Apollo command and service module explained

Apollo command and service module
Manufacturer:North American Aviation
Designer:Maxime Faget
Country:United States
Operator:NASA
Applications:Crewed cislunar flight and lunar orbit
Skylab crew shuttle
Apollo–Soyuz Test Project
Spacecraft Type:Capsule
Design Life:14 days
Launch Mass: Earth orbit
Lunar
Crew Capacity:3
Power:3 × 1.4kW, 30VDC fuel cells
Batteries:3 × 40 ampere-hour silver-oxide
Orbits:Low Earth orbit
Cislunar space
Lunar orbit
Status:Retired
Built:35
Launched:19
Operational:19
Failed:2
Lost:1
First:February 26, 1966 (AS-201)
Last:July 15, 1975 (Apollo–Soyuz)
Lastretired:July 24, 1975
Service Propulsion System
Engines:1 × AJ10-137[1]
Burntime:750 s
Flown With:Apollo Lunar Module
Bottom Image:Apollo-linedrawing.png
Bottom Image Caption:Apollo Block II CSM diagram
Previous:Gemini spacecraft
Next:Orion (spacecraft)

The Apollo command and service module (CSM) was one of two principal components of the United States Apollo spacecraft, used for the Apollo program, which landed astronauts on the Moon between 1969 and 1972. The CSM functioned as a mother ship, which carried a crew of three astronauts and the second Apollo spacecraft, the Apollo Lunar Module, to lunar orbit, and brought the astronauts back to Earth. It consisted of two parts: the conical command module, a cabin that housed the crew and carried equipment needed for atmospheric reentry and splashdown; and the cylindrical service module which provided propulsion, electrical power and storage for various consumables required during a mission. An umbilical connection transferred power and consumables between the two modules. Just before reentry of the command module on the return home, the umbilical connection was severed and the service module was cast off and allowed to burn up in the atmosphere.

The CSM was developed and built for NASA by North American Aviation starting in November 1961. It was initially designed to land on the Moon atop a landing rocket stage and return all three astronauts on a direct-ascent mission, which would not use a separate lunar module, and thus had no provisions for docking with another spacecraft. This, plus other required design changes, led to the decision to design two versions of the CSM: Block I was to be used for uncrewed missions and a single crewed Earth orbit flight (Apollo 1), while the more advanced Block II was designed for use with the lunar module. The Apollo 1 flight was cancelled after a cabin fire killed the crew and destroyed their command module during a launch rehearsal test. Corrections of the problems which caused the fire were applied to the Block II spacecraft, which was used for all crewed spaceflights.

Nineteen CSMs were launched into space. Of these, nine flew humans to the Moon between 1968 and 1972, and another two performed crewed test flights in low Earth orbit, all as part of the Apollo program. Before these, another four CSMs had flown as uncrewed Apollo tests, of which two were suborbital flights and another two were orbital flights. Following the conclusion of the Apollo program and during 1973–1974, three CSMs ferried astronauts to the orbital Skylab space station. Finally in 1975, the last flown CSM docked with the Soviet craft Soyuz 19 as part of the international Apollo–Soyuz Test Project.

Before Apollo

Concepts of an advanced crewed spacecraft started before the Moon landing goal was announced. The three-person vehicle was to be mainly for orbital use around Earth. It would include a large pressurized auxiliary orbital module where the crew would live and work for weeks at a time. They would perform space station-type activities in the module, while later versions would use the module to carry cargo to space stations. The spacecraft was to service the Project Olympus (LORL), a foldable rotating space station launched on a single Saturn V. Later versions would be used on circumlunar flights, and would be the basis for a direct ascent lunar spacecraft as well as used on interplanetary missions. In late 1960, NASA called on U.S. industry to propose designs for the vehicle. On May 25, 1961 President John F. Kennedy announced the Moon landing goal before 1970, which immediately rendered NASA's Olympus Station plans obsolete.[2] [3]

Development history

When NASA awarded the initial Apollo contract to North American Aviation on November 28, 1961, it was still assumed the lunar landing would be achieved by direct ascent rather than by lunar orbit rendezvous.[4] Therefore, design proceeded without a means of docking the command module to a lunar excursion module (LEM). But the change to lunar orbit rendezvous, plus several technical obstacles encountered in some subsystems (such as environmental control), soon made it clear that substantial redesign would be required. In 1963, NASA decided the most efficient way to keep the program on track was to proceed with the development in two versions:[5]

By January 1964, North American started presenting Block II design details to NASA.[6] Block I spacecraft were used for all uncrewed Saturn 1B and Saturn V test flights. Initially two crewed flights were planned, but this was reduced to one in late 1966. This mission, designated AS-204 but named Apollo 1 by its flight crew, was planned for launch on February 21, 1967. During a dress rehearsal for the launch on January 27, all three astronauts (Gus Grissom, Ed White and Roger Chaffee) were killed in a cabin fire, which revealed serious design, construction and maintenance shortcomings in Block I, many of which had been carried over into Block II command modules being built at the time.

After a thorough investigation by the Apollo 204 Review Board, it was decided to terminate the crewed Block I phase and redefine Block II to incorporate the review board's recommendations. Block II incorporated a revised CM heat shield design, which was tested on the uncrewed Apollo 4 and Apollo 6 flights, so the first all-up Block II spacecraft flew on the first crewed mission, Apollo 7.

