Amdjarass Wind Farm | |
Country: | Chad |
Location: | Amdjarass, Ennedi-Est |
Status: | O |
Commissioned: | 2016 |
Wind Site Usage: | electricity generation |
Ps Units Operational: | 4 X 275 kW |
Ps Electrical Capacity: | 1.1 MW |
The Amdjarass Wind Farm is a 1.1 MW wind farm in Amdjarass, Ennedi-Est, Chad. It is the first wind farm in the country.
The wind turbines were erected in February 2016. It was then followed by the installation of its energy storage systems, generators and transmission line.[1] The wind farm was finally commissioned by end of 2016, making it the first wind farm in Chad.[2]
The wind farm consists of four 275 kW wind turbines.[2] It was constructed by Vergnet.[1] [3]