Sealdah–Bangaon line explained

Box Width:28em
Sealdah–Bangaon line
Type:Commuter rail
System:Kolkata Suburban Railway
Status:Operational
Locale:West Bengal
Stations:52
Routes:

Owner:Indian Railways
Operator:Eastern Railway
Character:At grade
Depot:Barasat EMU Car Shed
Ranaghat EMU Car Shed
Linelength:Sealdah–Bangaon: 780NaN0
Barasat–Hasnabad: 490NaN0
Ranaghat–Bangaon: 280NaN0
Tracks:2
Gauge: broad gauge
Old Gauge:Barasat–Basirhat Light Railway narrow gauge
Electrification:25 kV overhead line
Speed:up to 100 km per hour
Map State:collapsed

The Sealdah–Bangaon line is a 78km (48miles) long broad gauge railway line that connects the Sealdah Main and North terminus of Kolkata with Bangaon of North 24 Parganas district of West Bengal, India. Once a part of the old CalcuttaJessoreKhulna line, today it is a busy suburban section of the Kolkata Suburban Railway's Sealdah North section. It is under the jurisdiction of the Sealdah railway division of the Eastern Railway zone of the Indian Railways.[1] [2]

The line has two branch lines. The 53km (33miles) long Barasat–Hasnabad branch line provides connectivity to much of the Basirhat subdivision of the North 24 Parganas district while the 28km (17miles) long Ranaghat–Bangaon branch line connects this line with the Ranaghat Junction on the Sealdah–Ranaghat section.[1]

Services

The line was a part of the old Calcutta–Jessore–Khulna line with trains such as the Barisal Express running through it. Today however it is primarily a suburban section with a total of 138 daily and 112 Sunday EMU services serving the Sealdah–Bangaon section.[3] A further 31 EMU services between Bangaon and Ranaghat junctions, and 2 EMU services, between Bangaon and Shantipur junctions, run via the Ranaghat–Bangaon branch line. The Barasat–Hasnabad branch line is served by a total of 46 daily and 38 Sunday EMU services. Majority of the services are provided by 9-car and 12-car EMU rakes from the Barasat EMU Carshed.[4] Few services in the Ranaghat–Bangaon line are provided by 12-car EMU rakes from the Ranaghat EMU Carshed as well.

Petrapole railway station serves as a major international transit point for freight and, recently, passengers to Bangladesh with the Benapole railway station serving as its Bangladeshi counterpart.[5] [6] The Benapole land port, the largest land port of Bangladesh, is directly served by this line along with the roadways at the Benapole Border Crossing and accounts for more than 90% of the imported Indian goods into Bangladesh.[7] [8] Major freight commodities handled by this section are foodgrains, fuel, medical oxygen, stone and gypsum amongst others.

On 9 November 2017, a bi-weekly international service from Kolkata to Khulna called the Bandhan Express was started by the Indian and Bangladeshi governments.[9] The train initially had stoppages only at Kolkata, Petrapole, Benapole and Khulna with Petrapole and Benapole serving as border checkpoints. However, due to popular demand a new three minute stoppage was added at Jessore Junction railway station on 7 March 2019.[10]

The line has a major interchange station at Dum Dum for the Line 1 of the Kolkata Metro and the Sealdah Main and North section.[11] Completion of construction and opening of the Line 4 of Kolkata Metro is expected provide four more interchange stations at Dum Dum Cantonment, Madhyamgram, Hridaypur and Barasat Junction.[12] [13] [14]

History

Pre-partition (1882-1947)

Bengal Central Railway

The Bengal Central Railway company was formed in 1881 to build and operate a broad gauge railway line from Sealdah to Khulna via Jessore with a branch from Bangaon to Ranaghat.[15] [16]

It constructed the two broad gauge lines: one connecting Ranaghat and Bangaon (21miles) in 1882 and the other connecting Dum Dum with Khulna (now in Bangladesh), via Bangaon (108miles) which opened in stages and was completed in 1884. These lines were merged with Eastern Bengal Railway in 1904.

