B (New York City Subway service) explained

Service:B
Sixth Avenue Express
Image1:File:7th Av–53rd St IND td (2019-06-14) 02.jpg
Size1:250px
Caption1:A Brooklyn-bound B train of R68As at Seventh Avenue
North Term:Bedford Park Boulevard or 145th Street (limited middays and all evenings)
South Term:Brighton Beach
Stations:37
27 (limited midday and all evening service)
Depot:Coney Island Yard
Map State:collapsed

The B Sixth Avenue Express is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored, since it uses the IND Sixth Avenue Line in Manhattan.[1]

The B operates only on weekdays between Brighton Beach in Brooklyn and Bedford Park Boulevard in the Bronx, making express stops in Brooklyn along the BMT Brighton Line and in Manhattan along Sixth Avenue, and making local stops along Central Park West in Manhattan and Grand Concourse in the Bronx. During middays, most alternate trains short turn at 145th Street in Harlem, Manhattan. During evenings, all trains originate and terminate at 145th Street.

Prior to, the B ran almost exclusively in Manhattan, as the BB, from 168th Street in Washington Heights during rush hours to 34th Street–Herald Square in Midtown Manhattan. Upon the opening of the Chrystie Street Connection, the B started running via the BMT West End Line (local) and BMT Fourth Avenue Line (express) in Brooklyn. A short-lived B service marked with a bullet ran via the BMT Broadway Line in Manhattan and the BMT West End Line in Brooklyn from 1986 to 1988 due to Manhattan Bridge renovation, while B service traveled the pre-1967 route between 168th and 34th Streets. After 1989, the B north of 47th–50th Streets–Rockefeller Center used the IND Eighth Avenue Line to 168th Street on weekdays, and the IND 63rd Street Line on evenings and weekends. Late night service ran as a shuttle on the West End Line. Weekday service was rerouted to the Concourse Line in 1998, while off-peak service along 63rd Street ceased in 2000. The B started using the Brighton Line in 2004 after work on the north side of the Manhattan Bridge was completed.

History

|}

The designation B was originally intended for express trains originating from the Washington Heights neighborhood of Manhattan and operating in Midtown Manhattan on the IND Sixth Avenue Line. However, the original B service, beginning with the opening of the Sixth Avenue Line on December 15, 1940, ran as a rush-hour only local service between 168th Street–Washington Heights and 34th Street–Herald Square. This service was designated BB, conforming with the Independent Subway System (IND) convention using double letters to indicate local services.[2]

Chrystie Street Connection

|}The Chrystie Street Connection and the express tracks of the Sixth Avenue Line opened on November 26, 1967, radically changing service. BB trains were combined with the former service, which ran on the BMT West End Line in Brooklyn and the BMT Broadway Line in Manhattan. This created a through service from 168th Street to Coney Island–Stillwell Avenue via the Sixth Avenue Line express tracks and the Manhattan Bridge.[3] During middays, service to and from Brooklyn terminated at West 4th Street. During late night hours and Sundays when B service did not operate, TT shuttles continued to operate on the West End Line.[4] On July 1, 1968, the B was rerouted to terminate at 57th Street in Midtown Manhattan during middays and evenings, extending to 168th Street only during rush hours. The West End Line shuttles were also made part of the B route.[5]

On June 1, 1976, the New York City Transit Authority (NYCTA) announced changes in subway service that were expected to save $12.6 million annually and were the third phase of the agency's plan to realign subway service to better reflect ridership patterns and reduced ridership. As part of the changes, which took effect on August 30, 1976, B service began running between 57th Street and Coney Island during all times, replacing K service, and alternate B trains commenced operating between 168th Street and Coney Island during rush hours.[6] [7] On December 14, 1976, the NYCTA announced severe cuts in bus and subway service in order to cut its budget by $30 million over the following 18 months in order to achieve a balanced budget, at the request of the Emergency Financial Control Board.[8] As part of the cuts, late night B service was cut back to running as a shuttle between 36th Street and Coney Island via the West End Line. This change took effect on August 27, 1977. Initially, the 57th Street station was to be closed during late nights.[9] However, a B shuttle also operated during late nights, running between 47th–50th Streets–Rockefeller Center and 57th Street.[10] [11] [12]

