Annanur railway station explained

Annanur
Style:Indian Railways
Type: Indian Railways and Chennai Suburban Railway station
Address:Annanur, Chennai, Tamil Nadu, India
Coordinates:13.1164°N 80.1272°W
Mapframe-Marker:rail
Mapframe-Marker-Color:
  1. FF3210
Mapframe-Zoom:14
Map State:collapsed
Owned:Ministry of Railways, Indian Railways
Line:West, West North and West South lines of Chennai Suburban Railway
Platform:2
Tracks:4
Structure:Standard on-ground station
Parking:Available
Code:ANNR
Zone:Southern Railways
Electrified:29 November 1979
Former:South Indian Railway
Passengers:20,000/day
Pass Year:2016
Mapframe:yes

Annanur railway station is one of the railway stations of the Chennai CentralArakkonam section of the Chennai Suburban Railway Network. Located about 18 km from Chennai Central railway station, the station serves the neighbourhood of Annanur, which is pronounced as 'Annanoor', a suburb of Chennai located west of the city centre. It has an elevation of 24.28 m above sea level. The station also has an EMU car shed complex located on the southern side.

History

The first lines in the station were electrified on 29 November 1979, with the electrification of the Chennai Central–Tiruvallur section. Additional lines at the station were electrified on 2 October 1986, with the electrification of the Villivakkam–Avadi section.[1]

Layout

The station has four tracks and two platforms—a side platform and an island platform. The island platform houses the ticket counter. Unlike most other suburban stations on the network, the station lack several basic passenger amenities such as macadamised road leading to the neighbourhoods. A new footover bridge (FOB) has been constructed and now in use since May 2023. But the passengers are put to hardship as all the direct approaches to the platform has been blocked due to the running of high speed train on this route.Old people and people with luggage find it very difficult. [2]

Station layout

GNorth Entrance Street levelExit/Entrance, FOB & ticket counter
PTrack 4Towards → MGR Chennai Central
Track 3Towards ← Arakkonam Junction / Jolarpettai Junction
FOB, Island platform | P2 Doors will open on the left | T3 & T4Express Lines|-| width="100" style="border-bottom:solid 1px gray;" |Platform 2| style="border-bottom:solid 1px gray;" width="500" |Towards → Chennai Central MMC next station is Thirumullaivoyal|-| width="100" style="border-bottom:solid 1px white;" |Platform 1| style="border-bottom:solid 1px white;" width="500" |Towards ← Arakkonam Junction next station is Avadi|-| colspan="2" width="100" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |FOB, Side platform | P1 Doors will open on the left|-| style="border-bottom:solid 1px gray;" width="50" valign="top" |G| style="border-bottom:solid 1px gray;" width="50" valign="top" |South Entrance Street level| style="border-bottom:solid 1px gray;" width="50" valign="top" |Exit/Entrance & ticket counter|-|}

Traffic

As of 2016, the railway station serves around 20,000 passengers every day.[3]

Road overbridge

In 2012, the state government approved the construction of a 200 m long two-lane road overbridge meant for two-wheelers and cars at a cost of 240 million.[4]

See also

External links

Notes and References

  1. Web site: IR Electrification Chronology up to 31.03.2004 . History of Electrification . IRFCA.org . 17 November 2012.
  2. See also: last = Hemalatha, first = Karthikeyan, title = Annanur residents tread on slushy no-man's road, location = Chennai, date = 16 August 2011, url = http://articles.timesofindia.indiatimes.com/2011-08-16/chennai/29892090_1_avadi-main-road-residents, archive-url = https://archive.today/20130103231503/http://articles.timesofindia.indiatimes.com/2011-08-16/chennai/29892090_1_avadi-main-road-residents, url-status = dead, archive-date = 3 January 2013, newspaper = [[The Times of India]] and access-date = 2 September 2012. }

  3. News: Annanur Seeks Attention . Ambattur Talk . Chennai . 8 . 17–23 July 2016 .
  4. News: Madhavan . D. . ROB project yet to start at Annanoor station . The Hindu . Chennai . DownTown (pp. 1, 7) . Kasturi & Sons . 27 July 2018 . 27 July 2018.