Anholt Offshore Wind Farm Explained
Anholt Offshore Wind Farm |
Status: | O |
Construction Began: | 2012 |
Commissioned: | 4 September 2013 |
Cost: | 10 billion Danish kroner |
Wind Offshore Depth: | 14- |
Wind Offshore Distance: | 21km (13miles) |
Ps Electrical Cap Fac: | 48.7 %[1] |
Anholt Offshore Wind Farm is a Danish offshore wind power wind farm in the Kattegat, between Djursland and Anholt island. With a nameplate capacity of 400 megawatts (MW), it is one of the largest offshore wind farm in the world (along with BARD Offshore 1) and was the largest in Denmark from 2013 to 2019 (when Horns Rev 3 was inaugurated). A cable from the wind farm to Anholt replaces most of the diesel-powered electricity on the island.[2]
Project
Economy
The project was conceived in February 2008, as part of the Danish government's Energy Policy Agreement.[3] The wind farm costs an estimated 10 billion Danish kroner (€1.35 bn, US$1.65 bn). During operation, DONG receives a feed-in tariff of 1.051 DKK/kW·h (17 US¢/kW·h) for the first 20 TW·h (about 12–13 years of production),[4] whereas the 207 MW Rødsand 2 receives 0.629 DKK/kW·h for 10 TW·h.[5]
DONG Energy was the only bidder for the project, and received the license to build it in 2010.[6] [7] Newsmedia and politicians suggest a tight schedule with tough sanctions as reasons for the single bid and higher price,[8] and the subsequent Horns Rev 3 offshore wind farm had 4 bidders in 2015 and costs 0.77 DKK/kW·h, well below the 105 øre at Anholt.[9]
Technology
DONG contracted Siemens Wind Power to supply 111 3.6 MW wind turbines for the project,[10] placed in water depth.[11]
A platform holds 3 transformers which increase voltage from 33 to 220 kV for transporting the alternating current power to land through a single 3-conductor cable (diameter 26cm (10inches))[12] and a further 56km (35miles)[13] to Trige (near Aarhus) where a 400 kV main power hub can distribute the power.[14] [15] There are switchyard reactors along the cable to provide reactive power to compensate for line capacitance.[16]
The agreement required first power to be produced before the end of 2012, and be fully commissioned before the end of 2013.[11] In March 2011, DONG Energy sold 50% of the Anholt wind farm to a consortium consisting of PensionDanmark (30%) and PKA (Pensionskassernes Administration, 20%) for DKK 6 billion (US$1.14 billion) payable in 4 rates between 2011 and 2013.[17] [18]
Usually, turbines are placed in a grid pattern of lines and rows. But the turbines of AOWF are placed in an unusual pattern, governed by two principles: put most of them along the edges, and put most in undisturbed airflow from the main direction, which is West-southwest. This would increase production by 1.5%, a lifetime value of more than 100m DKK.[19]
Construction
On 31 December 2011, the heavy lift vessel (HLV) Svanen placed the first foundation monopile.[20]
Official construction of the wind farm started on 13 January 2012.[21]
The first turbine was installed on 3 September and connected to the Danish power grid on 21 September.[22]
In May 2013, AOWF became Denmark's largest wind farm when 59 turbines were grid connected, totalling 212MW and surpassing Horns Rev 2. The vessel Sea Installer managed to erect a complete tower (saving time), and installed a wind turbine in 7 hours.[23]
On 19 May 2013, the installation vessel Sea Power erected the last of the 111 turbines at Anholt Offshore Wind Farm.[24]
The wind farm achieved full power in June 2013,[25] [26] and was inaugurated and commissioned on 4 September 2013.[27] [28]
Operation
The connection cable has been out of service two times; first the land cable failed for a week in 2014 costing Energinet.dk 9 million DKK in compensation to DONG. In February 2015 the sea cable failed, and Anholt island reverted to its diesel engines.[29]
, the farm has produced 4,427 GWh.[1]
See also
Notes and References
- Web site: Capacity factors at Danish offshore wind farms. 2014-09-23. energynumbers.info/. 2014-11-09.
- http://www.ens.dk/da-DK/UndergrundOgForsyning/VedvarendeEnergi/Vindkraft/Havvindmoeller/Udbudaf400MWmellemDjurslandogAnholt/Sider/Forside.aspx Anholt offshore wind farm
- Web site: Denmark launches Anholt offshore wind farm tender . Backwell . Ben . 1 May 2009 . Recharge . 23 June 2010 .
- Hanne, Windemuller. Anholt Offshore Wind Farm will be the largest in Denmark Danish Energy Agency, 2 July 2010. Accessed: 27 November 2010.
- Pia C. Jensen & Steen Hartvig Jacobsen. "Wind turbines in Denmark ", page 26. Danish Energy Agency, November 2009. Accessed: 4 September 2013.
