Angle Lake station explained

 Angle Lake
Style:Sound Transit
Type:Link light rail station
Address:28th Avenue South & South 200th Street
Borough:SeaTac, Washington
Country:United States
Coordinates:47.4228°N -122.2975°W
Connections:King County Metro (RapidRide A Line, 635)
Structure:Elevated
Platform:1 island platform
Tracks:2
Levels:2
Parking:1,160 spaces (garage and surface)
Bicycle:Racks and lockers
Accessible:Yes
Owned:Sound Transit
Passengers: daily weekday boardings (2023)
1,374,276 total boardings (2023)[1]
Other Services Header:Future service
Other Services Collapsible:yes
Mapframe:yes
Mapframe-Custom:
Shape:none
Line:none
Marker:rail-light
Zoom:15

Angle Lake station is a Link light rail station in SeaTac, Washington. The elevated station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, and North Seattle, including the University of Washington. It also includes a large parking garage for passengers.

The station was built as part of the South 200th Link Extension project, extending the light rail line south from its terminus at SeaTac Airport via a 1.6adj=midNaNadj=mid elevated guideway. The project was originally approved by voters in the 1996 "Sound Move" ballot measure, with a promise to open in 2006, but was deferred when funding was not found. The 2008 "Sound Transit 2" campaign was approved with funding for the station and extension, estimated to open in 2020; federal grants were obtained to accelerate design and construction, moving up the opening date to late 2016.

The station was originally referred to as the South 200th Street station, but was officially named for the nearby lake in December 2012 by the Sound Transit Board. Construction on the extension began in May 2013 and on the station in September 2014; the project was budgeted at $383 million. Angle Lake station opened to the public on September 24, 2016.

Location

Angle Lake station is located above the intersection of South 200th Street and 28th Avenue South in SeaTac, southeast of the Seattle–Tacoma International Airport and a block west of International Boulevard (State Route 99). The elevated station spans South 200th Street on the west side of 28th Avenue South, with two entrances on each side of the street.

The eponymous Angle Lake is located northeast of the station, with a public park on the lake's western shore accessible via International Boulevard. To the west of the station, the Des Moines Creek Trail connects the area to Des Moines via a 2.5adj=midNaNadj=mid gravel trail.[2]

Transit-oriented development

Angle Lake station is located in an area consisting of single-family homes, apartment buildings, retail spaces, office buildings, airport parking lots and hotels;[3] a population of approximately 3,886 people live within a NaNmiles radius of the stations. The area is home to a Federal Detention Center, the corporate headquarters of Alaska Airlines, and several hotels that provide a majority of the estimated 7,459 jobs.[4] [5]

In July 2015, the city of SeaTac adopted a station area plan to direct potential transit-oriented development in a 171acres around the station. The plan determined that much of the vacant land near the station has great potential for development, excluding right-of-way reserved for a future freeway extension of State Route 509. The plan recommended allowing buildings over five stories tall and amenities for non-motorized transportation (bicycles and pedestrians) for the city government to consider in a zoning code update.[6]

History

The earliest proposal for a light rail station near Angle Lake came from the Puget Sound Council of Governments in 1986, as part of a north–south line from Lynnwood to Federal Way.[7] [8] A regional transit authority (RTA) was formed in the early 1990s to study a regional light rail system, first proposing a $6.7 billion plan in 1995 that included a light rail station at Angle Lake as part of a line between Downtown Seattle, Seattle–Tacoma International Airport, and Tacoma.[9] The proposal was rejected by voters in March 1995, and the RTA presented a smaller proposal the following year. The second proposal, called "Sound Move", selected a station at South 200th Street in SeaTac as the southern terminus of a light rail line traveling north through the Rainier Valley to Downtown Seattle and the University of Washington campus; it was approved by voters in November 1996 and was scheduled to open in 2006.[10] [11] [12]

The RTA, later re-branded as Sound Transit, selected an elevated alignment for the station in 1999 and added a park and ride facility.[13] A series of budgeting troubles led to the line being truncated to South 154th Street in Tukwila, 1miles north of the airport, in late 2001; the cost of extending the $2.1 billion line to the airport and South 200th Street was estimated to be $350 to $450 million.[14] An extension to the airport was eventually approved in 2006 and opened in December 2009, a few months after the initial line from Seattle to Tukwila.[15] [16]

