfist.com/2023/05/04/the-bay-bridge-is-getting-a-new-yerba-buena-island-off-ramp-opening-on-sunday/. dead.
  144. Web site: Will new Bay Bridge off-ramp to Yerba Buena help reduce traffic?. San Francisco Chronicle. May 4, 2023.
  145. Web site: 2023-11-16 . Around 80 protesters arrested after abandoning cars, blocking westbound Bay Bridge, CHP says . 2023-11-17 . ABC7 San Francisco . en.
  146. Web site: 2023-11-17 . Eastbound lanes of Bay Bridge temporarily shut down due to accident . 2023-11-17 . KRON4 . en-US.
  147. Web site: Bay Bridge Accident news - Today’s latest updates - CBS San Francisco . 2023-11-17 . www.cbsnews.com . en-US.
  148. Web site: 2023-11-24 . Pro-Palestinian protesters gather across San Francisco Bay Area for Black Friday demonstrations - CBS San Francisco . 2023-11-25 . www.cbsnews.com . en-US.
  149. Web site: San Francisco–Oakland Bay Bridge. www.bayareafastrak.org. CalTrans. July 10, 2022.
  150. [C.H. Garrigues]
  151. https://www.newspapers.com/image/37991052/?terms=bay%2Bbridge%2Btoll%2Bdirection "One-Way Tolls to Start Monday on All Bridges," The Argus, Fremont, California, August 29, 1969, image 5
  152. News: History of California's bridge tolls. . (archive) . 2010 . November 4, 2021.
  153. News: Singing those Golden Gate Blues . Los Angeles Times . Elliott . Christopher . May 7, 1991 . November 4, 2021.
  154. http://bata.mtc.ca.gov/projects/rm1.htm Regional Measure 1 Toll Bridge Program
  155. News: John . Dutra . AB 1171 Assembly Bill – Chaptered . October 14, 2001 . . August 7, 2008 . https://web.archive.org/web/20120315184435/http://www.leginfo.ca.gov/pub/01-02/bill/asm/ab_1151-1200/ab_1171_bill_20011014_chaptered.html . March 15, 2012 . live .
  156. Web site: About MTC . Metropolitan Transportation Commission . October 15, 2009 . October 15, 2009 . https://web.archive.org/web/20101103124604/http://www.mtc.ca.gov/about_mtc/about.htm . November 3, 2010 . live .
  157. Web site: Frequently Asked Toll Questions . Bay Area Toll Authority . June 1, 2010 . June 29, 2010 . https://web.archive.org/web/20101122040153/http://www.mtc.ca.gov/tolls/faq.htm#2 . November 22, 2010 . live .
  158. Web site: Toll Increase Information . Bay Area Toll Authority . June 1, 2010 . June 29, 2010 . https://web.archive.org/web/20101023033518/http://www.mtc.ca.gov/tolls/ . October 23, 2010 . live .
  159. News: Reminder: Bridge tolls go up July 1 . . Michael . Cabanatuan . May 13, 2010 . January 21, 2011.
  160. News: Conflicting findings on Bay Bridge congestion toll . . Michael . Cabanatuan . January 12, 2011 . January 21, 2011.
  161. Web site: Bay Bridge Traffic Decreases After Congestion Pricing . CBS News San Francisco . January 12, 2011 . January 21, 2011.
  162. Web site: Toll Increase Information: Multi-Axle Vehicles . Bay Area Toll Authority . July 1, 2012 . December 29, 2013 . dead . https://web.archive.org/web/20131230234900/http://www.mtc.ca.gov/tolls/multi-axle.htm . December 30, 2013 .
  163. News: Regional Measure 3: Work on transportation improvements could start next year . Michael . Cabanatuan . SFGate.com . June 6, 2018.
  164. News: Bay Area bridge tolls to increase one dollar in January, except Golden Gate . Christien . Kafton . KTVU . November 28, 2018.
  165. Tolls on Seven Bay Area Bridges Set to Rise Next Month . Metropolitan Transportation Commission . December 11, 2018 . December 16, 2018.
  166. News: Do you drive to the Bay Area? A big change is coming to toll booths at the bridges . subscription . https://web.archive.org/web/20190917020535/https://www.sacbee.com/news/california/article234765937.html . September 17, 2019 . Darrell . Smith . . September 7, 2019 . April 12, 2020.
  167. Web site: Cash Toll Collection Suspended at Bay Area Bridges. March 20, 2020. Metropolitan Transportation Commission. en. March 20, 2020.
  168. Web site: New Year Brings New Toll Collection System to Bay Area Bridges. December 28, 2020. Metropolitan Transportation Commission. en. December 28, 2020.
  169. News: Cabanatuan . Michael . Bay Area toll collectors are gone, so what happens to the tollbooths? Here's the $77 million answer . subscription . https://web.archive.org/web/20220614105405/https://www.sfchronicle.com/bayarea/article/Bay-Area-toll-collectors-vanished-when-COVID-hit-17068234.php?ipid=amp-related-link . 14 June 2022 . . 12 April 2022 . 10 April 2022.