BRUA pipeline
Type:natural gas
Country:Romania
Operator:Transgaz
Partners:Transgaz
Length Km:479
Discharge:4.4 billion cubic meters (0.15 Tcf) per year
Diameter In:32
Direction:east–west
Start:Podișor, Giurgiu County
Finish:Recaș, Timiș County
Expected:2019
Through:Romania

The BRUA pipeline is a natural gas pipeline from Podișor, Giurgiu County to Recaș, Timiș County part of the future Bulgaria, Romania, Hungary and Austria gas interconnector. The pipeline attempts to lessen the country's dependence on Russian energy and provide a new export route for the future natural gas exploitation in the Black Sea. The BRUA pipeline will be eventually linked to the Giurgiu–Ruse and the Arad–Szeged pipelines.[1]

Preparations for the project started in 2016, the financing agreements were signed in 2017 and the actual construction phase kicked off in the first quarter of 2018. The project is developed by Transgaz, the technical operator of the national natural gas transmission system in Romania. The first phase of the pipeline was completed in 2020 at a cost of €423 million[2] and the pipeline is operational since June 2023[3]

History

The agreement for the construction of the BRUA pipeline was signed on November 28, 2017, at a total cost of €479 million. Financing for the first phase is provided by a European Commission grant of €180 million, a €50 million European Investment Bank loan and a European Bank for Reconstruction and Development loan of €60 million. The pipeline is supposed to be inaugurated in two phases in 2019 and 2022.[4] [5]

Technical description

The length of the pipeline will be 479km (298miles) and the construction will start on three different sections in early 2018. The general contractor of the first two sections is the Austrian company Habau and the third section is contracted by the Romanian company INSPET. The 32inches BRUA pipeline will cross 79 administrative units in 11 counties, and will include new gas compressor stations at Podișor, Bibești and Jupa and the final transport capacity will be 4.4 billion cubic meter (bcm) of natural gas per annum.[6] The total cost of the pipeline is around €479 million.[7]

Notes and References

  1. News: UPDATE 1-Gas pipeline through central Europe to go ahead as planned -Romania. 28 September 2017. January 21, 2018 . Reuters.
  2. Web site: UPDATE BRUA Gas Pipeline.
  3. News: Romania's Transgaz begins works at EUR 500 mln BRUA-Black Sea pipeline . Iulian Ernst . Romania-insider . 2023-06-19.
  4. Web site: BRUA Pipeline To Proceed Despite Recent Setback. January 21, 2018 . Newsbase. live. https://web.archive.org/web/20180122072138/https://newsbase.com/topstories/brua-pipeline-proceed-despite-recent-setback . 2018-01-22 .
  5. Web site: Transgaz obtine 60 milioane euro de la BERD pentru gazoductul BRUA. February 24, 2018 . Wall Street Journal Romania. live. https://web.archive.org/web/20180224110600/https://www.wall-street.ro/articol/Companii/218431/transgaz-obtine-60-milioane-euro-de-la-berd-pentru-gazoductul-brua.html . 2018-02-24 .
  6. Web site: BRUA Pipeline. January 21, 2018 . EBRD.
  7. Web site: Transgaz a semnat conctractele pentru gazoductul BRUA. Unul dintre câştigători a fost amendat în 2012 pentru trucarea unei licitaţii a operatorului de transport. January 21, 2018 . Adevarul.