The South 200th Street station was reorganized as a part of a $1.4 billion, 4.3miles light rail extension from Sea-Tac Airport to the Highline College area to open by 2021,[17] which was put on the 2007 Roads and Transit ballot measure.[18] [19] The ballot measure failed, in part because of its reliance on road expansion.[20] A smaller, transit-only ballot measure known as "Sound Transit 2" was approved by voters in November 2008, including a light rail extension to Redondo/Star Lake to open by 2023.[21] [22]

Sound Transit began exploring means to accelerate the construction of the South 200th Street station in 2010, using federal grants to align the opening with the University Link Extension in 2016 and provide additional parking capacity to supplement Tukwila International Boulevard station.[3] In December 2010, amid a tax revenue shortfall during the ongoing economic recession, the Sound Transit Board elected to suspend all design work on the light rail project south of South 200th Street.[23] [24] The Sound Transit Board officially approved an accelerated schedule for the South 200th Street station in July 2011, seeking a federal Transportation Investment Generating Economic Recovery (TIGER) grant of up to $34 million;[25] a $10 million grant was awarded in December, allowing the opening date for the station to move from 2020 to September 2016.[26]

PCL Construction was awarded the $169 million design-build contract for the extension and the station in September 2012.[27] The station was given a new name, "Angle Lake" after a nearby lake, in December as the extension and station were undergoing final design.[28]

Construction on the extension began after a groundbreaking ceremony held on April 26, 2013,[29] using 1,166 crane-lifted hollow concrete segments that are cinched together to make bridge spans on the 1.6miles elevated guideway.[30] [31] A $30 million design-built contract was awarded to Harbor Pacific/Graham in February 2014 to design and construct Angle Lake station's 1,050-stall parking garage and plaza.[32] Construction of the station and garage began in September 2014.[33] During construction, several nearby businesses complained of lost revenue from blocked access and vibrations from work causing minor damage; they sought compensation from Sound Transit, but the claims were not awarded because of a potential violation of the state constitution regarding illegal gifting of public funds.[34]

Train testing began in July 2016,[35] and the station opened to the public on September 24, 2016.[36] The opening day celebration was sponsored by Alaska Airlines, whose headquarters are in the area, and had its budget cut back after criticism of the agency's costlier celebrations at the University Link opening in March.[37] Construction of the station and extension was $40 million under the $383 million project budget.[38]

By January 2017, the station was attracting an average of over 2,500 passengers per day, with the garage reaching 93 percent occupancy.[39] Sound Transit expects that Angle Lake station will have an average of 5,400 weekday boardings by the end of 2018.[40] [41] Angle Lake will remain as the line's southern terminus until 2026, when an extension to Federal Way is planned to open.[42] [43]

Station layout

Platform
level
Northbound
Northbound
Street levelEntrance/Exit, ticket vending machines, parking garage

Angle Lake station consists of a single island platform elevated above street level, on the west side of 28th Avenue South. The station has two entrances located on the north and south sides of South 200th Street, connected to the platform by stairs, escalators and elevators.[44] The station also has secure bicycle storage facilities.[41]

The station has 1,160 total parking spots,[45] primarily contained within a 1,050-stall, seven-story parking garage northwest of the platform that also includes a kiss-and-ride facility.[46] Both are connected to the station via a covered walkway and public plaza.[40] [30] The public plaza between the station and garage was designed by Brooks + Scarpa, after being selected during a design competition.[47] [48] The station also has a 70-stall surface parking lot, storage for 52 bicycles in racks and lease-able lockers, and four charging stations for electric vehicles.[49]

The garage has 2500square feet of retail space at ground level, with room to support future transit-oriented development on the west side.[6] The retail space was converted into The Roadhouse, a local music venue, in October 2023 as part of a year-long public art pilot.[50] The garage has three entrances from various streets that connect to different parking levels.

