Alto Rabagão Dam Explained

Alto Rabagão Dam
Name Official:Barragem do Alto Rabagão
Location Map:Portugal
Coordinates:41.7395°N -7.8576°W
Location:municipality Montalegre, Vila Real District, Portugal
Purpose:Power, water supply
Status:O
Construction Began:1957
Opening:1964
Owner:Companhia Portuguesa de Produção de Electricidade
Dam Type:Concrete arch and gravity dam
Dam Crosses:Rabagão River
Dam Height Foundation:94m (308feet)
Dam Length:1970m (6,460feet)
Dam Elevation Crest:880m (2,890feet)
Dam Volume:1117000m2
Spillway Type:Over the dam
Spillway Capacity:500m2
Res Capacity Total:568690000m2
Res Capacity Active:557920000m2
Res Surface:22.12km2
Res Elevation:880m (2,890feet)
Plant Name:Alto Rabagão Power Plant
Plant Coordinates:41.7103°N -7.9169°W
Plant Operator:Energias de Portugal
Plant Commission:1964
Plant Type:Pumped-storage
Plant Hydraulic Head:185m (607feet) (max)
Plant Turbines:2 x 36.75 MW reversible Francis-type
Plant Capacity:68 MW
Plant Annual Gen:85.2 GWh

Alto Rabagão Dam (Portuguese: Barragem do Alto Rabagão|links=no) is a concrete dam on the Rabagão River, a left tributary of the Cávado River. It is located in Peneda-Gerês National Park, in the municipality Montalegre, in Vila Real District, Portugal.

Construction of the dam began in 1957. The dam was completed in 1964. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). The dam is used for power production.

Dam

Alto Rabagão Dam is a 94 m tall (height above foundation) and 1,970 m long concrete dam, which is composed of an arch dam in the center and gravity dams on both sides. Its crest altitude is 880 m. The volume of the dam is 1,117,000 m³. The dam contains a crest spillway with 2 gates (maximum discharge 500 m³/s) and a bottom outlet (maximum discharge 360 m³/s).

Reservoir

At full reservoir level of 880 m (maximum flood level of 880.1 m) the reservoir of the dam has a surface area of 22.12 km² and its total capacity is 568.69 mio. m³. Its active capacity is 557.92 (550 or 550.1) mio. m³. Minimum operating level is 829 m. With the 550.1 mio. m³ water 973.1 GWh can be produced.

Power plant

The pumped-storage hydroelectric power plant went operational in 1964. It is owned by CPPE, but operated by EDP. The plant has a nameplate capacity of 68 (72) MW. Its average annual generation is 85.2 (83 95 or 97) GWh.

The power station is located downstream and contains 2 reversible Francis turbine-generators with 36.75 MW (45 MVA), each in an underground powerhouse. The turbine rotation is 428 rpm. The minimum hydraulic head is 129 m, the maximum 185 m. Maximum flow per turbine is 25.7 m³/s. When pumping, each of the pumps has a maximum energy consumption of 31.7 MW and can pump 18 m³/s. The pumps are operated independently of the Francis turbines.

As lower reservoir for Alto Rabagão the reservoir of Venda Nova Dam is used.