Alstom Metropolis Saint-Laurent Explained

Alstom Metropolis Saint-Laurent
Interiorimage:File:Réseau Express Métropolitain (inauguration) 15.jpg
Interiorcaption:Interior of Alstom Metropolis Saint-Laurent
Service:2023–present
Manufacturer:Alstom
Assembly:Sri City, Andhra Pradesh, India
Family:Metropolis
Yearconstruction:2019–2021
Numberbuilt:212 carriages (106 units)
Formation:2-car units, 1–2 units per train
Capacity:
  • 64 seated / 390 maximum (2-car)
  • 128 seated / 780 maximum (4-car)
Operator:Groupe PMM (Alstom and SNC-Lavalin)
Depots:Brossard
Carbody:Stainless steel
Trainlength: per unit
Carlength: over coupler faces
Height: (excluding pantograph)
Doors:3 per side, per car
Wheeldiameter:840– (new–worn)
Wheelbase:
Maxspeed: (design)
(service)[1]
Weight:, 2 units
Traction Motors:Alstom 4LCA 2138[2] (4 × each)
Poweroutput:
  • per car
  • per unit
Collectionmethod:Pantograph
Uicclass:Bo′Bo′+Bo′Bo′ (one unit)
Bogies:Alstom B23[3]
Brakes:Air
Safety:Fully automated (GoA4) using Alstom Urbalis 400 moving block CBTC
Coupling:Dellner
Seating:Longitudinal
Notes:[4]

The Alstom Metropolis Saint-Laurent is a type of light metro train built by Alstom for the Réseau express métropolitain. Part of the Alstom Metropolis family, the initial order consisted of 106 two-car trains that were built in Sri City, India. The trains are fully automated (GoA4) with no driver or attendant on board the train. Trains run as a single two-car train at quieter times and as paired four-car trainsets during rush hour.

History

Procurement

In June 2016, CDPQ Infra launched a public tender for "Rolling Stock, Systems and Operation and Maintenance Services" ("Fourniture du Matériel Roulant, de Systèmes de conduite automatique et de Services d'Exploitation et de Maintenance" (MRSEM) in French).[5] [6] This contract would include the delivery of rolling stock, automatic signalling, a control centre for the line, as well as operation and maintenance for a period of 30 years.[7]

Following a pre-qualification phase, CDPQ Infra announced on 10 November 2016, that three companies and consortia could place a bid:[8]

On 8 February 2018, CDPQ Infra announced that Groupe des Partenaires pour la Mobilité des Montréalais (Alstom and SNC-Lavalin O&M) had been selected for the $2.8-billion MRSEM contract,[9] [10] with the contract award taking place in April 2018. As part of the contract, Alstom would deliver 212 Alstom Metropolis cars, forming 106 two-car trains.

Design and construction

In 2018, a public consultation took place regarding the external design of the trains. Three designs were offered, inspired by Mount Royal, Expo 67 and the Champlain Bridge.[11] [12] The final design was unveiled in March 2019, with the Saint-Laurent design chosen by the public, with front lights inspired by the Champlain Bridge.[13] [14]

Alstom announced the trains would be manufactured at their Sri City plant in India, as manufacturing the trains in India allowed them to offer a lower price.[15] This decision drew backlash in Quebec due to the lack of local content requirements.[16]

The Coalition Avenir Québec (CAQ) provincial party was among those who desired at least parts of the contract to be awarded to Bombardier Transportation's factory in La Pocatière, Quebec, instead of to Alstom.[17] Leader of CAQ François Legault criticised the government for not supporting Quebec industry, and stated that at least 25 percent of the contract should have had Quebec content, similar to provisions in Ontario. Premier Philippe Couillard argued that CDPQ Infra were awarding the contracts for the project, not the government.[18] Alstom argued that over 65 percent of the $2.8-billion contract value would be spent in Quebecincluding platform screen doors, a control centre and 30 years of operation and maintenance.