The station was designed by VIA Architecture,[51] with a theme of "Environment in Motion" to be embodied in environmentally-friendly features and artwork.[52] The U.S. Green Building Council awarded Leadership in Energy and Environmental Design (LEED) Gold certification to Sound Transit for the design of Angle Lake station.[53] A 50-kilowatt solar power system is installed on top of the pedestrian walkway and garage, while 60 additional solar panels on the station platform's canopy provide 14 kilowatts of power. The landscaping surrounding the station uses harvested rainwater for irrigation.[54]

Art

Angle Lake station also houses two art installations as part of the "STart" program, which allocates a percentage of project construction funds to art projects to be used in stations.[55] Laura Haddad's Cloud is the station's most prominent feature and is suspended over the elevated platform as it crosses South 200th Street. The 48adj=midNaNadj=mid, 26adj=midNaNadj=mid sculpture consists of 6,000 small colored acrylic disks that reflect sunlight in ways dependent on variations in light, weather or an approaching train; at night, the disks are illuminated with LED floodlights that fade from orange to blue as trains approach the station.[56] Haddid describes her sculpture as a "community landmark" and "sculptural barometer of local weather".[46] [57] Jill Anholt's Immerse is embedded in the plaza's grand staircase and consists of four "delicate arcs" made of curved steel and tubing that connect the garage and station.[58] Anholt's piece uses the arcs to filter light onto the parking area and "celebrates the process of falling rain".[52] [59]

The station's pictogram depicts a rainbow trout, the state fish and one that is stocked in Angle Lake. It was created by Christian French as part of the Stellar Connections series and its points represent nearby destinations.[59]

Services

Angle Lake station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, the University of Washington campus, and Northgate. It is the eighteenth southbound station from Northgate, and is situated after SeaTac/Airport station. 1 Line trains serve Angle Lake twenty hours a day on weekdays and Saturdays, from 5:00 am to 1:00 am, and eighteen hours on Sundays, from 6:00 am to 12:00 am; during regular weekday service, trains operate roughly every six to ten minutes during rush hour and midday operation, respectively, with longer headways of fifteen minutes in the early morning and twenty minutes at night. During weekends, 1 Line trains arrive and depart Angle Lake station every ten minutes during midday hours and every fifteen minutes during mornings and evenings. The station is approximately four minutes from SeaTac and 40 minutes from Westlake station in Downtown Seattle.[60] In 2019, an average of 3,772 passengers boarded Link trains at Angle Lake station on weekdays. Between 2016 and 2017, fourth quarter boardings increased by 25 percent, attributed to riders switching from SeaTac/Airport station.[61]

King County Metro operates two routes in the vicinity of Angle Lake station. The RapidRide A Line provides frequent bus service on International Boulevard between Federal Way Transit Center and the Tukwila International Boulevard light rail station.[62] The bus stops northbound and southbound at South 200th Street, to the east of the light rail station.[63] Since 2018, the station has also served as the terminus for Route 635, a shuttle bus serving business parks and the downtown area of Des Moines Monday through Saturday.[64]