The two blocks were essentially similar in overall dimensions, but several design improvements resulted in weight reduction in Block II. Also, the Block I service module propellant tanks were slightly larger than in Block II. The Apollo 1 spacecraft weighed approximately 45000lb, while the Block II Apollo 7 weighed 36400lb. (These two Earth orbital craft were lighter than the craft which later went to the Moon, as they carried propellant in only one set of tanks, and did not carry the high-gain S-band antenna.) In the specifications given below, unless otherwise noted, all weights given are for the Block II spacecraft.

The total cost of the CSM for development and the units produced was $36.9 billion in 2016 dollars, adjusted from a nominal total of $3.7 billion[7] using the NASA New Start Inflation Indices.[8]

Command module (CM)

The command module was a truncated cone (frustum) with a diameter of 12inchesft10inchesin (ftin) across the base, and a height of 11inchesft5inchesin (ftin) including the docking probe and dish-shaped aft heat shield. The forward compartment contained two reaction control system thrusters, the docking tunnel, and the Earth Landing System. The inner pressure vessel housed the crew accommodation, equipment bays, controls and displays, and many spacecraft systems. The aft compartment contained 10 reaction control engines and their related propellant tanks, freshwater tanks, and the CSM umbilical cables.[9]

Construction

The command module was built in North American's factory in Downey, California,[10] [11] and consisted of two basic structures joined together: the inner structure (pressure shell) and the outer structure.

The inner structure was an aluminum sandwich construction consisting of a welded aluminum inner skin, adhesively bonded aluminum honeycomb core, and outer face sheet. The thickness of the honeycomb varied from about 1.5inches at the base to about 0.25inches at the forward access tunnel. This inner structure was the pressurized crew compartment.

The outer structure was made of stainless steel brazed-honeycomb brazed between steel alloy face sheets. It varied in thickness from 0.5 inch to 2.5 inches. Part of the area between the inner and outer shells was filled with a layer of fiberglass insulation as additional heat protection.[12]

Thermal protection (heat shield)

An ablative heat shield on the outside of the CM protected the capsule from the heat of reentry, which is sufficient to melt most metals. This heat shield was composed of phenolic formaldehyde resin. During reentry, this material charred and melted away, absorbing and carrying away the intense heat in the process. The heat shield has several outer coverings: a pore seal, a moisture barrier (a white reflective coating), and a silver Mylar thermal coating that looks like aluminum foil.

The heat shield varied in thickness from 2inches in the aft portion (the base of the capsule, which faced forward during reentry) to 0.5inches in the crew compartment and forward portions. The Total weight of the shield was about 3000lb.

Forward compartment

The 1feet-tall forward compartment was the area outside the inner pressure shell in the nose of the capsule, located around the forward docking tunnel and covered by the forward heat shield. The compartment was divided into four 90-degree segments that contained Earth landing equipment (all the parachutes, recovery antennas and beacon light, and sea recovery sling), two reaction control thrusters, and the forward heat shield release mechanism. At about 25000feet during reentry, the forward heat shield was jettisoned to expose the Earth landing equipment and permit deployment of the parachutes.

Aft compartment

The 1feet-tall aft compartment was located around the periphery of the command module at its widest part, just forward of (above) the aft heat shield. The compartment was divided into 24 bays containing 10 reaction control engines; the fuel, oxidizer, and helium tanks for the CM reaction control subsystem; water tanks; the crushable ribs of the impact attenuation system; and a number of instruments. The CM-SM umbilical, the point where wiring and plumbing ran from one module to the other, was also in the aft compartment. The panels of the heat shield covering the aft compartment were removable for maintenance of the equipment before flight.

Earth landing system

See also: Splashdown. The components of the ELS were housed around the forward docking tunnel. The forward compartment was separated from the central by a bulkhead and was divided into four 90-degree wedges. The ELS consisted of two drogue parachutes with mortars, three main parachutes, three pilot parachutes to deploy the mains, three inflation bags for uprighting the capsule if necessary, a sea recovery cable, a dye marker, and a swimmer umbilical.

The command module's center of mass was offset a foot or so from the center of pressure (along the symmetry axis). This provided a rotational moment during reentry, angling the capsule and providing some lift (a lift to drag ratio of about 0.368[13]). The capsule was then steered by rotating the capsule using thrusters; when no steering was required, the capsule was spun slowly, and the lift effects cancelled out. This system greatly reduced the g-force experienced by the astronauts, permitted a reasonable amount of directional control and allowed the capsule's splashdown point to be targeted within a few miles.

At 24000feet, the forward heat shield was jettisoned using four pressurized-gas compression springs. The drogue parachutes were then deployed, slowing the spacecraft to 125mph. At 10700feet the drogues were jettisoned and the pilot parachutes, which pulled out the mains, were deployed. These slowed the CM to 22mph for splashdown. The portion of the capsule that first contacted the water surface contained four crushable ribs to further mitigate the force of impact. The command module could safely parachute to an ocean landing with only two parachutes deployed (as occurred on Apollo 15), the third parachute being a safety precaution.

Reaction control system

The command module attitude control system consisted of twelve 93lbf attitude control thrusters, ten of which were located in the aft compartment, plus two in the forward compartment. These were supplied by four tanks storing 270lb of monomethylhydrazine fuel and nitrogen tetroxide oxidizer, and pressurized by 1.1lb of helium stored at 4150psi in two tanks.

