Anand Nagar | |
Type: | Mumbai Metro station |
Style: | Mumbai Metro |
Address: | Anand Nagar, Dahisar East, Mumbai, Maharashtra 400068 |
Coordinates: | 19.2572°N 72.8651°W |
Structure: | Elevated, Double track |
Platform: | 2 (2 side platform) |
Operator: | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) |
Tracks: | 2 |
Parking: | No |
Owned: | Mumbai Metropolitan Region Development Authority (MMRDA) |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Anand Nagar is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located on New Link Road in Dahisar, Mumbai. This station is managed by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.[1] [2]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4] The station was originally named Upper Dahisar. The MMRDA renamed the station as Anand Nagar in March 2022 based on demands from local residents.[5]
Anand Nagar was opened to the public on 2 April 2022, along with the first phase of Line 2A.[6] [7]
L1 Platforms | |||
Platform 2 | toward Andheri West (Kandarpada) → | ||
Platform 1 | ← toward Dahisar East (terminus) | ||
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover | |
G | Street level | Exit/Entrance |
Like all other stations and railways of Mumbai metro, Anand Nagar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.