External links

Notes and References

  1. Web site: Link Ridership . Sound Transit . February 1, 2024.
  2. February 2012 . South King County Parks & Trails Map . . August 24, 2016 . live . https://web.archive.org/web/20160812165206/http://www.desmoineswa.gov/DocumentCenter/View/32 . August 12, 2016 . mdy-all.
  3. News: Lindblom . Mike . June 11, 2010 . Sound Transit wants to extend light rail south sooner . B2 . . August 24, 2016 . live . https://web.archive.org/web/20160825030758/http://old.seattletimes.com/html/localnews/2012084240_lightrail11m.html . August 25, 2016 . mdy-all.
  4. Web site: Growing Transit Communities Oversight Committee . October 2013 . Angle Lake: Future Light Rail/Bus Rapid Transit/Bus . The Growing Transit Communities Strategy . . August 24, 2016.
  5. News: Lindblom . Mike . July 27, 2016 . Light rail's Angle Lake Station in SeaTac nears the finish line . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20160822115230/http://www.seattletimes.com/seattle-news/transportation/angle-lake-station-in-seatac-near-the-finish-line/ . August 22, 2016 . mdy-all.
  6. July 2015 . Angle Lake District Station Area Plan . City of SeaTac . August 25, 2016 . live . https://web.archive.org/web/20170201142720/http://ci.seatac.wa.us/Modules/ShowDocument.aspx?documentid=11306 . February 1, 2017 . mdy-all.
  7. . Federal Way Transit Extension: Plan Review for High-Capacity Transit in the Project Corridor: S. 200th Street to Federal Way City Center . LRT Trunk Route Schematic . 1986 . 22 . dead . https://web.archive.org/web/20141107221736/http://www.soundtransit.org/Documents/pdf/projects/fwte/Outreach/201211_Previous%20Studies_Nov2012.pdf . November 7, 2014 . August 24, 2016 . mdy.
  8. Book: 1986 . Summary Report, Multi-Corridor Project . Seattle, Washington . Puget Sound Council of Governments . 15608855.
  9. Web site: February 1995 . The Regional Transit System Proposal . 3–4 . Central Puget Sound Regional Transit Authority . August 24, 2016 . dead . https://web.archive.org/web/20150930200958/http://www.soundtransit.org/sites/default/files/documents/pdf/projects/planning/1995_plan_subarea_proposals.pdf . September 30, 2015 . mdy-all.
  10. Web site: Sound Move: Launching a Rapid Transit System for the Puget Sound Region . 22 . May 31, 1996 . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160304065157/http://www.soundtransit.org/sites/default/files/documents/pdf/news/reports/soundmove/199605_soundmovethetenyearregionaltransitsystemplan.pdf . March 4, 2016 . mdy-all.
  11. News: Schaefer . David . November 6, 1996 . Voters back transit plan on fourth try . A1 . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20160303215211/http://community.seattletimes.nwsource.com/archive/?date=19961106&slug=2358535 . March 3, 2016 . mdy-all.
  12. Web site: July 1996 . The Original 1996 Sound Move Plan . Sound Transit . April 2, 2016 . live . https://web.archive.org/web/20160416160614/http://www.soundtransit.org/About-Sound-Transit/News-and-events/Reports/Sound-Move/Sound-Move---the-ten-year-regional-transit-system-plan/Electric-light-rail . April 16, 2016 . mdy-all.
  13. November 18, 1999 . Sound Transit Board achieves historic milestone by selecting route for central Link light rail . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160303220828/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/Sound-Transit-Board-achieves-historic-milestone-by-selecting-route-for-central-Link-light-rail . March 3, 2016 . mdy-all.
  14. News: Garber . Andrew . September 28, 2001 . Shorter light-rail line OK'd - Controversial route stops short of Sea-Tac . A1 . The Seattle Times.
  15. News: Lindblom . Mike . September 23, 2006 . Construction under way for airport rail link . B2 . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20161005182821/http://www.seattletimes.com/seattle-news/construction-under-way-for-airport-rail-link/ . October 5, 2016 . mdy-all.
  16. December 19, 2009 . Sound Transit opens Link light rail service to SeaTac . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160203203335/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/Airport-Link-Station-Opening-Ceremony . February 3, 2016 . mdy-all.
  17. 2007 . Roads & Transit . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828173831/http://www.soundtransit.org/sites/default/files/documents/pdf/projects/planning/roadstransit_map.pdf . August 28, 2016 . mdy-all.
