Atal Setu, Goa Explained

Bridge Name:Atal Setu
Named For:PM Atal Bihari Vajpayee
Carries:4 lanes of NH 66
Crosses:Mandovi River
Locale:Panaji, Goa, India
Official Name:Atal Setu
Other Name:Third Mandovi Bridge
Maint:Goa State Infrastructure Development Corporation Limited (GSIDC)
Design:Cable-stayed bridge
Material:Steel and concrete pylons
Length:3190m (10,470feet)
Width:21m (69feet)[1]
Height:30m (100feet)
Mainspan:150m (490feet)
Pierswater:4
Builder:Larsen & Toubro (L&T), DSI-Bridgecon
Begin:27 July 2014
Complete:December 2018
Open:5 February 2019
Inaugurated:27 January 2019

The Atal Setu is a cable-stayed bridge in Goa that runs between Panaji and Porvorim. It carries National Highway 66 over the tidal part of the Mandovi River. It is 5.1km (03.2miles) long, making it the third longest cable-stayed bridge in India. Two wheelers, three wheelers and bullock carts are prohibited from using the Atal Setu[2] due to its height of 30m (100feet). It officially opened on 5 February 2019.

History

The Atal Setu is one of the most famous and longest bridges in Goa. It is the third bridge to be built over the Mandovi River. Before the First Mandovi Bridge was built, the ferry was the main mode of transport across the Mandovi River in the 1970s, between Panaji and Betim village. Due to heavy traffic, the first bridge was built in the 1970s. In 1986 the first bridge collapsed and was rebuilt. The second bridge was constructed in 1998 to accommodate heavy transport vehicles. Construction began on the third bridge in 2014. The reason for the third cable-stayed bridge is to accommodate heavy traffic, especially during the peak year-end tourist season.[3] The bridge was inaugurated on 27 January 2019.

Construction

On 14 June 2014, Indian Prime Minister Narendra Modi laid the foundation stone for the third Mandovi bridge. The bridge was completed on 27 January 2019 and inaugurated by the Central Minister for Road Transport and Highways Nitin Gadkari; and later by Goa Chief Minister Manohar Parrikar in the presence of former deputy Chief Minister of Goa Sudin Dhavalikar, who was the State Minister for Roads at the time. This bridge was named Atal Setu after former Prime Minister Atal Bihari Vajpayee. On 5 February, the bridge was opened for vehicular traffic.[4]

Larsen and Toubro (L&T) were awarded the EPC contract at a bid of to build and design the bridge.[5] It is a cable-stayed bridge constructed between the first and second parallel bridges and is 15 meters higher than the existing two bridges. This is Goa's longest bridge and India's third longest cable-stayed bridge.[6] The bridge is a 900 m four lane bridge with a 550 m cable stay portion and a 3.2 km viaduct approach.[7] The main bridge is 600 m in length with two end spans of 75 m and three interior spans of 150 m. The main bridge superstructure consists of a 21 m wide externally strutted segmented concrete box girder with a dual carriageway of 2 x 8.5 m with a 3 m wide median at the centre. The box girder is supported by stay cables anchored in the pylon and stressed from a box girder bottom. Another flyover arising from the Merces-Old Goa bypass road joins the Mandovi bridge for traffic from Ponda towards Panjim.

The revised cost of construction of the bridge was and the cost could increase by .[8] The Goa State Infrastructure Development Corporation (GSIDC) said that almost 100 million litres of water was saved while building the bridge.[9]

Finance

During the laying of the foundation stone, the Government of Goa claimed that the bridge would be funded independently. The loan agreement was signed on 8 June 2015 between the National Bank for Agriculture and Rural Development (NABARD) and the nodal agency, who granted a loan amount of . The original cost was estimated to be, that has risen to . With a re-payment period of 12 years, the government is supposed to pay an interest of annually for the loan. The total amount to be repaid to NABARD by the end of June 2027, therefore, stands at . The bridge is the most expensive in Goan history.[10] [11] On 20 March 2018, the Union Minister for Road Transport & Highways, Nitin Gadkari, said that the central government would bear 50 percent of the bridge's cost, which is and an additional for the road connecting the bridge.[12] [13]