Hatches

The forward docking hatch was mounted at the top of the docking tunnel. It was 30inches in diameter and weighed 80lb, constructed from two machined rings that were weld-joined to a brazed honeycomb panel. The exterior side was covered with 0.5inches of insulation and a layer of aluminum foil. It was latched in six places and operated by a pump handle. The hatch contained a valve in its center, used to equalize the pressure between the tunnel and the CM so the hatch could be removed.

The unified crew hatch (UCH) measured 29inches high, 34inches wide, and weighed . It was operated by a pump handle, which drove a ratchet mechanism to open or close fifteen latches simultaneously.

Docking assembly

Apollo's mission required the LM to dock with the CSM on return from the Moon, and also in the transposition, docking, and extraction maneuver at the beginning of the translunar coast. The docking mechanism was a non-androgynous system, consisting of a probe located in the nose of the CSM, which connected to the drogue, a truncated cone located on the lunar module. The probe was extended like a scissor jack to capture the drogue on initial contact, known as soft docking. Then the probe was retracted to pull the vehicles together and establish a firm connection, known as "hard docking". The mechanism was specified by NASA to have the following functions:

Coupling

The probe head located in the CSM was self-centering and gimbal-mounted to the probe piston. As the probe head engaged in the opening of the drogue socket, three spring-loaded latches depressed and engaged. These latches allowed a so-called 'soft dock' state and enabled the pitch and yaw movements in the two vehicles to subside. Excess movement in the vehicles during the 'hard dock' process could cause damage to the docking ring and put stress on the upper tunnel. A depressed locking trigger link at each latch allowed a spring-loaded spool to move forward, maintaining the toggle linkage in an over-center locked position. In the upper end of the lunar module tunnel, the drogue, which was constructed of 1-inch-thick aluminum honeycomb core, bonded front and back to aluminum face sheets, was the receiving end of the probe head capture latches.

Retraction

After the initial capture and stabilization of the vehicles, the probe was capable of exerting a closing force of 1000lbf to draw the vehicles together. This force was generated by gas pressure acting on the center piston within the probe cylinder. Piston retraction compressed the probe and interface seals and actuated the 12 automatic ring latches which were located radially around the inner surface of the CSM docking ring. The latches were manually re-cocked in the docking tunnel by an astronaut after each hard docking event (lunar missions required two dockings).

Separation

An automatic extension latch attached to the probe cylinder body engaged and retained the probe center piston in the retracted position. Before vehicle separation in lunar orbit, manual cocking of the twelve ring latches was accomplished. The separating force from the internal pressure in the tunnel area was then transmitted from the ring latches to the probe and drogue.In undocking, the release of the capture latches was accomplished by electrically energizing tandem-mounted DC rotary solenoids located in the center piston. In a temperature degraded condition, a single motor release operation was done manually in the lunar module by depressing the locking spool through an open hole in the probe heads, while release from the CSM was done by rotating a release handle at the back of the probe to rotate the motor torque shaft manually.[14] When the command and lunar modules separated for the last time, the probe and forward docking ring were pyrotechnically separated, leaving all docking equipment attached to the lunar module. In the event of an abort during launch from Earth, the same system would have explosively jettisoned the docking ring and probe from the CM as it separated from the boost protective cover.

Cabin interior arrangement

The central pressure vessel of the command module was its sole habitable compartment. It had an interior volume of 210ft3 and housed the main control panels, crew seats, guidance and navigation systems, food and equipment lockers, the waste management system, and the docking tunnel.

Dominating the forward section of the cabin was the crescent-shaped main display panel measuring nearly 7feet wide and 3feet tall. It was arranged into three panels, each emphasizing the duties of each crew member. The mission commander's panel (left side) included the velocity, attitude, and altitude indicators, the primary flight controls, and the main FDAI (Flight Director Attitude Indicator).

The CM pilot served as navigator, so his control panel (center) included the Guidance and Navigation computer controls, the caution and warning indicator panel, the event timer, the Service Propulsion System and RCS controls, and the environmental control system controls.

The LM pilot served as systems engineer, so his control panel (right-hand side) included the fuel cell gauges and controls, the electrical and battery controls, and the communications controls.

Flanking the sides of the main panel were sets of smaller control panels. On the left side were a circuit breaker panel, audio controls, and the SCS power controls. On the right were additional circuit breakers and a redundant audio control panel, along with the environmental control switches. In total, the command module panels included 24 instruments, 566 switches, 40 event indicators, and 71 lights.

The three crew couches were constructed from hollow steel tubing and covered in a heavy, fireproof cloth known as Armalon. The leg pans of the two outer couches could be folded in a variety of positions, while the hip pan of the center couch could be disconnected and laid on the aft bulkhead. One rotation and one translation hand controller was installed on the armrests of the left-hand couch. The translation controller was used by the crew member performing the transposition, docking, and extraction maneuver with the LM, usually the CM Pilot. The center and right-hand couches had duplicate rotational controllers. The couches were supported by eight shock-attenuating struts, designed to ease the impact of touchdown on water or, in case of an emergency landing, on solid ground.

The contiguous cabin space was organized into six equipment bays:

The CM had five windows. The two side windows measured 9inches square next to the left and right-hand couches. Two forward-facing triangular rendezvous windows measured 8inchesby9inchesin (byin), used to aid in rendezvous and docking with the LM. The circular hatch window was 9inches in diameter located directly over the center couch. Each window assembly consisted of three thick panes of glass. The inner two panes, which were made of aluminosilicate, made up part of the module's pressure vessel. The fused silica outer pane served as both a debris shield and as part of the heat shield. Each pane had an anti-reflective coating and a blue-red reflective coating on the inner surface.