The NYCTA approved four changes in subway service on April 27, 1981, including an increase in B service. The changes were made as part of the $1 million, two-year Rapid Transit Sufficiency Study, and were expected to take place as early as 1982, following public hearings and approval by the Metropolitan Transportation Authority (MTA) board. As part of the changes, midday B service was going to be increased, replacing AA service. B service on the West End Line and Fourth Avenue Line express was to be supplemented by a new rush hour T train, running between Bay Parkway and Chambers Street on the Nassau Street Line.[13]

On June 1, 1983, the NYCTA proposed changes to increase service along Sixth Avenue and better connecting the line to the Bronx and Queens. As part of the changes, B train service would run to 168th Street at all times, with service to 57th Street during non-rush hours replaced by a new H train running between 57th Street and World Trade Center. With the extension of B service to 168th Street, AA service would be eliminated. The changes would have gone into effect in spring or summer 1984, pending approval by the MTA board.[14]

|}

Manhattan Bridge reconstruction (1986 to 2004)

1980s

The reconstruction of the Manhattan Bridge between 1986 and 2004 affected B service as the bridge's north side tracks, which led to the Sixth Avenue Line, were closed multiple times. These closures severed the connection between the northern and southern portions of the route. B service was split into two different services starting on April 26, 1986, with an expected completion date of October 26, 1986.[15] The closure of the bridge's north side tracks caused the return of pre-November 1967 service patterns, before the opening of the Chrystie Street Connection: The orange B duplicated the former BB service, and the yellow B imitated the old service.[16] The northern B service ran via Sixth Avenue, using an orange bullet, between 34th Street-Herald Square and 168th Street during rush hours only. The southern B service ran via the bridge and BMT Broadway Line, using a yellow bullet. It ran from Coney Island-Stillwell Avenue and terminated at Astoria–Ditmars Boulevard rush hours; Queensboro Plaza middays, evenings, and weekends; and 36th Street late nights as a shuttle. Service to 57th Street and Grand Street was replaced by an S shuttle running between these two points via the Sixth Avenue local. On May 24, 1987, evening and weekend Broadway Line B service was cut back from Queensboro Plaza to 57th Street–Seventh Avenue.[17]

Through B service on the Sixth Avenue Line resumed December 11, 1988, when the Manhattan Bridge's north side tracks reopened. Due to increased demand for Sixth Avenue service along Central Park West, B trains were extended local to 168th Street on middays and evenings, partially replacing the discontinued K service.[18] During late nights, the B continued to operate as the West End Shuttle from 36th Street to Coney Island. B service operated to 57th Street during weekends and N service was increased to replace B service to Ditmars Boulevard.[19] [20] In May 1989, Sunday afternoon service was increased to run every 10 minutes instead of every 12 minutes.

With the opening of the IND 63rd Street Line on October 29, 1989, B service was extended from 57th Street to 21st Street–Queensbridge on weekends.[21] [22] [23] In addition, the span of through service on weekends between Brooklyn and Manhattan was increased from 17 to 19 hours. The last Brooklyn-bound through train was the train leaving 57th Street at 1:12 a.m. as opposed to the one leaving at 12:11 a.m., and the first Manhattan-bound through trains were leaving Coney Island at 5:01 a.m. Saturdays and 5:21 a.m. Sundays, compared to 5:42 a.m. Saturday and 6:21 a.m. Sunday trains. Weekday service was also slightly modified, with Stillwell Avenue-bound trains running local along Fourth Avenue in Brooklyn until 8 a.m. instead of 7 a.m.[24]

