The is the largest wind farm in Japan. It has a total capacity of 95 MW, and is located in the Aoyama Plateau, Muroo-Akame-Aoyama Quasi-National Park.
The wind farm was built in stages. The first phase consisted of 20 750 kW turbines manufactured by JFE Engineering, commissioned in 2003.These turbines have a rotor diameter of 50.5 m and a tower height of 50 m.This original site covers 10.5 hectares and produced a maximum of 15 MW.The second phase was commissioned between 2016 and 2017 and comprises an additional 40 larger 2 MW turbines with a rotor diameter of 65.4 m and a tower height of 80 m, manufactured by Hitachi.