  18. May 24, 2007 . Sound Transit 2, Making Connections: The Regional Transit System Plan for Central Puget Sound . Appendix A: Detailed Description of Facilities and Estimated Costs . A-11 . http://www.soundtransit.org/sites/default/files/documents/pdf/st2/appd_a_08_07.pdf . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828174040/http://www.soundtransit.org/sites/default/files/documents/pdf/st2/appd_a_08_07.pdf . August 28, 2016 . mdy-all.
  19. News: Lindblom . Mike . October 18, 2007 . Some context for Proposition 1's big brochure . B3 . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20161005224254/http://www.seattletimes.com/seattle-news/politics/some-context-for-proposition-1s-big-brochure/ . October 5, 2016 . mdy-all.
  20. News: Lindblom . Mike . November 29, 2007 . Prop. 1 too big, costly to pass, survey finds . B3 . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20160826095650/http://community.seattletimes.nwsource.com/archive/?date=20071129&slug=transpopoll29m . August 26, 2016 . mdy-all.
  21. News: Lindblom . Mike . November 6, 2008 . How transit supporters closed deal with voters . A1 . The Seattle Times . August 24, 2016 . dead . https://web.archive.org/web/20160924130344/http://old.seattletimes.com/html/lightrailinitiative/2008357499_soundtransit06m.html . September 24, 2016 . mdy-all .
  22. Web site: November 20, 2008 . Sound Transit: What you'll pay, what you'll get . The Seattle Times . August 24, 2016 . live . https://web.archive.org/web/20161006030536/http://old.seattletimes.com/flatpages/local/2008proposition1guide.html . October 6, 2016 . mdy-all.
  23. Web site: December 16, 2010 . Sound Transit Motion No. M2010-102 . Sound Transit . August 24, 2016 . dead . https://web.archive.org/web/20160604151446/http://www.soundtransit.org/sites/default/files/documents/pdf/about/board/motions/2010/Motion_M2010-102.pdf . June 4, 2016 . mdy-all.
  24. December 16, 2010 . ST Board adopts 2011 budget, sets path for delivering major expansion . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828172041/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/ST-Board-adopts-2011-budget . August 28, 2016 . mdy-all.
  25. July 28, 2011 . Sound Transit expedites South 200th Street light rail extension . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828172029/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/S-200th-light-rail-extention-expedited . August 28, 2016 . mdy-all.
  26. December 14, 2011 . Sound Transit receives $10 million TIGER grant for South 200th street light rail extension project . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828172805/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/TIGER-grant-1214 . August 28, 2016 . mdy-all.
  27. September 27, 2012 . Sound Transit selects PCL to design and build South 200th Link light rail extension . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828173752/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/PCL-selected-to-design-and-construct-South-200th-Link-light-rail-extension- . August 28, 2016 . mdy-all.
  28. December 21, 2012 . Sound Transit sets name for South 200th Link Extension light rail station . Sound Transit . April 12, 2013 . live . https://web.archive.org/web/20130425004418/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/Name-set-for-South-200th-Link-ext . April 25, 2013 . mdy-all.
  29. News: Stiles . Marc . April 24, 2013 . Sea-Tac Airport light-rail extension construction starts Friday . . January 29, 2016 . live . https://web.archive.org/web/20160817040544/http://www.bizjournals.com/seattle/news/2013/04/24/new-video-shows-how-light-rail-will.html . August 17, 2016 . mdy-all.
  30. News: Lindblom . Mike . July 13, 2015 . Angle Lake light-rail station might open earlier than fall 2016 . The Seattle Times . January 29, 2016 . live . https://web.archive.org/web/20160308082631/http://www.seattletimes.com/seattle-news/transportation/angle-lake-light-rail-station-might-open-earlier-than-fall-2016/ . March 8, 2016 . mdy-all.
  31. News: Lindblom . Mike . April 27, 2013 . Work starting on extension of Link light rail from airport to new Angle Lake Station . B4 . dead . https://web.archive.org/web/20150922174509/http://blogs.seattletimes.com/today/2013/04/work-starting-on-extension-of-link-light-rail-from-airport-to-new-angle-lake-station/ . September 22, 2015 . The Seattle Times . August 24, 2016 . mdy.