Specifications

Sources:[16] [17]

Service module (SM)

Construction

The service module was an unpressurized cylindrical structure with a diameter of 12inchesft10inchesin (ftin) and 14inchesft10inchesin (ftin) long. The service propulsion engine nozzle and heat shield increased the total height to 24inchesft7inchesin (ftin).The interior was a simple structure consisting of a central tunnel section 44inches in diameter, surrounded by six pie-shaped sectors. The sectors were topped by a forward bulkhead and fairing, separated by six radial beams, covered on the outside by four honeycomb panels, and supported by an aft bulkhead and engine heat shield. The sectors were not all equal 60° angles, but varied according to required size.

On the last three lunar landing (I-J class) missions, it carried the scientific instrument module (SIM) with a powerful Itek focal length camera originally developed for the Lockheed U-2 and SR-71 reconnaissance aircraft. The camera photographed the Moon; had the S-IVB failed to fire causing the CSM to not leave earth orbit, astronauts would have used it to photograph the Earth.[18] [19] SIM also had other sensors and a subsatellite.

The forward fairing measured 1inchesft11inchesin (ftin) long and housed the reaction control system (RCS) computer, power distribution block, ECS controller, separation controller, and components for the high-gain antenna, and included eight EPS radiators and the umbilical connection arm containing the main electrical and plumbing connections to the CM. The fairing externally contained a retractable forward-facing spotlight; an EVA floodlight to aid the command module pilot in SIM film retrieval; and a flashing rendezvous beacon visible from 54nmi away as a navigation aid for rendezvous with the LM.

The SM was connected to the CM using three tension ties and six compression pads. The tension ties were stainless steel straps bolted to the CM's aft heat shield. It remained attached to the command module throughout most of the mission, until being jettisoned just prior to re-entry into the Earth's atmosphere. At jettison, the CM umbilical connections were cut using a pyrotechnic-activated guillotine assembly. Following jettison, the SM aft translation thrusters automatically fired continuously to distance it from the CM, until either the RCS fuel or the fuel cell power was depleted. The roll thrusters were also fired for five seconds to make sure it followed a different trajectory from the CM and faster break-up on re-entry.

Service propulsion system

The service propulsion system (SPS) engine was originally designed to lift the CSM off the surface of the Moon in the direct ascent mission mode,[20] The engine selected was the AJ10-137,[21] which used Aerozine 50 as fuel and nitrogen tetroxide (N2O4) as oxidizer to produce 20500adj=onNaNadj=on of thrust.[22] A contract was signed in April 1962 for the Aerojet-General company to start developing the engine, resulting in a thrust level twice what was needed to accomplish the lunar orbit rendezvous (LOR) mission mode officially chosen in July of that year.[23] The engine was actually used for mid-course corrections between the Earth and Moon, and to place the spacecraft into and out of lunar orbit. It also served as a retrorocket to perform the deorbit burn for Earth orbital flights.

The propellants were pressure-fed to the engine by 39.2ft3 of gaseous helium at 3600psi, carried in two 40inches diameter spherical tanks.[24]

The exhaust nozzle measured 152.82inches long and 98.48inches wide at the base. It was mounted on two gimbals to keep the thrust vector aligned with the spacecraft's center of mass during SPS firings. The combustion chamber and pressurant tanks were housed in the central tunnel.

Reaction control system

Four clusters of four reaction control system (RCS) thrusters (known as "quads") were installed around the upper section of the SM every 90°. The sixteen-thruster arrangement provided rotation and translation control in all three spacecraft axes. Each R-4D thruster measured 12inches long by 6inches diameter, generated 100lbf of thrust, and used helium-fed monomethylhydrazine (MMH) as fuel and nitrogen tetroxide (NTO) as oxidizer.[25] Each quad assembly measured 2.2feetby2.7feetft (byft) and had its own fuel, oxidizer, and helium tanks mounted on the inside of an 8by skin panel. The primary fuel (MMH) tank contained 69.1lb; the secondary fuel tank contained 45.2lb; the primary oxidizer tank contained 137lb, and the secondary oxidizer tank contained 89.2lb. The propellant tanks were pressurized from a single tank containing 1.35lb of liquid helium. Back flow was prevented by a series of check valves, and back flow and ullage requirements were resolved by containing the fuel and oxidizer in Teflon bladders which separated the propellants from the helium pressurant.[26]

The four completely independent RCS clusters provided redundancy; only two adjacent functioning units were needed to allow complete attitude control.

The lunar module used a similar four-quad arrangement of R-4D thruster engines for its RCS.

Electrical power system

Electrical power was produced by three fuel cells, each measuring 44inches tall by 22inches in diameter and weighing 245lb. These combined hydrogen and oxygen to generate electrical power, and produced drinkable water as a byproduct. The cells were fed by two hemispherical-cylindrical 31.75inches diameter tanks, each holding 29lb of liquid hydrogen, and two spherical 26inches diameter tanks, each holding 326lb of liquid oxygen (which also supplied the environmental control system).

