Address:1 Margaret Mitchell Square, Atlanta, Georgia
Start Date:1977
Opened Date:May 25, 1980
Renovation Date:2002, 2018-2021
Destruction Date:-->
Management:or
Operator:or
Governing Body:-->
Architect:Marcel Breuer
Ren Architect:Moody Nolan,
Cooper Carry
Ren Oth Designers:Vines Architects

The Atlanta Central Library in Downtown Atlanta is the main library and headquarters of the Atlanta–Fulton Public Library System.[1] The visual conceptualization the building is influenced by Mid-Century Modernism and the International Style, with the exterior cladding and surface being Béton Brut; an architectural aesthetic that later became known as Brutalism or Brutalist.  Built from 1977 to 1980, the library was Marcel Breuer’s last work, and his only building in Atlanta. In 2002 the building was partially renovated, and following a 2016 vote against demolishing the structure a complete renovation took place from 2018 to 2021.

History

Prior building

On March 4, 1902, the first public library, the Carnegie Library, opened on the site of the current Central Library. When the library opened, only the basement, the stacks, and the children's room were completed.[2] The Carnegie Library remained the main library of the system for most of the century. The library was renovated in 1950 and 1966 through city bond funding. Before 1950 the system was referred to as the Carnegie Library, but to commemorate the renovation of the central Carnegie Library the system was renamed the Atlanta Public Library in 1950.[3] It was in this building that 20 gay men were arrested following a police stakeout in September 1953, an event known as the Atlanta Public Library perversion case.[4] In 1977 the Carnegie Library was torn down to make way for the current Central Library. However, the building's architectural bays were preserved, and used to create the Carnegie Education Pavilion, a monument to higher education in Atlanta.

Breuer building

Completed in 1980, it was the last building to be designed by Bauhaus-movement architect Marcel Breuer. The building, designed in the Brutalist architectural style, was once considered a masterpiece by architectural experts, such as Barry Bergdoll, the Chief Architectural Curator of the Museum of Modern Art, and is closely related to Breuer's Whitney Museum of Art building.[5] Breuer was unable to attend the dedication ceremonies on May 25, 1980, and he died a year later on July 1, 1981, at the age of 79.[6]

The concept for the design dates back to 1969, but the contract was not awarded to Breuer until 1976, because of disputes between the library administration and city government over the bond referendum needed to raise the $18.9 million for construction of the library. Construction began in 1977, and when the structure was completed in 1980 it featured a 300-seat theater, six stories of library space, and a restaurant. The building was built for a capacity of 1,000 users and 1 million volumes. The structure consists of a steel frame and concrete slabs, and the exterior is composed of precast concrete panels that were bush-hammered for texture. Concrete was chosen as the material because concrete allowed for the most economical implementation of the special shapes required for the recessed windows and splayed reveals. The second, third, and fourth stories are connected by a monumental concrete staircase.[7]

Since 1980, however, the state-of-the-art facilities have deteriorated. The theater was closed during the mid-1990s after water from a leaking concrete planter above the theater collapsed parts of the ceiling, but has since been renovated due to recent interest in the building. Although the restaurant was busy and successful during the early years it was closed during the late 1990s.[8] Furthermore, the Brutalist architectural style of the library has not been widely appreciated by the public. In an effort to mute the perceived harshness of the style, the system spent $5 million to renovate the building in 2002. The money was spent on a new carpet with colorful highlights and more colorful walls. A full renovation would have cost an estimated $34 million.[9] Nonetheless, it remained unclear as to what would happen to the Breuer building.[10] A multi-year preservation effort led by artist, writer and historian, Max Eternity,[11] renewed interest in the building, and the library was listed on the 2010 World Monuments Watch List of Most Endangered Sites.

In July 2016 the Fulton County Board of Commissioners unanimously voted not to demolish the library building.[12] The library was closed in July 2018 for extensive interior and exterior renovations led by architectural firm Cooper Carry in association with Vines Architects as designers and Moody Nolan as architect of record. Within this renovation program, the addition of numerous large windows to the facade prompted strong criticism from preservationists and architects for its alteration of Breuer’s original design.[13] Renovation work of $50 million was largely complete by February 2021.[14] The Atlanta-Fulton Library System announced in March 2021 that the Atlanta Central Library would reopen in late summer or early fall 2021, with the official reopening in early October 2021.[15] [16]

External links

Notes and References

  1. "Central Library & Library System Headquarters ." Atlanta–Fulton Public Library System. Retrieved on June 29, 2017.
  2. News: J R . Nutting . Carnegie's Gift to Atlanta Will Become Active Today. The Atlanta Constitution . 1 . 1902-03-04.
  3. Web site: 100 Years of Library Service . 2011-01-01 . Atlanta–Fulton Public Library System . 2018-04-17 . https://web.archive.org/web/20180417023005/http://www.afpls.org/about-afpls/history/166-100-years-of-library-service . dead .
  4. Web site: Sylvestre. Berlin. August 3, 2018. From Whence We Came: Our LGBTQ ATL History. August 4, 2020. The Georgia Voice. en-US.
  5. Web site: Jonathan . Lerner . Atlanta's urge for a trendy new central library may mean that time is up for Marcel Breuer's final building. 2009-08-12 . Metropolis Magazine . 2009-02-18 . dead . https://web.archive.org/web/20090704041858/http://www.metropolismag.com/story/20090218/overdue . 2009-07-04 .
  6. Web site: Central Library & Library System Headquarters. Afpls.org. 12 July 2018. July 27, 2020. https://web.archive.org/web/20200727112024/http://afpls.org/central-hq#History. dead.
  7. Book: Hyman, Isabelle . Marcel Breuer, Architect: The Career and the Buildings . Harry N. Abrams, Inc. . 2001 . 0-8109-4265-8.
  8. News: Library's lost luster: Twenty years of decay and obsolescence has siphoned Centrals' cultural swagger. A $3 million face-lift may not be enough. . The Atlanta Journal-Constitution . 1G . 2001-03-11.
  9. News: Beauty, truth and bonds: Is library a classy eyesore? . The Atlanta Journal-Constitution . A1 . 2008-07-28.
  10. Web site: Angela . Serratore . Threatened in Atlanta: Breuer's Last Design . 2009-08-12 . Preservation Magazine . 2009-03-23.
  11. Web site: Central Library (preservation blogspot). Centralbranchlibrary.blogspot.com. 12 July 2018.
  12. Web site: Fulton County Votes To Not Demolish Central Library. News.wabe.org. 12 July 2018.
  13. Web site: Central Atlanta Library readies to close in July for renovations. 2021-08-25. Curbed Atlanta. 2021-06-01.
  14. Web site: Central Atlanta Library's controversial redo is almost finished. Is it really so bad?. 2021-08-25. Urbanize Atlanta. 2021-02-25.
  15. Web site: Fulton libraries planning phased reopening starting May 1. 2021-08-25. The Marietta Daily Journal. 2021-04-13.
  16. News: Moffatt . Emil . Fulton County re-opens downtown library after $50 million renovation project . 14 October 2021 . 90.1 FM WABE . 4 October 2021 . https://web.archive.org/web/20211006093050/https://www.wabe.org/fulton-county-re-opens-downtown-library-after-extensive-renovations/ . 6 October 2021.