Completed trains were transported from India to Montreal by ship, with the first arriving in October 2020.[19] They were first unveiled in November 2020.[20] [21] Initial trains delivered had quality issues;[22] however, CDPQ Infra reported by December 2021 that the issues had been resolved.[23] By November 2021, 37 of the 106 trains had been delivered and trains were undergoing testing.[24], 87 of the 106 trains had been delivered.[25]

Entry into service

The Alstom Metropolis Saint-Laurent[26] entered service on 31 July 2023, with the opening of the first five stations of the REM network.[27] [28] In April 2024, CDPQ Infra announced that they would run two-car trains on weekends and other off-peak periods instead of four-car trains, thereby reducing energy consumption and wear on the vehicles.[29]

Features

Each two-car train seats 64 passengers, with standing capacity for around 300. A four-car trainset can carry a maximum of 780 people at rush hour.[30] The livery is white, grey, and bright green, matching the REM logo.

The trains have large front windows, allowing passengers to take in views from the front of the train.[31] A dedicated space for wheelchair users is available, and the trains features WiFi, air conditioning and heated floors. CDPQ Infra indicated it is "confident that the trains... will be able to withstand... winter conditions", with the trains featuring double glazing, ice scraping pantographs and heated automatic couplings.[32] [33]

The trains use Alstom's Urbalis 400 communications-based train control signalling system that ensures trains are capable of driving and operating automatically at all times without a driver or attendant on board. The system controls doors, handles obstacle detection and deals with emergency situations.[34]

The trains are operated and controlled at the Centre d'entretien et de contrôle du REM, close to Brossard station. The trains are also maintained at the Brossard facility. When the REM is completed, light maintenance and storage of the trains will also take place at a facility in Deux-Montagnes.[35]

Comparison with Montreal Metro trains

Compared to the Azur trains used on the Montreal Metro, the REM trains use steel wheels rather than rubber tires, are 17 percent wider, are fasterwith a top speed of 100km/h on the Champlain Bridgeand are fully automated. However, the REM trains are shorter and can carry fewer passengers per trainset, although the REM has the ability to increase capacity to meet demand. The REM trains are also exposed to the weather, unlike the fully underground metro system.