1990s

On September 30, 1990, evening service was rerouted to 21st Street–Queensbridge to replace Q service with A service running local between 145th and 168th Streets in its place. B trains stopped operating between 47th–50th Streets–Rockefeller Center and 168th Street between 8:15 p.m. and 6:45 a.m., saving the NYCTA $1.35 million annually.[25] Also on this date, because N service resumed running via the Manhattan Bridge, B trains began skipping DeKalb Avenue.[26] [27]

The north side of the Manhattan Bridge closed on middays and weekends from April 30, 1995, until November 12, 1995,[28] during which B trains ran only between Pacific Street and Coney Island–Stillwell Avenue, running local on the BMT West End Line and express on the BMT Fourth Avenue Line.[29]

From February 22, 1998, to May 22, 1999, B service was cut to 57th Street on evenings and weekends due to track and tunnel reconstruction of the IND 63rd Street Line. Service on that line was replaced by a shuttle to the BMT Broadway Line which ran every 20 minutes.[30] [31] The 57th Street station was closed from 12:30 to 6 a.m. daily during the project.[32] The project had initially been slated to be completed in fall 1999,[33] but normal service resumed in May 1999, ahead of schedule.

|}

The B and the switched northern terminals on March 1, 1998, ending the connection between the B and Washington Heights. The B was routed onto the IND Concourse Line to Bedford Park Boulevard during rush hours. Midday service terminated at 145th Street.[34] [35] The change was made to reduce crowding on the C and to reduce passenger confusion about the C's route.[36]

2000s

On November 5, 2000, B service was taken off of the IND 63rd Street Line for signal and track work. It ran along the Eighth Avenue Line to 145th Street (terminating at Bedford Park Boulevard during rush hours) at all times except late nights.[37] [38] [39] A separate B Queensbridge Shuttle continued to operate via 63rd Street during the hours the was not running; service operated between 21st Street and 34th Street–Herald Square via the Broadway Line. This shuttle service operated until January 2001, when the 63rd Street Connector east of 21st Street opened for night and weekend service diversions.[40]

On July 22, 2001, the Manhattan Bridge's north side tracks closed and B service over the Manhattan Bridge was split into two services, similar to the 1986 changes. This time, the southern half of the route that ran via the Broadway Line was named the . B service ran on weekdays only, from 34th Street to Bedford Park Boulevard during rush hours and from 34th Street to 145th Street during middays and evenings.[41] [42] [43]

2004 to present

The Manhattan Bridge was fully reopened to subway service on February 22, 2004. B and D trains were once again extended through Grand Street station and over the bridge's north tracks into Brooklyn. However, rather than returning to the West End Line which it had served in some form since 1967, the B now ran express on the BMT Brighton Line to Brighton Beach (replacing the <Q>) in order to combine two weekday-only services, while the D replaced the B on the West End Line, running express on the BMT Fourth Avenue Line in Brooklyn. B service now operated between Brighton Beach and Bedford Park Boulevard during rush hours and Brighton Beach and 145th Street on weekday middays and evenings.[44] [45] [46] [47]

From September 14, 2009, to October 3, 2011, B trains ran local in Brooklyn due to station renovations on the Brighton Line.[48] [49] [50]

In July 2019, the MTA introduced a proposal to end late evening service.[51] Instead, B service would end around 9:30 PM, which it previously did prior to July 2008.[52] In their proposal, the MTA noted that service often ended early on weeknights to accommodate planned work.

From March 2020 to June 8, 2020, the B was temporarily suspended due to lack of ridership and train crew availability caused by the COVID-19 pandemic.[53] [54] [55] [56] From December 30, 2021,[57] [58] to January 19, 2022, B service was again suspended due to a shortage of crew members exacerbated by the COVID-19 pandemic.[59]

On July 1, 2024, midday service was increased to run every eight minutes instead of every ten minutes and alternate B trains were extended to Bedford Park Boulevard. From August 5, 2024, until early 2025, B trains operate local between Prospect Park and Kings Highway in both directions for accessibility upgrades at the Church Avenue station.[60]

Route

Service pattern

The following table shows the lines used by the B, with shaded boxes indicating the route at the specified times:

LineFromToTracksTimes
week­daysevenings
IND Concourse LineBedford Park Boulevard155th Streetlocal  
145th Streetall 
IND Eighth Avenue Line135th Street59th Street–Columbus Circlelocal
IND Sixth Avenue LineSeventh Avenue/53rd StreetBroadway–Lafayette Streetexpress
Chrystie Street ConnectionGrand Streetall
Manhattan Bridgenorth
BMT Brighton LineDeKalb AvenueBrighton Beachexpress

Stations

For a more detailed station listing, see the articles on the lines listed above.

width=3% width=28% Stationswidth=3% width=36% Subway transferswidth=30% Connections and notes
The Bronx
Concourse Line
align=center align=center
align=center align=center Some northbound a.m. rush hour trips terminate at this station
align=center Bx12 Select Bus Service
align=center Skipped by trains terminating at Kingsbridge Road
align=center align=center
align=center
align=center
align=center
align=center align=center
(IRT Jerome Avenue Line)
Bx6 Select Bus Service
Manhattan
align=center
align=center
(IND Eighth Avenue Line)
Northern terminal for some midday and all evening trains
Eighth Avenue Line
align=center
align=center align=center M60 Select Bus Service to LaGuardia Airport
align=center
align=center
align=center
align=center
align=center M86 Select Bus Service
align=center M79 Select Bus Service
align=center
align=center align=center
(IRT Broadway–Seventh Avenue Line)
Sixth Avenue Line
align=center Seventh Avenue/53rd Street
(IND Queens Boulevard Line)
align=center align=center
align=center align=center
(IRT Flushing Line at)
(IRT Broadway–Seventh Avenue Line at, daytime only)
(BMT Broadway Line at, daytime only)
(42nd Street Shuttle at, daytime only)
(IND Eighth Avenue Line at, daytime only)
align=center align=center
(BMT Broadway Line)
M34 / M34A Select Bus Service
PATH at
Amtrak, LIRR, NJ Transit at Pennsylvania Station
align=center align=center
(IND Eighth Avenue Line)
PATH at
align=center align=center
(IRT Lexington Avenue Line at)
Chrystie Street Branch
align=center
Brooklyn
Brighton Line
align=center align=center
align=center align=center
(BMT Fourth Avenue Line)
(IRT Eastern Parkway Line)
LIRR Atlantic Branch at Atlantic Terminal
align=center
align=center align=center
(BMT Franklin Avenue Line)
align=center
align=center Brighton Beach-bound trains do not stop here because of an accessibility project until fall 2024.
align=center
align=center
align=center
align=center align=center
align=center
align=center
align=center align=center B82 Select Bus Service
align=center
align=center

