Baoshan Second Dam Explained

Baoshan Second Dam
Name Official:寶山第二水庫
Location Map:Hsinchu County
Location Map Size:225px
Coordinates:24.7258°N 121.0509°W
Location:Baoshan, Hsinchu County, Taiwan
Status:O
Dam Type:E
Dam Height Foundation:58 m
Dam Length:350 m
Dam Volume:2,052,000 m3
Spillway Type:free overflow
Res Capacity Total:31,900,000 m3
Res Capacity Active:31,340,000 m3
Res Catchment:2.88 km2
Res Surface:1.93 km2
Res Max Depth:151.73 m

The Baoshan Second Dam is a dam in Baoshan Township, Hsinchu County, Taiwan.

History

In 1986, the planning team of Water Resources Bureau of the Taiwan Provincial Government conducted preliminary study for a dam exploration to alleviate water scarcity problem in Hsinchu County in the future. In 1989, the initial planning to construct the dam began and the feasibility study started in 1993. In 1995, the Project Plan for the Second Baoshan Reservoir in Hsinchu County was proposed. The construction began in April1997 and completed in June2006.[1] In 2020, the government announced that it would increase the height of the dam to increase the total water supply of Taiwan.[2]

Technical specifications

The dam is an embankment type of dam. It spans over 58meters high, 350 meters long with a volume of 2,052,000m3. It produces a reservoir with a catchment area of 2.88km2, full water level area of 1.93km2 and a maximum depth of 151.73meters. It has a total capacity of 31,900,000m3 with effective capacity of 31,340,000m3.[1]

See also

Notes and References

  1. Web site: Important Achievements In The Past - Second Baoshan Reservoir. Water Resources Planning Institute. 11 June 2021.
  2. Web site: Chang. Eric. 30 November 2020. Taiwan government considers building new reservoirs. Taiwan News. 11 June 2021.