Eastern Bengal Railway

With the takeover of BCR, the Calcutta–Bangaon–Jessore–Khulna line became the main line of the Central section of Eastern Bengal Railway .[17] [18] The Patipukur Loop line from Dum Dum Cantonment to Patipukur was opened on 1904 as well. In 1942, EBR was merged with the Assam Bengal Railway to form the Bengal and Assam Railway .[1]

Barasat–Basirhat Light Railway

The Barasat–Basirhat Light Railway was a 26miles long narrow gauge railway that was constructed by the Martin's Light Railways company in 1905 between Barasat and Basirhat. It was further extended via Taki to Hasnabad (Chingrighata) in 1909. A 16.62miles long extension was built from Beliaghata Bridge on the Barasat–Basirhat line to Patipukur in 1910. This was further extended to Belgachia in 1914 and was known as the Shyambazar Branch.[19]

Post-partition (1947-)

Eastern Railway

See also: Eastern Railway zone. Following the partition of India in 1947, the Calcutta–Khulna line was divided into two parts and the Petrapole railway station became the terminus on the Indian side while the Benapole railway station became the terminus in the Bangladeshi side of the line. The Calcutta (now Sealdah)–Bangaon–Petrapole section came under the jurisdiction of the Sealdah division of the Eastern Railway zone of the Indian Railways while the Benapole–Jessore–Khulna section came under the jurisdiction of the Eastern Bengal Railway (renamed as Pakistan Eastern Railway on 1961[20]) of the then East Pakistan.[21]

The Barisal Express, launched in 1884, from Calcutta to Khulna continued post-partition until rail services between the two countries were suspended due to the Indo-Pakistani War of 1965. Following the liberation of Bangladesh, freight services between the two countries were restored for a brief period of two years in 1972 but closed again due to a lack of goods.[22] India and Bangladesh signed an agreement in July 2000 to resume freight services and the first freight train ran across the link on 21 January 2001. The Bandhan Express, a weekly service, was introduced on this line in November 2017. It traces the old route of the Barisal Express except for having its terminus in the Kolkata railway station instead of Sealdah railway station.[23]

The Barasat–Basirhat Light Railway closed down in 1955 due to continuous losses.[24] The Barasat-Hasnabad section of the BBLR was converted into a broad gauge and was built in a new alignment between 1957 and 1962 becoming the Barasat–Hasnabad branch line. The Shyambazar branch of the BBLR was abandoned.[25] [26]

The Dum Dum Cantonment–Biman Bandar branch line was built by the Eastern Railway and was inaugurated in July 2006. Due to losses and poor patronage owing to the location of the station and odd timings of the services, the services on the line were closed down in 2016. The line was further dismantled in 2020 to make way for the Line 4 of the Kolkata Metro.[27]

Numbering series details

There are some pattern in numbering in local trains of Sealdah Bangaon section.

Tracks and Electrification

The Sealdah–Barasat–Bangaon section is a double line section whereas the Ranaghat–Bangaon–Petrapole–Benapole section is a single line section. In the Barasat–Hasnabad branch line, the Barasat–Sondalia and Lebutala–Champapukur sections are double lined whereas the Champapukur–Hasnabad section is a single line section. The doubling of the Sondalia–Lebutala section of the line is currently under progress.[28]

All the lines in the section are fully electrified with 25 kV AC overhead system. The Sealdah–Bangaon line was electrified in 1963–64, while the Barasat–Hasnabad branch line was electrified in 2002-03 [29]

EMU Car shed

The lines are primarily served by 9-car and 12-car EMU rakes from the Barasat EMU Carshed. Few services in the Ranaghat–Bangaon line are provided by 12-car EMU rakes from the Ranaghat EMU Carshed as well.

While the section was initially served by the Narkeldanga EMU carshed which opened on 1963, due to the increasing traffic requirements in the Sealdah–Bangaon section and the electrified Barasat–Hasnabad and Ranaghat–Bangaon sections led to the commissioning of the Barasat EMU Carshed in 1990. In 2018, three phase IGBT based 12-car EMU rakes were introduced in this carshed. As of January 2022, the shed contains 8 9-car EMU rakes and 25 12-car EMU rakes, 6 of which are three phase IGBT based.

Similar increase in traffic requirements in the Ranaghat–Gede, Ranaghat–Bangaon, Ranaghat–Shantipur–Krishnanagar City and Ranaghat–Lalgola sections led to the commissioning of the Ranaghat EMU carshed in 2007. As of January 2022, the car shed contains 15 12-car EMU rakes and 6 MEMU rakes of which one is an 8-car rake while the rest are 12-car rakes. Three of the 12-car MEMU rakes are three phase IGBT based rakes.