On the flight of Apollo 13, the EPS was disabled by an explosive rupture of one oxygen tank, which punctured the second tank and led to the loss of all oxygen. After the accident, a third oxygen tank was added to obviate operation below 50% tank capacity. That allowed the elimination of the tank's internal stirring-fan equipment, which had contributed to the failure.

Also starting with Apollo 14, a 400 Ah auxiliary battery was added to the SM for emergency use. Apollo 13 had drawn heavily on its entry batteries in the first hours after the explosion, and while this new battery could not power the CM for more than 5–10 hours it would buy time in the event of a temporary loss of all three fuel cells. Such an event had occurred when Apollo 12 was struck twice by lightning during launch.

Environmental control system

Cabin atmosphere was maintained at 5psi of pure oxygen from the same liquid oxygen tanks that fed the electrical power system's fuel cells. Potable water supplied by the fuel cells was stored for drinking and food preparation. A thermal control system using a mixture of water and ethylene glycol as coolant dumped waste heat from the CM cabin and electronics to outer space via two 30ft2 radiators located on the lower section of the exterior walls, one covering sectors 2 and 3 and the other covering sectors 5 and 6.[27]

Communications system

Short-range communications between the CSM and LM employed two VHF scimitar antennas mounted on the SM just above the ECS radiators. These antennas were originally located on the Block I command module and performed a double function as aerodynamic strakes to stabilize the capsule after a launch abort. The antennas were moved to the Block II service module when this function was found unnecessary.

A steerable unified S-band high-gain antenna for long-range communications with Earth was mounted on the aft bulkhead. This was an array of four 31inches diameter reflectors surrounding a single 11inches square reflector. During launch it was folded down parallel to the main engine to fit inside the Spacecraft-to-LM Adapter (SLA). After CSM separation from the SLA, it deployed at a right angle to the SM.

Four omnidirectional S-band antennas on the CM were used when the attitude of the CSM kept the high-gain antenna from being pointed at Earth. These antennas were also used between SM jettison and landing.[28]

Specifications

Modifications for Saturn IB missions

The payload capability of the Saturn IB launch vehicle used to launch the Low Earth Orbit missions (Apollo 1 (planned), Apollo 7, Skylab 2, Skylab 3, Skylab 4, and Apollo–Soyuz) could not handle the 66900lb mass of the fully fueled CSM. This was not a problem, because the spacecraft delta-v requirement of these missions was much smaller than that of the lunar mission; therefore they could be launched with less than half of the full SPS propellant load, by filling only the SPS sump tanks and leaving the storage tanks empty. The CSMs launched in orbit on Saturn IB ranged from 32558lb (Apollo–Soyuz), to 46000lb (Skylab 4).

The omnidirectional antennas sufficed for ground communications during the Earth orbital missions, so the high-gain S-band antenna on the SM was omitted from Apollo 1, Apollo 7, and the three Skylab flights. It was restored for the Apollo–Soyuz mission to communicate through the ATS-6 satellite in geostationary orbit, an experimental precursor to the current TDRSS system.

On the Skylab and Apollo–Soyuz missions, some additional dry weight was saved by removing the otherwise empty fuel and oxidizer storage tanks (leaving the partially filled sump tanks), along with one of the two helium pressurant tanks.[29] This permitted the addition of some extra RCS propellant to allow for use as a backup for the deorbit burn in case of possible SPS failure.[30]

Since the spacecraft for the Skylab missions would not be occupied for most of the mission, there was lower demand on the power system, so one of the three fuel cells was deleted from these SMs. The command module was also partially painted white, to provide passive thermal control for the extended time it would remain in orbit.

The command module could be modified to carry extra astronauts as passengers by adding jump seat couches in the aft equipment bay. CM-119 was fitted with two jump seats as a Skylab Rescue vehicle, which was never used.[31]