Incidents

On 26 December 2016, a worker died on the construction site after suffering from 90 percent burns after a fire broke out in an 8 meter deep vertical tunnel of the under construction bridge pillar.[14] On 30 December 2017, a fire broke out on an under construction pier supporting the cable-stayed bridge; however, there were no casualties and the situation was brought under control.[15]

Traffic

Mandovi Bridge is one of the most heavily used bridges in Goa. According to GSIDC sources, almost 66,000 vehicles travel over the bridge every day.[16]

Due to high wind speeds, GSIDC announced that two-wheelers and three-wheelers are prohibited from using Atal Setu.[17]

Criticism

Environmental issues

The construction of the third bridge was challenged by the Goa Foundation, who alleged that it is being constructed without an Environment Clearance. It also challenged the destruction of some 247 mangrove trees for constructing ramps to access the bridge.[18] According to the Goa State Infrastructure Development Corporation's Environment Impact Assessment (EIA) report as requested by National Green Tribunal, the construction of the bridge would destroy mangroves and impact marine ecology.

The EIA stated that there would be no loss to flora and fauna. However, the mangroves will be replaced at suitable sites identified by the Forest Department, and marine ecology will be restored as stated by the EIA.[19]

See also

Notes and References

  1. News: Mandovi Bridge. GSIDC. 2 November 2017. 30 December 2017.
  2. News: Last segment of river portion of Mandovi bridge joined. en. oHeraldo. 2018-07-04.
  3. News: New bridges necessary to handle year-end tourist traffic, says CM - Times of India. The Times of India. 2018-01-01.
  4. Web site: Vehicles on Atal Setu only from February 5 - Times of India. The Times of India. 2019-02-05.
  5. News: GSIDC to build bridge across Ourem creek. oHeraldo. 2018-01-01. en.
  6. News: "THIRD MANDOVI BRIDGE" Goa’s biggest bridge in Making. 2015-03-13. 2017-12-30. en.
  7. Web site: Larsen &Toubro Limited. www.lntecc.com. 2017-12-30.
  8. News: No major rise in cost of third Mandovi bridge project: CM. The Navhind Times. en-US. 2017-12-30.
  9. Web site: 10 crore litre water saved while building cable-stayed Mandovi bridge: GSIDC - Times of India. The Times of India. 2019-01-26.
  10. News: New Mandovi bridge to cost almost double. The Goan. 2018-01-02.
  11. Web site: A bridge too far – Business Goa. businessgoa.in. en-US. 2018-01-02. https://web.archive.org/web/20180103072436/http://businessgoa.in/2016/11/14/a-bridge-too-far/. 2018-01-03. dead.
  12. News: New Mandovi bridge: Centre to pay Rs 400 crore - Times of India. The Times of India. 2018-04-24.
  13. Web site: More funds sanctioned for third Mandovi bridge: Gadkari The Navhind Times. www.navhindtimes.in. en-US. 2018-04-24.
  14. News: Man burnt to death at third Mandovi bridge site. oHeraldo. 2018-01-01. en.
  15. News: Fire breaks out atop pier of 3rd Mandovi bridge, no casualties - Times of India. The Times of India. 2018-01-01.
  16. News: Work on new Mandovi bridge from this month - Times of India. The Times of India. 2017-12-30.
  17. Web site: No two and three-wheelers on third Mandovi bridge - Times of India. The Times of India. 2019-01-16.
  18. News: NGT relief to govt on third Mandovi bridge continues. oHeraldo. 2018-01-01. en.
  19. News: Mandovi bridge will destroy mangroves, to ‘a certain extent’: EIA report. oHeraldo. 2017-12-31. en.