External links

Notes and References

  1. Web site: Line Colors. mta.info. Metropolitan Transportation Authority. https://web.archive.org/web/20161016104324/http://web.mta.info/developers/resources/line_colors.htm. October 16, 2016. live. October 30, 2016.
  2. News: The New Subway Routes. December 15, 1940. The New York Times. 0362-4331. June 20, 2016. https://web.archive.org/web/20180416013306/https://www.nytimes.com/1940/12/15/archives/the-new-subway-routes.html. April 16, 2018. live.
  3. Web site: New Subway Routes Brochure. November 1967. New York City Transit Authority. The JoeKorner. https://web.archive.org/web/20151208125457/http://www.thejoekorner.com/brochures/index-chrystie.html. December 8, 2015. live. January 24, 2016.
  4. Web site: 1967 . New York City Subway Map and Guide 1967 . dead . https://web.archive.org/web/20200103212407/http://subway.com.ru/maps/images/front/1967cl.jpg . January 3, 2020 . March 29, 2019 . New York City Transit Authority . subway.com.ru.
  5. News: Skip-Stop Subway Begins Run Today – KK Line Links 3 Boroughs – Other Routes Changed. Hofmann. Paul. July 1, 1968. The New York Times. November 27, 2016. 0362-4331.
  6. Web site: Service Adjustment on BMT and IND Lines Effective 1 A.M. Monday, Aug. 30. October 23, 2016. Flickr. October 23, 2016. https://web.archive.org/web/20170105070318/https://www.flickr.com/photos/127872292%40N06/30393951262/. January 5, 2017. live.
  7. News: Some Lines Derailed In Plan for Subway. Raftery. Thomas. June 2, 1976. New York Daily News. March 29, 2019.
  8. News: TA Cuts Subway, Bus Service Jan. 1. Hirschfeld. Neal. December 15, 1976. New York Daily News. March 29, 2019. Patterson. Michael.
  9. News: Angry Riders Blast TA Cuts. January 6, 1977. New York Daily News. March 29, 2019.
  10. Web site: Service Adjustments on the BMT and IND Lines Effective Midnight, Saturday, August 27 New York City Transit Authority (1977). June 9, 2016. Flickr. https://web.archive.org/web/20160915071754/https://www.flickr.com/photos/127872292%40N06/27461551962/. September 15, 2016. live. June 9, 2016.
  11. News: Still Take The A Train. December 15, 1976. New York Daily News. March 29, 2019.
  12. News: Night Service Subway Cuts Start Sunday. McFadden. William. August 22, 1977. New York Daily News. March 29, 2019.
  13. News: TA Approves Four Route Changes. 2-Year Subway Study Affects Only the IND/BMT Division. Edmons. Richard. April 28, 1981. New York Daily News. March 29, 2019.
  14. News: TA Eyes Big Sixth Ave. Beef-Up. Harney. James. June 2, 1983. New York Daily News. March 29, 2019.
  15. Book: Washington Heights, Central Park West And Grand Concourse Riders Your Guide To Service Changes On The B D During Rehabilitation Work April 26 Through October 26, 1986. April 1986. New York City Transit Authority.
  16. Web site: If You Ride These Subway Lines, You Know Something Drastic Has To Be Done.. 1986. New York City Transit Authority. The JoeKorner. https://web.archive.org/web/20170510132607/http://www.thejoekorner.com/brochures/index-BMT-IND%20Const-changes-1986.html. May 10, 2017. live. October 30, 2016.
  17. Web site: Announcing Service Changes On The N and R Routes Beginning May 24, 1987 New Routes Mean Better Service. May 1987. New York City Transit Authority. April 23, 2018. subwaynut.com. https://web.archive.org/web/20160819105802/http://www.subwaynut.com/brochures/nrswitch/index.html. August 19, 2016. live.
  18. Book: Annual Report on 1989 Rapid Routes Schedules and Service Planning . June 1, 1990 . New York City Transit Authority, Operations Planning Department . 17.
  19. Web site: System-Wide Changes In Subway Service Effective Sunday, December 11, 1988. June 17, 2016. Flickr. June 17, 2016. https://web.archive.org/web/20160915071757/https://www.flickr.com/photos/127872292@N06/27699872706/. September 15, 2016. live.
  20. News: Big Changes For Subways Are to Begin. Johnson. Kirk. December 9, 1988. The New York Times. 0362-4331. October 30, 2016.
