Stadium Name:Arthur Ashe Stadium
Location:USTA Billie Jean King National Tennis Center, Flushing, Queens, New York
Opened:1997
Publictransit: Long Island Rail Road (LIRR): at Mets–Willets Point
New York City Subway: at Mets–Willets Point
Renovated:2016
Construction Cost:$ 254 million
($ in dollars)
Owner:USTA
Surface:Laykold
Tenants:US Open (USTA) (1997–present)
Westminster Kennel Club (2023)
Seating Capacity:23,771
Architect:Rossetti Architects

Arthur Ashe Stadium is a tennis arena at Flushing Meadows–Corona Park in Queens, New York City. Part of the USTA Billie Jean King National Tennis Center, it is the main stadium of the US Open tennis tournament and has a capacity of 23,771, making it the largest tennis stadium in the world.[1] [2]

The stadium is named after Arthur Ashe (1943–1993), winner of the inaugural 1968 US Open, the first in which professionals could compete.[3] The original stadium design, completed in 1997, had not included a roof. After suffering successive years of event delays from inclement weather, a new lightweight retractable roof was completed in 2016.

History

Opened in 1997, the facility replaced Louis Armstrong Stadium as the primary venue for the tournament. It cost $254 million to construct, and then had 22,547 seats, 90 luxury suites, five restaurants, and a two-level players' lounge, making it by far the largest tennis-only venue in the world. Like the other in the facility, it has a DecoTurf cushioned acrylic surface.

On August 25, 1997, the stadium opened by hosting the US Open, with Whitney Houston singing "One Moment in Time" during the stadium's inauguration ceremonies and dedicating the performance to the late Arthur Ashe.[4]

The first official match played on the court was at the 1997 US Open between Tamarine Tanasugarn of Thailand and Chanda Rubin of the United States. Tanasugarn won in two sets.[5]

The stadium has also hosted the first-ever outdoor regular season WNBA game in 2008; the Indiana Fever beat the host New York Liberty The game served as a fundraising event for breast cancer research.

The facility features a Hawk-Eye electronic system which allows tennis players to challenge the umpire's decision on calls made throughout championships. In 2005, the color scheme for the courts was changed from green to electric blue inner courts and a light green outer court. All US Open Series events now use this color scheme, providing television viewers a more easily trackable ball - with the yellow tennis balls contrasting more visibly against the blue courts.[6]

On July 26–28, 2019, the stadium hosted the Fortnite World Cup, a three-day long esports tournament with a prize pool of 30 million, $3 million of which awarded to the winner of the Finals.[7]

During the COVID-19 pandemic in New York City, the stadium was converted for use as a hospital.[8]

On September 22, 2021, the stadium hosted All Elite Wrestling. Dynamite was filmed live, alongside tapings for Rampage as well as Elevation. The Dynamite and Rampage episodes were titled "Grand Slam" with Rampage expanded to two hours for the special. The event marked AEW's debut show in New York City and the first professional wrestling show ever held at the tennis complex.[9] "Grand Slam" was held at the stadium again in 2022 and 2023.

On November 3, 2022, the Westminster Kennel Club Dog Show announced the primary event will move to Arthur Ashe Stadium in 2023.[10]

Retractable roof

Lacking a roof, where relatively strong and unpredictable winds could occur inside the stadium,[11] events were vulnerable to inclement weather—and five straight years of rain delays occurred during the US Open men's singles final from 2008 to 2012.[12]

Despite the original design's lacking provisions for a roof, the USTA announced in 2013 plans to construct a roof for the stadium using a 5000ST superstructure—having consulted "with every architect involved in the design of a stadium roof in North America."

Notably, the site of the Ashe center featured poor soil conditions. It had previously been Manhattan's Corona Ash Dumps (featured prominently in F. Scott Fitzgerald's The Great Gatsby as the Valley of Ashes) and prior to that a natural wetland swamp. For the new roof, a very light solution was critical.