Nowadays, 3 phase emu is running on tracks. Narkeldanga EMU Carshed has 2 nos 12Car 3phase Alstom rakes and RHA has 5 rakes and BT has 10 nos of 3 phase rakes which are in service in this line. In BNJ, 6 rakes are night stabled and other trains shed in their respective Carshed.

Routes and stations

Stations

Names in bold indicate that the station is a major stop or an important interchange/terminal station.

Sealdah–Barasat–Bangaon line

Sealdah–Barasat–Bangaon line
Distance from Sealdah Main and North (km)Station NameStation CodeConnectionsStation Category[30]
10SDAHSealdah South sectionNSG-1
22Kankurgachi Road JunctionKGKCircular lineHG-3
35BNXRSG-2
48DDJSealdah–Ranaghat–Gede line /Calcutta Chord link line / Kolkata Metro Line 1 (Dum Dum metro station)SG-2
511DDCSG-3
613DGNRSG-3
714BBTSG-3
816BRPKSG-3
917NBESG-3
1019MMGKolkata Metro Line 4 (Madhyamgram metro station)SG-2
1121HHRKolkata Metro Line 4 (Hridaypur metro station)SG-3
1223BTBarasat–Hasnabad branch line /Kolkata Metro Line 4 (Barasat metro station)SG-2
1327BMGSG-3
1431DTKSG-3
1535BIRASG-3
1638GUMASG-3
1742ASKRSG-3
1845HBSG-2
1950SNHTHG-3
2055MSLSG-3
2158GBGSG-3
2264TKNRSG-3
2368CDPSG-3
2473BNAAHG-3
2578BNJRanaghat–Bangaon branch lineSG-3
↑↓ International passenger or freight traffic only
2682PTPLPetrapole Land PortHG-3

Barasat–Hasnabad branch line

Barasat–Hasnabad branch line
Distance from Barasat Junction (km)Station NameStation CodeConnectionsStation Category[31]
10BTSealdah–Barasat–Bangaon line /Kolkata Metro Line 4 (Barasat metro station)SG-2
23KZPRHG-3
36KBGHHG-3
410BHKAHG-3
512SXCSG-3
615BGRDHG-3
718LBTLHG-3
820BSLASG-3
923HROSG-3
1027KMZAHG-3
1131MPESG-3
1233GGVHG-3
1336CQRSG-3
1441BBLAHG-3
1542BSHTSG-3
1645MNAPHG-3
1747MPNHG-3
1848NMDRHG-3
1951TKFSG-3
2053HNBSG-3

Ranaghat–Bangaon branch line

Ranaghat–Bangaon branch line
Distance from Ranaghat Junction (km)Station NameStation CodeConnectionsStation Category
10BTSealdah–Ranaghat–Gede line / Ranaghat–Krishnanagar City–Lalgola lineSG-2
23CPHTHG-3
35NBRNHG-3
410GGPSG-3
515MAJSG-3
618AKIPHG-3
718GNSG-3
823STBBHG-3
928BNJSealdah–Bangaon branch lineSG-3
↑↓ International passenger or freight traffic only
1032PTPLPetrapole Land PortHG-3

Planned extensions

The Machhalandapur–Swarupnagar, Bira–Chakla, Bangaon–Chandabazar–Bagdah, Bangaon–Poramaheshtala and HasnabadHingalganj new lines were sanctioned in the railway budgets between 2009 and 2012 under the tenure of Mamata Banerjee as the railway minister. None of the projects however could be started because of non-availability of land and hence the work has been kept under abeyance by the Railway Board.[32] [33] [34]

In popular culture

The name and the setting of the Bengali social drama film, is based on the daily suburban EMU local which leaves the Sealdah station for Bangaon Junction at 8:08 a.m. IST.