Major differences between Block I and Block II

Command module

Service module

CSMs produced

Serial numberNameUseLaunch dateCurrent locationImage
Block I[32]
CSM-001systems compatibility test vehiclescrapped
CSM-002A-004 flightJanuary 20, 1966Command module on display at Cradle of Aviation, Long Island, New York[33]
CSM-004static and thermal structural ground testsscrapped
CSM-006used for demonstrating tumbling debris removal systemCommand module scrapped; service module (redesignated as SM-010) on display at U.S. Space & Rocket Center, Huntsville, Alabama
CSM-007various tests including acoustic vibration and drop tests, and water egress training. CM was refitted with Block II improvements.[34] Underwent testing for Skylab at the McKinley Climatic Laboratory, Eglin AFB, Florida, 1971–1973.Command module on display at Museum of Flight, Seattle, Washington[35]
CSM-008complete systems spacecraft used in thermal vacuum testsscrapped
CSM-009AS-201 flight and drop testsFebruary 26, 1966Command module on display at Strategic Air and Space Museum, adjacent to Offutt Air Force Base in Ashland, Nebraska[36]
CSM-010 Thermal test (command module redesignated as CM-004A / BP-27 for dynamic tests); service module never completedCommand module on display at U.S. Space & Rocket Center, Huntsville, Alabama
CSM-011AS-202 flightAugust 25, 1966Command module on display on the USS Hornet museum at the former Naval Air Station Alameda, Alameda, California[37]
CSM-012Apollo 1
the command module was severely damaged in the Apollo 1 fire
Command module in storage at the Langley Research Center, Hampton, Virginia;[38] three-part door hatch on display at Kennedy Space Center;[39] service module scrapped
CSM-014Command module disassembled as part of Apollo 1 investigation. Service module (SM-014) used on Apollo 6 mission. Command module (CM-014) later modified and used for ground testing (as CM-014A).[40] Scrapped May 1977.[41]
CSM-017CM-017 flew on Apollo 4 with SM-020 after SM-017 was destroyed in a propellant tank explosion during ground testing.[42] November 9, 1967Command module on display at Stennis Space Center, Bay St. Louis, Mississippi[43]
CSM-020CM-020 flew on Apollo 6 with SM-014.April 4, 1968Command module on display at Fernbank Science Center, Atlanta
Block II[44] [45]
CSM-0982TV-1 (Block II Thermal Vacuum no.1)used in thermal vacuum testsCSM on display at Academy of Science Museum, Moscow, Russia as part of the Apollo Soyuz Test Project display.
CM-0992S-1Skylab flight crew interface training; impact testsscrapped
CSM-1002S-2static structural testingCommand module "transferred to Smithsonian as an artifact", service module on display at New Mexico Museum of Space History
CSM-101Apollo 7October 11, 1968Command module was on display at National Museum of Science and Technology, Ottawa, Ontario, Canada from 1974 until 2004, now at the Frontiers of Flight Museum, Dallas, Texas after 30 years of being on loan.[46]
CSM-102Launch Complex 34 checkout vehicleCommand module scrapped; service module is at JSC on top of the Little Joe II in Rocket Park with Boiler Plate 22 command module.[47]
CSM-103Apollo 8December 21, 1968Command module on display at the Museum of Science and Industry in Chicago
CSM-104GumdropApollo 9March 3, 1969Command module on display at San Diego Air and Space Museum
CSM-105acoustic testsOn display at National Air and Space Museum, Washington, D.C. as part of the Apollo Soyuz Test Project display. (Photo)
CSM-106Charlie BrownApollo 10May 18, 1969Command module on display at Science Museum, London
CSM-107ColumbiaApollo 11July 16, 1969Command module on display at National Air and Space Museum, Washington, D.C.
CSM-108Yankee ClipperApollo 12November 14, 1969Command module on display at Virginia Air & Space Center, Hampton, Virginia; previously on display at the National Naval Aviation Museum at Naval Air Station Pensacola, Pensacola, Florida (exchanged for CSM-116)
CSM-109OdysseyApollo 13April 11, 1970Command module on display at Kansas Cosmosphere and Space Center
CSM-110Kitty HawkApollo 14January 31, 1971Command module on display at the Kennedy Space Center
CSM-111Apollo Soyuz Test ProjectJuly 15, 1975Command module currently on display at California Science Center in Los Angeles, California[48] [49] [50] (formerly displayed at the Kennedy Space Center Visitor Complex)
CSM-112EndeavourApollo 15July 26, 1971Command module on display at National Museum of the United States Air Force, Wright-Patterson Air Force Base, Dayton, Ohio
CSM-113CasperApollo 16April 16, 1972Command module on display at U.S. Space & Rocket Center, Huntsville, Alabama
CSM-114AmericaApollo 17December 7, 1972Command module on display at Space Center Houston, Houston, Texas
CSM-115Apollo 19[51] (canceled)Never fully completed – service module does not have its SPS nozzle installed. On display as part of the Saturn V display at Johnson Space Center, Houston, Texas[52]
CSM-115aApollo 20[53] (canceled)Never fully completed[54] – internal structures not installed,[55] used for spare parts. Remaining items sent to Japan for exhibition in 1978 and never returned, possibly scrapped.[56]
CSM-116Skylab 2May 25, 1973Command module on display at National Museum of Naval Aviation, Naval Air Station Pensacola, Pensacola, Florida[57]
CSM-117Skylab 3July 28, 1973Command module on display at Great Lakes Science Center, current location of the NASA Glenn Research Center Visitor Center, Cleveland, Ohio[58]
CSM-118Skylab 4November 16, 1973Command module on display at Oklahoma History Center[59] (formerly displayed at the National Air and Space Museum, Washington, D.C.)[60]
CSM-119Skylab Rescue and ASTP backupOn display at the Kennedy Space Center