  21. Web site: October 29, 1989 Subway Map. October 1989. New York City Transit Authority. en-us. Flickr. October 7, 2018.
  22. News: Announcing New Subway Service Between Queens And Manhattan. Starting Sunday, October 29, 1989.. October 24, 1989. New York Daily News. March 29, 2019.
  23. Book: Introducing the New 63 Street Extension Opening 29, 1989. October 1989. New York City Transit Authority.
  24. Book: Annual Report on 1989 Rapid Routes Schedules and Service Planning . June 1, 1990 . New York City Transit Authority, Operations Planning Department . 36.
  25. News: We Will Be Missing Some Trains, Sez TA. Siegel. Joel. September 28, 1990. New York Daily News. March 29, 2019.
  26. Web site: Service Changes September 30, 1990. September 30, 1990. subwaynut.com. New York City Transit Authority. May 1, 2016. https://web.archive.org/web/20141026015324/http://www.subwaynut.com/brochures/1990servicechanges.pdf. October 26, 2014. live.
  27. Web site: September 30, 1990 Subway Map. September 1990. New York City Transit Authority. en-us. Flickr. October 7, 2018.
  28. News: For Riders, A Bright Spot Amid Tumult. Belluck. Pam. November 13, 1995. The New York Times. March 29, 2019. en-US. 0362-4331.
  29. News: Bridge Repairs to Disrupt Off-Peak Subway Service . March 26, 1995 . The New York Times . July 2, 2016 . Ronald Sullivan . https://web.archive.org/web/20160819212037/http://www.nytimes.com/1995/03/26/nyregion/bridge-repairs-to-disrupt-off-peak-subway-service.html . August 19, 2016 . live .
  30. Web site: 63rd Street Shuttle Timetable Effective February 1998. February 1998. Metropolitan Transportation Authority. The JoeKorner. https://web.archive.org/web/20160305031150/http://thejoekorner.com/brochures/index-63shutt.html. March 5, 2016. live. July 31, 2018.
  31. Web site: May 1999 Subway Map. May 1999. Metropolitan Transportation Authority. Flickr. March 29, 2019.
  32. Web site: B Line Av of Americas (6 Av) Express. February 1998. mta.nyc.ny.us. Metropolitan Transportation Authority. https://web.archive.org/web/19990504124438/http://www.mta.nyc.ny.us/nyct/service/bline.htm. May 4, 1999. dead. April 2, 2019.
  33. Book: B Q All Times Service to Lexington Av/63 St, Roosevelt Island, 21 St/Queensbridge Replaced by Special Shuttle February 22 to Fall '99. February 1998. New York City Transit.
  34. Web site: March 1, 1998 B C Routes Are Switching Places Above 145 St. March 1998. Flickr. New York City Transit. October 23, 2016. https://web.archive.org/web/20170105070321/https://www.flickr.com/photos/127872292@N06/30425279591/. January 5, 2017. live.
  35. News: The B and C Routes Will Switch Places Above 145th Street Beginning March 1. February 23, 1998. New York Daily News. March 29, 2019.
  36. News: Changes in B & C Service. February 24, 1998. New York Daily News. March 29, 2019.
  37. Web site: Weekly Subway Service Advisories Updated Nov 9, 2000. November 9, 2000. mta.nyc.ny.us. Metropolitan Transportation Authority. https://web.archive.org/web/20001109144600/http://www.mta.nyc.ny.us/nyct/service/subsrvno.htm#BLine. November 9, 2000. dead. April 2, 2019.
  38. November 2000 . Increased Subway Service . The Bulletin . Electric Railroaders' Association . 43 . 11 . 1.
  39. Web site: June 5, 2001 . B Schedule Effective November 2000 . May 12, 2023 . June 5, 2001 . https://web.archive.org/web/20010605002509/http://www.mta.nyc.ny.us/nyct/service/pdf/tbcur.pdf . dead .
  40. Musluoglu. Subutay. February 2001. 63rd Street Connector. New York Division Bulletin. Electric Railroaders' Association.
  41. Web site: Manhattan Bridge Service Changed B D Q . July 2001. Metropolitan Transportation Authority. The JoeKorner. March 29, 2019.
  42. Web site: B D S Manhattan Bridge Service Change Train Timetable. April 2003. mta.info. New York City Transit. https://web.archive.org/web/20030629092241/http://mta.info/nyct/service/pdf/tdcur.pdf. June 29, 2003. dead. October 30, 2016.
