Other Name: | M1 East (planned name) Line 1 East Line BT |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | Operational |
Locale: | Tongzhou and Chaoyang districts Beijing |
Stations: | 15 |
Ridership2: | 300,600 (2014 Avg.)[1] 364,800 (2014 Peak) |
Operator: | Beijing Mass Transit Railway Operation Corporation Limited |
Character: | Elevated, at-grade, underground |
Depot: | Sihui, Tuqiao[2] |
Stock: | 6-car Type B (SFM01, SFM02, SFM07, BDK06) |
Linelength: | 23.4km (14.5miles)[3] |
Electrification: | Third rail 750 V DC |
Map State: | collapsed |
The Batong Line[4] of the Beijing Subway is an east–west rapid transit line in eastern Beijing. It extends Line 1 further east from in Chaoyang District to in Tongzhou District. Through operation with Line 1 started on August 29, 2021.
The Batong Line derives its name by combining the first character of Bawangfen (Chinese: 八王坟), another name for Sihui, and Tongzhou (Chinese: 通州), the eastern suburban district of Beijing which the line serves.
The Batong Line is mainly above ground with only section is underground[5] and runs 23.4km (14.5miles) from the in the west to in the east. The color of the Batong Line that is shown on maps, like that of Line 1, is
dark red.The line tends to be very crowded during rush hour. To alleviate this headways were reduced and express services were introduced during rush hour in early 2020. However, these express services were removed with the start of through operation with Line 1 in mid 2021.
The first east-bound train departs Sihui at 6:00am. The first west-bound train departs Huazhuang at 5:16am. The last east-bound train leaves Sihui at 11:40pm. The last west-bound train leaves Huazhuang at 10:56pm.[6] [7]
The Batong Line follows the Beijing-Tongzhou Expressway eastward from Sihui to Guǎnzhuang. Between Gaobeidian and Guǎnzhuang, the Batong Line and its stations are built into the highway's median. At Bali Qiao, the Batong Line turns to the southeast and follows the Jingtang Road to Tu Qiao, which is located just inside the Tuqiao Bridge exit on the eastern 6th Ring Road. From there, the line turns and follows the 6th Ring Road south and west to and .
Station list for Line 1 and Batong line of Beijing Subway, after the through operation started on August 29, 2021.
See main article: Beijing Subway rolling stock.
The line uses 6-car Type B rolling stock.
Model | Image | Manufacturer | Year Built | Year Refurbished | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|---|
SFM01 | CRRC Qingdao Sifang Beijing Subway Rolling Stock Equipment | 2003 | 2015–2019 | 18 | TQ401–TQ408 (01 071–01 078), TQ415–TQ424 (01 085–01 094) | Tuqiao | |
SFM02 | CRRC Qingdao Sifang | 2018 | 6 | TQ409–TQ414 (01 079–01 084) | |||
SFM07 | Beijing Subway Rolling Stock Equipment | 2019 | 6 | TQ425–TQ430 (01 095–01 100) | |||
BDK06 | Beijing Subway Rolling Stock Equipment | 2019 | Never | 12 | TQ431–TQ437 (01 101–01 107), 01 108–01 112 |
Model | Manufacturer | Year Built | Year Retired | Number Made | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
DK3 | CRRC Changchun Railway Vehicles | 1971 | 2005 | 14 | TQ101–TQ114 | Tuqiao |
DK16 | 1986 | 2003 | 4 | TQ115–TQ118 |
Construction of the Batong Line began on December 28, 2001, and the line opened on December 27, 2003.
In 2012, traffic on Batong Line was relieved by the opening of the parallel Line 6, with a 12.14% decrease in daily ridership and a 10–20% reduction in flow during rush hour.[8] However, during peak hours sections the line still operates above 100% capacity.[8]
There are 2 stations on the southern extension: station and station (both are transfer stations with the eastern extension of Line 7).[9] The extension is 4.5 km in length,[10] including 3.8 km underground section.[11] station was opened on December 28, 2019. station opened on August 26, 2021.[12]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Sihui — Tuqiao | 27 December 2003 | 18.9641NaN1[13] | 13 | Phase 1 |
Tuqiao — Huazhuang | 28 December 2019[14] | 4.5km (02.8miles) | 1 | Phase 2 (Southern extension) |
Huazhuang — Universal Resort | 26 August 2021 | 1 |
In 2010, a CPPCC member Chen Dingwang, proposed that services on Line 1 and the Batong Line should directly link, with through operations, reducing travel times and removing the unnecessary forced transfers at or .[15] However, the Beijing Subway responded that Line 1's and Batong's signal systems are completely different, so through-operation will be more difficult to achieve from an engineering standpoint. As of 2016, preliminary design and feasibility studies are underway to allow for through operations between Line 1 and Batong.[16] On June 12, 2020, the project of the through operation of Line 1 and Batong line was approved by Beijing Development and Reform Commission.[17] Through operation with Line 1 started on 29 August 2021.[18]