- Web site: Anholt - tender of 400MW . Danish Energy Agency . 23 June 2010 . dead . https://web.archive.org/web/20101020151443/http://www.ens.dk/en-US/supply/Renewable-energy/WindPower/offshore-Wind-Power/anholt_tender/Sider/Forside.aspx . 20 October 2010 .
- Web site: Dong gets green light for 400MW Anholt despite high prices . Bjartnes . Anders . 22 June 2010 . Recharge . 23 June 2010 . https://web.archive.org/web/20100628104053/http://www.rechargenews.com/energy/wind/article218455.ece. 28 June 2010 . live.
- Erik Holm & Sanne Wittrup. "We should learn from Anholt" (in Danish) Ingeniøren, 8 April 2010. Accessed: 4 September 2013.
- Wittrup, Sanne. "Svenske Vattenfall skal bygge Danmarks næste havmøllepark " Ingeniøren, 26 February 2015. Accessed: 26 February 2015.
- Web site: Siemens Wins 111 Offshore Wind-Turbine Order in Denmark From Dong Energy . van Loon . Jeremy . 22 June 2010 . . 23 June 2010 .
- Web site: Djursland Anholt . 4C Offshore Limited . 2010-06-23.
- Kvarts, Thomas. About the seacable (in Danish) Energinet.dk. Accessed: 27 November 2010.
- Kvarts, Thomas. About the landcable (in Danish) Energinet.dk. Accessed: 27 November 2010.
- Damgaard, Poul. About the transformator platform (in Danish) Energinet.dk, 20 August 2010. Retrieved: 24 October 2010.
- Gaardestrup, Rikke Bille. Connection of offshore wind farm Anholt Energinet.dk, 30 November 2009. Retrieved: 24 October 2010.
- Web site: Nettilslutning af havmøller ved Anholt. Energinet.dk. 26 November 2012. 27 March 2017. https://web.archive.org/web/20170328022303/http://www.anlaegsrapport.dk/2012_2013/eltransmission/Sider/Nettilslutningafhavm%C3%B8llervedAnholt.aspx. 28 March 2017. dead.
- Web site: PensionDanmark and PKA to become co-owners of Denmark's largest offshore wind . 28 March 2011 . DONG Energy . 30 March 2011 .
- Pedersen, Lars Dalsgård. DONG sells half of Anholt wind farm Energy Supply, 28 March 2011. Accessed: 10 December 2011.
- Sanne Wittrup. "Bonus for new pattern of turbines" (in Danish) Ingeniøren, 2 May 2011. Accessed: 4 September 2013.
- Web site: Anholt Offshore Wind Farm Newsletter, January 2012 . January 2012 . . 16 January 2012 . dead . https://web.archive.org/web/20120610093441/http://www.dongenergy.com/anholt/EN/News/anholt_nyheder/News/Pages/AnholtOffshoreWindFarm-Newsletter-January2012.aspx . 10 June 2012 .
- Today we start construction of Anholt Offshore Wind Farm . 13 January 2012 . DONG Energy . 16 January 2012 . dead . https://web.archive.org/web/20131005000129/http://www.dongenergy.com/EN/Media/Newsroom/News/Pages/Today-westartconstructionofAnholtOffshoreWindFarm.aspx . 5 October 2013 .
- First power from Anholt offshore wind farm . 21 September 2012 . DONG Energy . 24 September 2012 . dead . https://web.archive.org/web/20131005023026/http://www.dongenergy.com/anholt/EN/News/anholt_nyheder/News/Pages/FirstpowerfromAnholtoffshorewindfarm.aspx . 5 October 2013 .
- http://www.dongenergy.com/anholt/EN/News/anholt_nyheder/News/Pages/AnholtOffshoreWindFarm-Newsletter-May2013.aspx Newsletter-May2013
- All turbines are erected at Anholt Offshore Wind Farm . https://archive.today/20130629013813/http://www.dongenergy.com/anholt/EN/News/anholt_nyheder/News/Pages/AllturbinesareerectedatAnholtOffshoreWindFarm.aspx . dead . 29 June 2013 . 15 May 2013 . DONG Energy . 3 June 2013 .
- All turbines at Anholt Offshore wind farm now operational . 20 June 2013 . . 27 August 2013 . dead . https://web.archive.org/web/20131006224732/http://www.dongenergy.com/anholt/EN/News/anholt_nyheder/News/Pages/AllturbinesatAnholtoffshorewindfarmnowoperational.aspx . 6 October 2013 . dmy .
- http://www.4coffshore.com/windfarms/anholt-denmark-dk13.html Anholf Offshore wind farm in 4C Offshore
- Jan Bjerre Lauridsen & Søren Andersen. "Queen says Good Wind to giant turbines" (in Danish) Berlingske, 4 September 2013. Accessed: 4 September 2013.
- "VIPs cut ribbon at 400MW Anholt" Recharge News, 4 September 2013. Accessed: 4 September 2013.
- Wittrup, Sanne. "Fejl på søkabel stopper Anholt Havmøllepark i tre uger " Ingeniøren, 23 February 2015. Accessed: 23 February 2015.