  43. Web site: Manhattan Bridge Service Changes . The New York Times . July 21, 2001 . July 31, 2018 . https://web.archive.org/web/20180703191041/https://www.nytimes.com/2001/07/21/nyregion/manhattan-bridge-service-changes.html . July 3, 2018 . live . mdy-all .
  44. Web site: A Subway Map Remade, In Hopes of Matching Routes and Riders. The New York Times. February 20, 2004. June 9, 2014. https://web.archive.org/web/20140715190540/http://www.nytimes.com/2004/02/20/nyregion/20subway.html. July 15, 2014. live.
  45. Web site: B D M N Q R W Weekday Service Manhattan Bridge Map . February 2004 . mta.info . Metropolitan Transportation Authority . September 18, 2016 . bot: unknown . https://web.archive.org/web/20040205124437/http://www.mta.info/nyct/man_bridge/manhbr_map.pdf . February 5, 2004 .
  46. Web site: MTA NYC Transit Manhattan Bridge Information. February 5, 2004. mta.info. Metropolitan Transportation Authority. https://web.archive.org/web/20040205055553/http://www.mta.info/nyct/man_bridge/bridge_lines.htm#w. February 5, 2004. bot: unknown. September 18, 2016.
  47. Web site: More Service on the Manhattan Bridge B D M N Q R W New Subway Service! February 22, 2004. 2003. The JoeKorNer. New York City Transit. August 5, 2010. https://web.archive.org/web/20140715031348/http://www.thejoekorner.com/brochures/index-manny-bridge-04.html. July 15, 2014. live.
  48. Web site: B Train Timetable. https://web.archive.org/web/20100331000141/http://www.mta.info/nyct/service/pdf/tbcur.pdf. dead. March 31, 2010. January 18, 2010. mta.info. Metropolitan Transportation Authority. October 30, 2016.
  49. Web site: B Express Service Returns to the Brighton Line. September 30, 2011. mta.info. Metropolitan Transportation Authority. March 31, 2019. March 31, 2019. https://web.archive.org/web/20190331175348/http://www.mta.info/press-release/nyc-transit/b-express-service-returns-brighton-line. dead.
  50. October 2009. Brighton Line Station Rehabilitation. The Bulletin. Electric Railroaders' Association. 52. 10. 18. March 31, 2019. March 31, 2019. https://web.archive.org/web/20190331175507/https://erausa.org/pdf/bulletin/2009/2009-10-bulletin.pdf. dead.
  51. Web site: July 2019 NYC Transit/MTA Bus Committee Meeting. July 22, 2019. mta.info. 207. July 24, 2019.
  52. Web site: MTA Press Release NYC Transit Service Adjustments on BMW Lines. July 24, 2008. www.mta.info. July 25, 2019. December 22, 2015. https://web.archive.org/web/20151222200140/http://www.mta.info/press-release/nyc-transit/service-adjustments-bmw-lines. dead.
  53. Web site: Guse . Clayton . Coronavirus forces MTA to implement big cuts to NYC's mass transit . nydailynews.com . March 24, 2020 . June 9, 2020.
  54. News: Martinez. Jose. Subway Service Slowly Gets Back On Track As Transit Workers Return. April 28, 2020. The City. April 29, 2020. April 29, 2020. https://web.archive.org/web/20200429162415/https://thecity.nyc/2020/04/nyc-subways-slowly-get-on-track-as-transit-workers-return.html. dead.
  55. Web site: Bascome. Erik. June 2, 2020. Full Service on MTA Buses, Subways Set to Return by June 8. June 8, 2020. silive.
  56. Web site: Siff. Andrew. June 5, 2020. MTA Resumes Regular Weekday Service; Overnight 4-Hour Closure Stays. June 8, 2020. NBC New York.
  57. Web site: COVID Staffing Crush Forces NYC Subway Suspensions, NJ Transit Cancellations . NBC New York . December 28, 2021 . December 30, 2021.
  58. Web site: Garcia . Kristine . Cole . Kirstin . MTA subway lines suspended due to COVID staff shortages . PIX11 . December 30, 2021 . December 30, 2021.
  59. Web site: 4 Major Subway Lines to Resume Regular Service as Omicron Staffing Havoc Ebbs . NBC New York . January 18, 2022 . January 25, 2022.
  60. Web site: Major construction at Church Avenue B & Q subway station kicks off August 5 . Brooklyn Eagle . July 3, 2024 . July 16, 2024.