Batang–Semarang Toll Road Explained
Country: | IDN |
Batang-Semarang Toll Road |
Type: | Toll |
Maint: | PT Jasamarga Semarang Batang
|
Length Km: | 75 |
Image Notes: | Kalikuto Bridge on Batang–Semarang Toll Road |
Formed: | 2018 |
Direction A: | West |
Terminus A: | Batang |
Direction B: | East |
Terminus B: | Semarang |
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Sections
Until November 2017, its construction progress is at 55.7 percent.[3] [4] The construction of this toll road is divided into 5 sections:
- Section I, beginning of project - East Batang (3.2 km)
- Section II, East Batang - Weleri (36.35 km)
- Section III, Weleri - Kendal (11.05 km)
- Section IV, Kendal - Kaliwungu (13.5 km)
- Section V, Kaliwungu - Krapyak (10.9 km)
Exits and Gates
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Notes and References
- http://properti.kompas.com/read/2016/03/23/191811421/Inilah.Pemenang.Lelang.Jalan.Tol.Batang-Semarang Inilah Pemenang Lelang Jalan Tol Batang-Semarang
- Web site: Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018. 23 December 2017.
- Web site: Jalan Tol Batang - Semarang Selesai Akhir 2018. 23 December 2017. 17 April 2018. https://web.archive.org/web/20180417232543/http://industri.bisnis.com/read/20171106/45/706660/jalan-tol-batang-semarang-selesai-akhir-2018. dead.
- Web site: Batang and Balikpapan toll road projects accelerated. 23 December 2017. 23 December 2017. https://web.archive.org/web/20171223220411/https://www.pwc.com/id/en/media-centre/infrastructure-news/september-2017/batang-and-balikpapan-toll-road-projects-accelerated.html. dead.