Notes and References

  1. http://www.er.indianrailways.gov.in/view_section.jsp?lang=0&id=0,6,442,452 Brief Detail of Sealdah Division
  2. Web site: Sealdah Division System Map . 11 November 2021.
  3. Web site: Details of Operating Department: Sealdah Division, Eastern Railway . 30 November 2021.
  4. Web site: Highlights of TRS Organisation, Sealdah division, Eastern Railway . 30 November 2021.
  5. Web site: Dhaka looks to unlock export potential thru' rail . 23 January 2022 . The Business Standard. 27 December 2021 .
  6. Web site: Bangladesh Railway earns record revenue carrying freight at India-Bangladesh interchange points . 23 January 2022 . NewsOnAIR.
  7. Web site: Procurement Details . 28 June 2020 . World Bank . en.
  8. News: Bose . Pratim Ranjan . Law . Abhishek . 12 March 2018 . Customs wants better rail link thru Petrapole . The Hindu Business Line . 8 February 2018.
  9. Prime Minister of India & Prime Minister of Bangladesh Jointly along with Chief Minister, West Bengal Flag off New Cross-Border Train between India & Bangladesh, "Kolkata–Khulna Bandhan Express"... . Press Information Bureau, Ministry of Railways . 9 November 2017 . 10 November 2017 .
  10. News: bn:৫৪ বছর পরে যশোর থেকে কলকাতার ট্রেন . bn . Anandabazar Patrika . https://www.anandabazar.com/bangladesh-news/train-service-from-jessore-to-kolkata-started-after-54-years-1.963238 . 15 March 2019.
  11. Web site: SEALDAH DIVISION – AN OVERVIEW . 1 December 2021 . Eastern Railway.
  12. News: Ajanta . Chakraborty . 3 February 2022 . Kolkata metro gets Rs 2,316 crore, Rs 53 crore up from last year . 2022-02-28 . The Times of India . en.
  13. News: Jayanta . Gupta . 24 March 2017 . Metro plans Madhyamgram link . 2022-02-28 . The Times of India . en.
  14. Web site: Airport-Barasat metro line back to life . 2022-02-28 . www.telegraphindia.com.
  15. Minutes of preliminary proceedings, IOR/L/AG/46/4/1, Records of the Bengal Central Railway Company, India Office Records and Private Papers, 1881, British Library
  16. Book: Sweeney, Stuart . Financing India's Imperial Railways, 1875–1914 . 2015-10-06 . Routledge . 978-1-317-32376-1 . en.
  17. Web site: Administration Report on Railways 1918 . 28 November 2021.
  18. Web site: History Of Indian Railways, constructed and in progress', 31 March 1937 by 'The Government of India - Railway Department' . 28 November 2021.
  19. Web site: " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 212 . 5 October 2021.
  20. Rao, M.A. (1988). Indian Railways, New Delhi: National Book Trust, p.39
  21. Web site: Thapliyal, Sangeeta. "India-Bangladesh Transportation Links: A Move for Closer Cooperation". Institute for Defence Studies and Analyses . 5 October 2021.
  22. Web site: India, Bangladesh reintroduce rail link . . 5 October 2021.
  23. Web site: Prime Minister of India & Prime Minister of Bangladesh Jointly along with Chief Minister, West Bengal Flag off New Cross-Border Train between India & Bangladesh, "Kolkata-Khulna Bandhan Express" from Kolkata through Video Confencing. Two Rail Bridges in Bangladesh and International Rail Passenger Terminus at Kolkata Station also Inaugurated . 5 October 2021.
  24. Web site: The Chronology of Railway development in Eastern Indian . dead . https://web.archive.org/web/20080316015721/http://www.irfca.org/~mrinal/chronology.html . 16 March 2008 . 2012-02-10 . railindia . dmy-all.
  25. Book: Moonis Raza & Yash Aggarwal . Transport Geography of India: Commodity Flow and the Regional Structure of Indian Economy . page 60 . Concept Publishing Company, A-15/16 Commercial Block, Mohan Garden, New Delhi – 110059 . 1986 . 81-7022-089-0 . 2 May 2013.
  26. Web site: Non-IR Railways in India . 2012-02-10 . IRFCA.
  27. Web site: Defunct Circular Rail track dismantled. The Times of India. 5 October 2021.
  28. Web site: ONGOING PROJECTS ON NEW LINES, GAUGE CONVERSION AND DOUBLING . 28 January 2022 . Indian Express.
  29. Web site: History of Electrification . 4 May 2013 . IRFCA.
  30. Web site: Category of stations - Eastern Railway . 24 December 2021.
  31. Web site: Category of stations - Eastern Railway . 24 December 2021.
  32. Web site: ONGOING PROJECTS ON NEW LINES, GAUGE CONVERSION AND DOUBLING . 28 January 2022 . Indian Express.
  33. Web site: Project Summary . 2022-03-03 . www.cspm.gov.in.
  34. Web site: Nusrat Jahan demands railway line extension in her constituency, says it will boost tourism, livelihood . 2022-03-03 . ANI News . en.