See also

Footnotes

NotesCitations

Notes and References

  1. Web site: Aerojet AJ10-137 Archives. December 25, 2022 .
  2. News: Portree. David S. F.. Project Olympus (1962). 2013-09-02. Wired. 2020-02-25. 1059-1028.
  3. Web site: ch1. history.nasa.gov. January 1983 . 2020-02-25 . Compton . W. D. . Benson . C. D. .
  4. Book: Chariots for Apollo: A History of Manned Lunar Spacecraft. Courtney G Brooks . James M. Grimwood . Loyd S. Swenson . 1979. 2008-01-29. NASA. Contracting for the Command Module. http://www.hq.nasa.gov/office/pao/History/SP-4205/ch2-5.html. 0-486-46756-2. https://web.archive.org/web/20080209003722/http://www.hq.nasa.gov/office/pao/History/SP-4205/contents.html. 9 February 2008 . live.
  5. Book: Chariots for Apollo: A History of Manned Lunar Spacecraft. Courtney G Brooks . James M. Grimwood . Loyd S. Swenson . 1979. 2008-01-29. NASA. Command Modules and Program Changes. http://www.hq.nasa.gov/office/pao/History/SP-4205/ch5-1.html. 0-486-46756-2. https://web.archive.org/web/20080209003722/http://www.hq.nasa.gov/office/pao/History/SP-4205/contents.html. 9 February 2008 . live.
  6. Book: Morse . Mary Louise . Bays . Jean Kernahan . The Apollo Spacecraft: A Chronology . NASA . SP-4009II . II, Part 2(C): Developing Hardware Distinctions . September 20, 2007 . April 22, 2016 . February 5, 2008 . https://web.archive.org/web/20080205020128/http://www.hq.nasa.gov/office/pao/History/SP-4009/contents.htm#Volume_II . dead .
  7. Book: Orloff, Richard. Apollo by the Numbers. National Aeronautics and Space Administration. 1996. 22.
  8. Web site: NASA New Start Inflation Indices. National Aeronautics and Space Administration. May 23, 2016.
  9. News: Apollo 11 Press Kit . 69–83K . NASA . July 6, 1969.
  10. Web site: Margolis. Jacob. The Making Of Apollo's Command Module: 2 Engineers Recall Tragedy And Triumph . NPR.org . 16 July 2019 . 26 December 2022.
  11. Web site: Chiotakis . Steve . Mesirow. Tod. How Downey, California helped put Apollo 11 on the moon (and get the astronauts back safely) . KCRW . 15 July 2019 . 26 December 2022.
  12. Web site: CSM06 Command Module Overview pp. 39–52. National Aeronautics and Space Administration. November 1, 2016.
  13. Hillje, Ernest R., "Entry Aerodynamics at Lunar Return Conditions Obtained from the Flight of Apollo 4 (AS-501)," NASA TN D-5399, (1969).
  14. Kenneth . Bloom . The Apollo docking system . 19720005743 . . January 1, 1971.
  15. West, Robert B., Apollo Experience Report: Earth Landing System, NASA Technical Note D-7437, p. 4, November 1973.
  16. Web site: Apollo CM . https://web.archive.org/web/20161228052725/http://astronautix.com/a/apollocm.html . dead . December 28, 2016 . Astronautix.com . June 7, 2020.
  17. Book: Orloff, Richard . Apollo by the numbers : a statistical reference . National Aeronautics and Space Administration . Washington, D.C. . 2000 . 0-16-050631-X . 44775012 . 277.
  18. Web site: Day . Dwayne . 2009-05-26 . Making lemons into lemonade . 2020-07-10 . The Space Review.
  19. News: Out of the black . The Space Review . 2012-06-11 . June 11, 2012 . Day, Dwayne Allen.
  20. Book: Wilford , John . John Noble Wilford. We Reach the Moon: The New York Times Story of Man's Greatest Adventure. Bantam Paperbacks. New York. 1969. 167. 978-0552082051.
  21. Web site: Apollo CSM . Encyclopedia Astronautica . dead . https://web.archive.org/web/20071217222825/http://www.astronautix.com/craft/apolocsm.htm . 2007-12-17 .
  22. Book: Feldman . A. L. . David . Dan . Space Engineering . Design of the Apollo Service Module Rocket Engine for Manned Operation . Astrophysics and Space Science Library . 1970 . 15 . 411–425 . 10.1007/978-94-011-7551-7_30 . https://link.springer.com/chapter/10.1007/978-94-011-7551-7_30 . 20 June 2023 . Springer Netherlands . 978-94-011-7553-1 . en.
  23. Web site: Apollo CSM SPS . Encyclopedia Astronautica . dead . https://web.archive.org/web/20100201083913/http://astronautix.com/craft/csmsps.htm . 2010-02-01 .
  24. Web site: Apollo Operations Handbook, SM2A-03-Block II-(1) . Section 2.4 . NASA . https://web.archive.org/web/20130703014940/https://history.nasa.gov/afj/aohindex.htm . 3 July 2013 . live.
  25. Book: December 1971 . Apollo 11 Mission Report – Performance of the Command and Service Module Reaction Control System . https://web.archive.org/web/20220712145711/https://ntrs.nasa.gov/api/citations/19720017210/downloads/19720017210.pdf . 12 July 2022 . NASA – Lyndon B. Johnson Space Center . 4.
  26. Book: SM2A-03-BLOCK II-(1), Apollo Operations Handbook. National Aeronautics and Space Administration. 1969. 8. 13 August 2017.
  27. Web site: Apollo Operations Handbook, SM2A-03-Block II-(1) . Section 2.7 . NASA . https://web.archive.org/web/20130703014940/https://history.nasa.gov/afj/aohindex.htm . 3 July 2013 . live.
  28. Web site: Nasa CSM/LM communication.. December 20, 2016.
  29. Web site: Reduced Apollo Block II service propulsion system for Saturn IB Missions . Encyclopedia Astronautica . dead . https://web.archive.org/web/20100201055835/http://astronautix.com/details/red17167.htm . 2010-02-01 .
  30. Book: Gatland , Kenneth . Manned Spacecraft, Second Revision. Macmillan Publishing Co.. New York. 1976. 292. 0-02-542820-9 .