  32. February 27, 2016 . Sound Transit awards contract for South 200th Link Extension parking garage . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160828173343/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/Sound-Transit-awards-contract-for-South-200th-Link-Extension-parking-garage--22714 . August 28, 2016 . mdy-all.
  33. September 24, 2014 . Construction begins on elevated station, parking garage for South 200th Link Extension . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160825043938/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/News-release-archive/construction-begins-on-S-200th . August 25, 2016 . mdy-all.
  34. News: Lindblom . Mike . March 26, 2016 . Light-rail construction is damaging small businesses, owners say . The Seattle Times . August 25, 2016 . live . https://web.archive.org/web/20160826001159/http://www.seattletimes.com/seattle-news/transportation/angle-lake-light-rail-work-is-damaging-businesses-owners-say/ . August 26, 2016 . mdy-all.
  35. News: Green . Josh . July 27, 2016 . Light rail south of airport under budget, ahead of schedule . . August 24, 2016 . live . https://web.archive.org/web/20160826190011/http://www.king5.com/news/local/light-rail-south-of-airport-closer-to-a-reality/282844770 . August 26, 2016 . mdy-all.
  36. News: Pittman . Travis . September 24, 2016 . Angle Lake light rail station opens . . September 26, 2016 . live . https://web.archive.org/web/20160925143342/http://www.king5.com/news/traffic/angle-lake-light-rail-station-opens-saturday/324729184 . September 25, 2016 . mdy-all.
  37. News: Ryan . John . September 26, 2016 . Angle Lake light rail station opens to party — and protest . . September 27, 2016 . live . https://web.archive.org/web/20160927223331/http://kuow.org/post/angle-lake-light-rail-station-opens-party-and-protest . September 27, 2016 . mdy-all.
  38. News: September 26, 2016 . Sound Transit begins light-rail service to Angle Lake . . September 27, 2016 . live . https://web.archive.org/web/20160927224630/http://www.rtands.com/index.php/passenger/sound-transit-begins-light-rail-service-to-angel-lake.html?channel . September 27, 2016 . mdy-all.
  39. News: Lindblom . Mike . January 13, 2017 . Transit riders flock to new Angle Lake light-rail station; parking spaces nearly full . The Seattle Times . January 13, 2017 . live . https://web.archive.org/web/20170114015919/http://www.seattletimes.com/seattle-news/transportation/transit-riders-flock-to-new-angle-lake-station-park-and-ride-spaces-nearly-full/ . January 14, 2017 . mdy-all.
  40. Web site: South 200th Link Extension . Sound Transit . January 29, 2016 . dead . https://web.archive.org/web/20160204195759/http://www.soundtransit.org/s200thstreet . February 4, 2016 . mdy-all.
  41. News: Demay . Daniel . August 24, 2016 . Sound Transit: Angle Lake light rail station to open Sept. 24 . . August 24, 2016 . live . https://web.archive.org/web/20160825140859/http://www.seattlepi.com/local/transportation/article/Sound-Transit-Angle-Lake-light-rail-station-to-9182789.php . August 25, 2016 . mdy-all.
  42. January 27, 2017 . Sound Transit Board selects alignment, profile and stations for Federal Way Link Extension . Sound Transit . September 8, 2017 . live . https://web.archive.org/web/20170909101818/https://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/sound-transit-board-selects-alignment-profile-and . September 9, 2017 . mdy-all.
  43. News: Lindblom . Mike . May 26, 2023 . Wetlands bridge adds delay and $72 million to light-rail project . The Seattle Times . October 24, 2023.
  44. News: August 24, 2016 . Sound Transit's new Angle Lake Station scheduled to open on Sept. 24 . SeaTac Blog . September 2, 2016 . live . https://web.archive.org/web/20160831103528/http://seatacblog.com/2016/08/24/sound-transits-new-angle-lake-station-scheduled-to-open-on-sept-24/ . August 31, 2016 . mdy-all.
  45. Web site: Angle Lake Station . Sound Transit . September 27, 2023.
  46. Web site: Angle Lake Station Tour . Sound Transit . https://web.archive.org/web/20160826000016/http://www.anglelake2016.org/station-tour . August 26, 2016 . August 25, 2016.
  47. News: Rosenfield . Karissa . April 8, 2014 . Brooks + Scarpa Designs Park-And-Ride Plaza for Seattle Rail Station . . August 24, 2016 . live . https://web.archive.org/web/20160913234812/http://www.archdaily.com/494478/brooks-scarpa-designs-park-and-ride-plaza-for-seattle-rail-station . September 13, 2016 . mdy-all.
