Arriva Rail London Explained

Arriva Rail London
Logo Filename:ArrivaRailLondon.svg
Image Filename:Kilburn High Road railway station MMB 07 378255.jpg
Caption:Class 378 Capitalstar at in 2014
Franchise:London Overground
13 November 2016 - May 2026
Regions:Greater London
Parent Company:Arriva UK Trains

Arriva Rail London[1] is a train operating company owned by Arriva UK Trains that operates the London Overground concession on behalf of Transport for London.

History

In April 2015, Transport for London placed a notice in the Official Journal of the European Union, inviting expressions of interest in operating the next concession.[2] In July 2015, Transport for London announced the shortlisted bidders for the next concession were Arriva UK Trains, ComfortDelGro, Govia and MTR Corporation.[3]

In March 2016, Arriva was awarded a seven-and-a-half-year concession with an option to extend for a further two years. Operations commenced on 13 November 2016.[4] [5] [6] Arriva held a 50% shareholding in the previous concession holder, London Overground Rail Operations.

In June 2023 Arriva Rail London were granted a two-year contract extension, pushing the contract's expiry date to May 2026. The new contract came into effect upon expiry of the old contract in May 2024.[7]

Rolling stock

Arriva Rail London inherited a fleet of Class 172, Class 315, Class 317 and Class 378s. From 2019, the first of 54 Class 710s were delivered.[8] These replaced the Class 172, Class 315 and Class 317s, and the Class 378s on Watford DC line duties, allowing them to be concentrated on North London line, East London line, West London line and South London line services.[9]

On 22 May 2019 TfL announced that approval had been gained for the Class 710s to enter passenger service. The first two units entered service on the Gospel Oak to Barking Line on Thursday 23 May 2019 and the remaining six were in service by August 2019, with the first unit entering service on the Watford DC line on 9 September 2019. The first units on the Lea Valley lines entered service on 3 March 2020 after a first attempt on 24 February 2020.[10] [11] Their use on Romford–Upminster line services began in October 2020.[12]

Current fleet

Family Class ImageType Top speed  Number  Train Numbers  Cars  Seat layout  Routes operated  Built 
 mph  km/h 
Bombardier Electrostar378/1 CapitalstarEMU7512020378135–1545LongitudinalEast London line
South London line
2009–10
378/2 CapitalstarEMU7512037378201–378234
378255–378257
5LongitudinalNorth London line
West London line
East London line
South London line
Watford DC line
2008–11
Bombardier AventraEMU7512030710101-1304LongitudinalLea Valley lines
Romford–Upminster line
2017–20
710/2EMU7512018710256-2734LongitudinalGospel Oak to Barking line
Watford DC line
2017–20
710/3EMU751206710374-379[13] 5LongitudinalWatford DC line2020

Past fleet

Former train types operated by Arriva Rail London include:

Family Class  Image  Type Top speedNumberCarriagesRoutes operatedYears builtYears
operated
 mph  km/h 
Bombardier Turbostar172/0DMU10016082Gospel Oak to Barking line20102010–19
BREL 1972315EMU75120174Lea Valley lines
Romford–Upminster line
1980–812015–2020
BR Second Generation (Mark 3)EMU10016184Lea Valley lines1981–822015–2020
EMU10016164Lea Valley lines1981–822015–2020

Depots

Arriva Rail London's fleet is maintained at Ilford, New Cross Gate and Willesden depots.

Notes and References

  1. http://data.companieshouse.gov.uk/doc/company/04165861 Companies House extract company no 4165861
  2. http://tfl.gov.uk/info-for/media/press-releases/2015/april/tfl-starts-search-for-next-operator-to-run-overground TfL starts search for next operator to run Overground
  3. http://www.railwaygazette.com/news/passenger/single-view/view/four-bidders-shortlisted-for-london-overground-operating-concession.html Four bidders shortlisted for London Overground operating concession
  4. https://www.bbc.co.uk/news/business-35841733 "Arriva wins £1.5bn London Overground contract"
  5. http://www.arriva.co.uk/media/news/2016/18-03-2016 Transport for London announces intention to award London Overground contract to Arriva
  6. http://www.railtechnologymagazine.com/Rail-News/tfl-confirm-london-overground-contract-with-arriva-signed TfL confirm London Overground contract with Arriva signed
  7. Web site: Arriva secures contract extension with Transport for London for the London Overground . 2024-01-27 . Arriva PLC . english.
  8. http://www.railwaygazette.com/news/urban/single-view/view/bombardier-wins-london-overground-emu-contract.html Bombardier wins London Overground EMU contract
  9. TFL's order for West Anglia Aventra EMUs confirmed . . 780 . 5 August 2015. 29.
  10. News: Bombardier Class 710/1s finally make their passenger debut on West Anglia suburban routes . 4 March 2020 . Rail . 4 March 2020 . 13 March 2020 . https://web.archive.org/web/20200313010214/https://www.railmagazine.com/news/network/bombardier-class-710/1s-finally-make-their-passenger-debut-at-liverpool-street . live .
  11. New London Overground electric trains enter service . Transport for London . 2019-05-22. 13 August 2020. https://web.archive.org/web/20200813002300/https://tfl.gov.uk/info-for/media/press-releases/2019/may/new-london-overground-electric-trains-enter-servi. live.
  12. New London Overground electric trains enter service . Transport for London . 2019-05-22. 13 August 2020. https://web.archive.org/web/20200813002300/https://tfl.gov.uk/info-for/media/press-releases/2019/may/new-london-overground-electric-trains-enter-servi. live.
  13. 21 April 2021 . 5 car 710's renumbered . Today's railways . 231 . 70.