  31. " Mission Requirements, Skylab Rescue Mission, SL-R" NASA, 24 August 1973.
  32. Web site: A Field Guide to American Spacecraft . June 7, 2020 . February 22, 2020 . https://web.archive.org/web/20200222060626/http://americanspacecraft.com/pages/apollo/index.html . dead .
  33. Web site: Rockwell Command Module 002 at the Cradle of Aviation Museum . June 7, 2020.
  34. These included the crew couches, quick escape hatch, and metallic heat shield coating. See Apollo command module (image @ Wikimedia Commons).
  35. Web site: CM-007. A Field Guide to American Spacecraft. 22 November 2004. James H.. Gerard. June 8, 2020. January 11, 2020. https://web.archive.org/web/20200111081626/http://www.americanspacecraft.com/pages/apollo/CM-007.html. dead.
  36. Web site: Apollo Command Space Module (CSM 009) . Strategic Air Command & Aerospace Museum . 21 April 2020.
  37. Web site: Permanent Exhibits. December 8, 2015 . the Apollo Command Module – CM-011. It was used for the uncrewed mission AS-202 on August 26, 1966. USS Hornet museum. 2016-10-22.
  38. News: Burned Apollo I capsule moved to new storage facility in Hampton . Diane . Tennant . . February 17, 2007 . June 9, 2012 . October 31, 2015 . https://web.archive.org/web/20151031131339/http://hamptonroads.com/node/224831 . dead .
  39. Web site: 50 years later, NASA displays fatal Apollo capsule . The Horn News . March 13, 2019 . January 25, 2017.
  40. Web site: CSM Contract . NASA.
  41. Book: APOLLO/SKYLAB ASTP AND SHUTTLE --ORBITER MAJOR END ITEMS . NASA Johnson Space Center . 1978 . ., p. 4
  42. Web site: CSM Block I . Encyclopedia Astronautica. 10 December 1999. Mark. Wade.
  43. Web site: Apollo 4 capsule from first Saturn V launch lands at Infinity Science Center . Collectspace.com . June 7, 2020.
  44. Web site: Apollo Command and Service Module Documentation . NASA.
  45. Web site: Location of Apollo Command Modules. Smithsonian National Air and Space Museum. August 27, 2019. June 1, 2021. https://web.archive.org/web/20210601052353/https://airandspace.si.edu/explore-and-learn/topics/apollo/apollo-program/spacecraft/location/cm.cfm. dead.
  46. Web site: Apollo 7 Command Module and Wally Schirra's Training Suit Leave Science and Tech Museum After 30 Years . March 12, 2004 . Canada Science and Technology Museum . July 19, 2009 . https://web.archive.org/web/20100817120650/http://sciencetech.technomuses.ca/english/newsrel/apollo04.cfm . August 17, 2010 . dead .
  47. Web site: BP-22. A Field Guide to American Spacecraft. 11 July 2007. James H.. Gerard. June 8, 2020. January 6, 2020. https://web.archive.org/web/20200106160205/http://americanspacecraft.com/pages/apollo/bp-22.html. dead.
  48. Web site: Pearlman. Robert. Historic Apollo–Soyuz Spacecraft Gets New Display at CA Science Center. Space.com. February 23, 2018. 20 March 2018.
  49. Web site: Apollo–Soyuz Command Module. californiasciencecenter.org. 20 March 2018. August 29, 2020. https://web.archive.org/web/20200829113038/https://californiasciencecenter.org/exhibits/air-space/humans-in-space/apollo-soyuz-command-module. dead.
  50. Web site: Pearlman. Robert. Apollo–Soyuz spacecraft gets new display at CA Science Center. collectSPACE. 20 March 2018.
  51. Book: United States. Congress. House. Committee on Science and Astronautics. 1971 NASA Authorization: Hearings, Ninety-first Congress, Second Session, on H.R. 15695 (superseded by H.R. 16516). U.S. Government Printing Office. 1970. 884.
  52. News: Exploring NASA's Johnson Space Center with the cast of The Martian . Hutchinson . Lee . Ars Technica . September 19, 2015 . A close-up of the upper heat shield on CSM-115, the unfinished Apollo Block 2 command module that sits atop the Saturn..
  53. Book: Shayler, David. Apollo: The Lost and Forgotten Missions. Springer Science & Business Media. 2002. 1-85233-575-0. 271.
  54. Book: United States. Congress. House. Committee on Science and Astronautics. 1974 NASA Authorization: Hearings, Ninety-third Congress, First Session, on H.R. 4567 (superseded by H.R. 7528).. U.S. Government Printing Office. 1973. 1272.
  55. Book: United States. Congress. House. Committee on Science and Astronautics. Space Shuttle-Skylab 1973: Status Report for the Committee on Science and Astronautics . 1973 . 397.
  56. Book: United States. Congress. House. Committee on Science and Astronautics . 1979 NASA Reauthorization (Program Review) . October 1977 . 227.
  57. Web site: Item – National Naval Aviation Museum . National Naval Aviation Museum . 2015-09-05 . https://web.archive.org/web/20150905121846/http://www.navalaviationmuseum.org/attractions/aircraft-exhibits/item/?item=skylab . 2015-09-05 . dead . 2020-06-08.
  58. Web site: Skylab space capsule lands at Cleveland's Great Lakes Science Center. Liz. Navratil. Cleveland.com. June 23, 2010. April 15, 2019.
  59. Web site: McDonnell. Brandy. 17 November 2020. Oklahoma History Center celebrating 15th anniversary with free admission, new exhibit 'Launch to Landing: Oklahomans and Space'. 10 December 2020. The Oklahoman.
  60. Web site: 28 August 2020. Skylab 4 capsule to land in new exhibit at Oklahoma History Center. 10 December 2020. Collect Space.