See also

Notes and References

  1. Web site: Mon excursion à bord du REM . L'actualité . Grescoe . Taras . July 14, 2024.
  2. Web site: Alstom Motors Catalogue 2015 – English . . 4 November 2023 . https://web.archive.org/web/20180627005859/http://www.alstom.com/Global/Transport/Resources/Documents/brochure2014/Alstom%20Motors%20Catalogue%202015%20-%20English.pdf . 27 June 2018.
  3. Web site: Alstom Bogies Catalogue 2015 – English . . 4 November 2023 . https://web.archive.org/web/20150921232307/http://www.alstom.com/Global/Transport/Resources/Documents/brochure2014/Alstom%20Bogies%20Catalogue%202015%20-%20English.pdf?epslanguage=en-GB . 21 September 2015.
  4. Web site: Rolling stock . REM . 8 October 2022.
  5. Web site: 28 June 2016 . Ingénierie, Approvisionnement et Construction des infrastructures du Réseau Électrique Métropolitain de Montréal . Engineering, Procurement and Construction of Infrastructure "Réseau Électrique Métropolitain" of Montréal . dead . https://web.archive.org/web/20160822195410/https://www.cdpqinfra.com/sites/all/files/document/appel-de-qualification_01-7001_iac.pdf . 22 August 2016 . 21 October 2016 . fr.
  6. Web site: 28 June 2016 . Fourniture du Matériel Roulant, de Systèmes et de Services d'Exploitation et de Maintenance du Réseau Électrique Métropolitain de Montréal . Supply of rolling stock, Systems and Services Operation and Maintenance of "Réseau Électrique Métropolitain" from Montreal . dead . https://web.archive.org/web/20160823023252/https://www.cdpqinfra.com/sites/all/files/document/appel-de-qualification_01-8001_mrsem.pdf . 23 August 2016 . 21 October 2016 . fr.
  7. Web site: 12 April 2018 . Alstom-led consortium to provide complete driverless light metro system for Montreal . 18 May 2023 . Alstom . en.
  8. Web site: 10 November 2016 . Appel de qualification : résultats . Call for qualifications: results . dead . https://web.archive.org/web/20161112084008/https://www.cdpqinfra.com/sites/all/files/document/annexe_1_fr.pdf . 12 November 2016 . 11 November 2016 . fr.
  9. Web site: Main partners . 1 March 2018 . REM.info.
  10. Web site: 8 February 2018 . REM: les offres finales des soumissionnaires déposées aujourd'hui . New timetable, new route and new name for the REM . 8 February 2018 . fr.
  11. Web site: 2018 . Consultation on the REM design . 2024-05-02 . REM . en.
  12. Web site: 2018-07-12 . Consultation on the REM design . 2024-05-02 . rem.info . en.
  13. Web site: 2019-03-29 . Discover the REM's metro cars . 2024-05-02 . rem.info . en.
  14. Web site: 1 April 2019 . Reveal of Alstom's Metropolis vehicle for Greater Montreal's Réseau express métropolitain . 18 May 2023 . Alstom . en.
  15. News: Anand . N. . 2020-12-12 . Alstom’s India unit keeps metro trains across the globe rolling . 2024-04-25 . The Hindu . en-IN . 0971-751X.
  16. News: 12 April 2018 . Les trains du REM seront construits en Inde . REM trains will be built in India . 30 January 2024 . Radio-Canada . fr.
  17. News: 22 February 2018 . La CAQ renégocierait le contrat du REM . The CAQ would renegotiate the REM contract . 30 January 2024 . Radio-Canada . fr.
  18. Web site: 15 February 2018 . Pas de seuil de contenu québécois pour le REM : Couillard se défend . No Quebec content threshold for the REM: Couillard defends himself . Radio-Canada . fr.
  19. Web site: Arrival of the first REM cars October 2020 REM . 18 May 2023 . rem.info.
  20. Web site: 16 November 2020 . The first REM car unveiled in Montreal . 18 May 2023 . Alstom . en.
  21. Web site: 17 November 2020 . First REM light metro trainset unveiled in Montréal . 18 May 2023 . Railway Gazette International . en.
  22. News: Gerbet . Thomas . Leiser . Mathiew . Gacon . Alexis . 12 November 2021 . Défauts, risques de blessures : les trains du REM ne sont « pas au niveau attendu » . Defects, risk of injury: REM trains are “not at the expected level” . 25 April 2024 . . fr.
  23. News: Tomesco . Frédéric . 14 Dec 2021 . REM rail cars will be delivered on time with initial flaws fixed: Alstom . 25 April 2024 . Montreal Gazette.
  24. Web site: 17 November 2021 . Follow-up on cars and dynamic tests REM . 18 May 2023 . rem.info.
  25. Web site: September 2023 . Update Réseau express métropolitain Media presentation September 2023 . 4 October 2023 . Réseau express métropolitain . 7 . 86 trains out of a total of 106 have already been delivered.
  26. Web site: Stang . Ron . 10 August 2021 . Montreal REM light rail system moves toward summer 2022 debut . 6 May 2023 . Trains.com . The REM’s Saint-Laurent equipment is based on Alstom’s Metropolis platform.
  27. News: 7 July 2023 . Le REM ouvert au public le 31 juillet . The REM opened to the public on July 31 . 7 July 2023 . La Presse . fr.
  28. News: Magder . Jason . 28 July 2023 . And they're off: REM starts shuttling people across Montreal area . 31 July 2023 . Montreal Gazette.
  29. Web site: 2024-04-18 . REM to deploy shorter trains during off-peak periods . 2024-04-25 . CTV Montreal . en.
  30. Web site: Riga . Andy . 21 March 2023 . Montreal's much-delayed REM almost ready to roll, officials say . 18 May 2023 . . en-CA.
  31. Web site: 16 November 2020 . Five things to keep in mind regarding REM cars . 8 October 2022 . rem.info.
  32. Web site: 19 March 2019 . REM trains will withstand Montreal winters, planners promise . 18 May 2023 . . en-CA . “We’re very confident that the trains we ordered will be able to withstand our winter conditions,” said Mack Tall, the president and chief executive officer for CDPQ Infra, which is managing the project..
  33. Web site: 2023-11-09 . The REM And The Challenges Of Winter . 2024-04-26 . rem.info . en.
  34. Web site: 16 November 2020 . Montreal Unveils first Alstom REM Car . 2024-04-25 . www.metro-magazine.com.
  35. News: Lampron . Alexandre . 24 July 2020 . Le cerveau du REM sera situé sur la Rive-Sud . The brain of the REM will be located on the South Shore . 25 April 2024 . Reflet . fr.