The roof has two 800-ton fabric panels made of 210000square feet of lightweight PTFE membrane which can open or close on glides, up to 25 feet per minute, to create an opening roughly the size of 17 Olympic swimming pools. The stadium is not fully conditioned; a new chilled water ventilation system controls humidity when the roof is closed. The new cantilevering design is supported by eight columns that sit on concrete bases, each supported by 20 piles driven 150 to 200 feet deep and has a data acquisition and recording system along with synchronized cameras to interpret the data created by the complex control systems.[13] The roof, which cost $150 million, was part of a $550 million renovation of the National Tennis Center. The retractable roof project was completed in 2016.[14] [15] [16] [17]

The roof was designed by Rossetti Architects and its structure engineered by WSP Global. Geiger Engineers designed the roof's mechanization system.[18] Engineer of Record for the mechanization system was Hardesty & Hanover in partnership with Morgan Engineering.[19]

See also

External links

Notes and References

  1. Web site: Czermak. Chris. The Top 12 Biggest Tennis Stadiums in the World by Capacity . Tennis Creative. May 3, 2021 .
  2. Web site: What's New, and What's Free, at the 2018 U.S. Open. The New York Times. 20 August 2018. The new stadium has the tournament’s second retractable roof, after one was added over the 23,771-seat Arthur Ashe Stadium in 2016..
  3. Web site: Ashe & Armstrong Stadiums . United States Tennis Association's official website . June 30, 2005 . https://web.archive.org/web/20051116164618/http://www.usta.com/nationaltenniscenternews/fullstory.sps?iNewsid=14185&itype=941&icategoryid=0 . November 16, 2005 . dead . mdy .
  4. News: Clifford . Krauss . Arthur Ashe Stadium's Opening Serve Is in Giuliani's Court . . August 22, 1997 . January 26, 2011.
  5. Web site: Drucker . Joel . August 28, 2017 . Arthur Ashe Stadium: 20 moments for 20 years . www.usopen.org.
  6. News: Blue courts to be used make viewing ball easier . ESPN.com . Associated Press . May 16, 2005 . February 15, 2011.
  7. Web site: Vincent . Brittany . July 16, 2019 . The next World Cup? Fortnite. Here's everything you need to know . NBC News . 17 July 2019.
  8. Watch how a New York City tennis facility became a headquarters for COVID-19 relief . Time . Bates . Josiah . May 5, 2020 . January 20, 2023 . en.
  9. Web site: Feldman. Kate. June 16, 2021. 'The coolest wrestling company in the world': AEW brings live show to NYC, Arthur Ashe Stadium in September with 'Dynamite: Grand Slam'. 2021-06-16. Daily News . New York.
  10. November 3, 2022 . THE 147TH ANNUAL WESTMINSTER KENNEL CLUB DOG SHOW TO BE HELD AT THE USTA BILLIE JEAN KING NATIONAL TENNIS CENTER . Westminster Kennel Club . 2023-01-21 . Westminster.
  11. News: Clarey. Christopher . At Main Court, Wind Is Common Opponent . . September 8, 2010 . September 13, 2010 . https://web.archive.org/web/20110429090339/http://www.nytimes.com/2010/09/09/sports/tennis/09wind.html . April 29, 2011 . live.
  12. Web site: U.S. Open: For Fifth Straight Year, Men's Final Pushed to Monday. Sports Media Watch. Lewis. Jon. September 8, 2012.
  13. Web site: iba-System . iba America, LLC . August 3, 2016 . https://web.archive.org/web/20160820191547/http://www.iba-america.com/en/iba-system/iba-system/ . August 20, 2016 . dead.
  14. News: Popper . Steve . As Rain Continues, Officials Considering Roof for U.S. Open . . September 3, 2003 . August 16, 2013.
  15. Web site: USTA: Retractable Roof Will Be Constructed Over Arthur Ashe Stadium. August 14, 2013. CBS.
  16. News: Playing Doubles: U.S. Open Will Get 2 Roofs . Naila-Jean . Meyers . The New York Times . August 15, 2013 . September 5, 2013.
  17. News: Wait until you see the US Open's new $150M retractable roof. Marc . Berman . The New York Post . August 25, 2016 . August 25, 2016.
  18. Web site: Arthur Ashe Stadium (USTA). Taiyo Kogyo Corporation. December 28, 2015.
  19. Web site: Arthur Ashe Stadium Roof. Steel Institute of New York. April 30, 2021.