  48. Web site: Angle Lake Light Rail Station . ArchEcology LLC . August 24, 2016 . live . https://web.archive.org/web/20161003194758/http://www.archecology.com/portfolio/angle-lake-light-rail-station/ . October 3, 2016 . mdy-all.
  49. September 23, 2016 . Light rail to Angle Lake begins tomorrow . Sound Transit . September 27, 2016 . live . https://web.archive.org/web/20160926004843/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/light-rail-angle-lake-begins-tomorrow-092316 . September 26, 2016 . mdy-all.
  50. News: Ahmad . Nimra . October 24, 2023 . All-ages music venue to open at the Angle Lake light-rail station . . October 24, 2023.
  51. Web site: Angle Lake Station, SeaTac, WA . VIA Architecture . August 24, 2016 . live . https://web.archive.org/web/20160825052152/http://www.via-architecture.com/project/angle-lake-station/ . August 25, 2016 . mdy-all.
  52. Web site: August 31, 2016 . Environment in motion at Angle Lake Station . Sound Transit . September 2, 2016 . live . https://web.archive.org/web/20160902200936/http://www.soundtransit.org/Rider-Community/Rider-news/environment-motion-angle-lake-station . September 2, 2016 . mdy-all.
  53. July 13, 2017 . Angle Lake light rail station achieves LEED Gold certification . Sound Transit . July 14, 2017 . live . https://web.archive.org/web/20170715005920/https://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/angle-lake-light-rail-station-achieves-leed-gold . July 15, 2017 . mdy-all.
  54. Web site: September 25, 2014 . More parking and cool eco-designs underway at South 200th . Sound Transit . August 25, 2016 . live . https://web.archive.org/web/20160826000742/http://www.soundtransit.org/Rider-Community/Rider-news/More-parking-and-cool-eco-designs-underway-at-South-200th . August 26, 2016 . mdy-all.
  55. Web site: STart Public Art Program . dead . Sound Transit . https://web.archive.org/web/20100612175542/http://soundtransit.org/Projects-Home/STart-Public-Art-Program.xml . June 12, 2010 . August 25, 2016.
  56. August 24, 2016 . Light rail service to Angle Lake starts Sept. 24 . Sound Transit . August 24, 2016 . live . https://web.archive.org/web/20160827022847/http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/light-rail-service-angle-lake-starts-sept-24 . August 27, 2016 . mdy-all.
  57. Web site: Cloud . Haddad-Drugan . August 25, 2016 . live . https://web.archive.org/web/20160825234523/http://www.haddad-drugan.com/cloud/ . August 25, 2016 . mdy-all.
  58. Web site: October 8, 2015 . Sound Transit Motion No. M2015-95 . Sound Transit . August 25, 2016 . live . https://web.archive.org/web/20160828183412/http://www.soundtransit.org/sites/default/files/Motion%20M2015-95_1.pdf . August 28, 2016 . mdy-all.
  59. Web site: 2016 . Guide to art on Link light rail . Sound Transit . September 5, 2016 . live . https://web.archive.org/web/20160906031239/http://www.soundtransit.org/sites/default/files/2016_start-on-link-map.pdf . September 6, 2016 . mdy-all.
  60. Web site: October 2021 . Link 1 Line (Northgate — Angle Lake) schedule . Sound Transit . live . https://web.archive.org/web/20211002135848/https://www.soundtransit.org/sites/default/files/documents/schedule-link-light-rail.pdf . October 2, 2021 . October 5, 2021.
  61. Web site: February 22, 2018 . Q4 2017 Service Delivery Quarterly Performance Report . . February 22, 2018 . dead . https://web.archive.org/web/20180223000017/https://www.soundtransit.org/sites/default/files/2017-q4-service-delivery-performance-report.pdf . February 23, 2018 . mdy-all.
  62. . October 2, 2010 . RapidRide A Line . August 24, 2016 . live . https://web.archive.org/web/20170126210253/http://metro.kingcounty.gov/travel-options/bus/rapidride/a-line/pdf/rapidride_a_Line_map.pdf . January 26, 2017 . mdy-all.
  63. News: Lindblom . Mike . September 23, 2016 . Angle Lake light-rail station opens Saturday with party . B3 . The Seattle Times . September 27, 2016 . live . https://web.archive.org/web/20160926094036/http://www.seattletimes.com/seattle-news/transportation/angle-lake-station-opens-saturday-with-celebration/ . September 26, 2016 . mdy-all.
  64. News: Lindblom . Mike . January 31, 2018 . Cure for parking overload? Shuttle experiment begins from Des Moines to Angle Lake light-rail station . The Seattle Times . January 31, 2018 . live . https://web.archive.org/web/20180201080040/https://www.seattletimes.com/seattle-news/transportation/cure-for-parking-overload-shuttle-experiment-begins-from-des-moines-to-angle-lake/ . February 1, 2018 . mdy-all.