Alstom APS explained

Alstom APS, also known as Alimentation par Sol or Alimentation Par le Sol (which literally means "feeding via the ground"), is a form of ground-level power supply for street trams and, potentially, other vehicles. APS was developed by Innorail, a subsidiary of Spie Enertrans, but was sold to Alstom when Spie was acquired by Amec. It was originally created for the Bordeaux tramway, which began construction in 2000 and opened in 2003.[1] From 2011, the technology has been used in a number of other cities around the world.

APS is used, primarily for aesthetic reasons, as an alternative to overhead lines. As such, it competes with other ground-level power supply systems but also with energy storage systems such as batteries. In 2015, Alstom developed a derivative of APS, Alstom SRS (Système de Recharge statique par le sol or static-based ground charging system), which can be used to recharge battery powered trams and buses while they are stationary at stops.[2]

Alstom further developed the APS system for use with buses and other vehicles. The system has been tested for safety when the road is cleared by snowplows, under exposure to snow, ice, salting, and saturated brine, and for skid and road adherence safety for vehicles, including motorcycles. Alstom will trial its electric road system (ERS) on the public road RN205 in the Rhône-Alpes region between 2024 and 2027. The system is expected to supply 500kW of power for electric heavy trucks, as well as power for road utility vehicles and electric cars.

Technology

APS uses a third rail placed between the running rails that is divided electrically into 11 m segments that automatically switch on and off according to whether a tram is passing over them, thereby eliminating risk to other road users.[3] Each tram has two power collection shoes, next to which are antennas that send radio signals to energise the power rail segments as the tram passes over them. At any time, two consecutive segments under the tram will be live.

APS is different from the conduit current collection system, which was one of the first ways of supplying power to a tram system, as the latter involves burying a third and fourth rail in an underground conduit or trench between the running rails. Conduit current collection was used in historic tram systems in Washington, Manhattan, Paris, Berlin, Marseilles, Vienna, Budapest and London. It fell into disuse because overhead wires proved much less expensive and troublesome for street railways.[4]

Safety

Unlike the track-side third rail that is used by most metro trains and some main-line railways, APS poses no danger to people or animals and so can be used in pedestrian areas and city streets.[3] The French government reports no electrocutions or electrification accidents on any tramway in France from as early as 2003 until as recently as December 31, 2020.

Uses

Bordeaux

Conduit current collection systems were used in the late 1800s and early 1900s in several major cities, among them Bordeaux, but they posed maintenance issues and road safety issues. The Bordeaux conduit systems remained among the last in operation until being decommissioned in 1958. For decades, conduit systems were not reintroduced because they didn't meet modern safety standards. The first ground-level power supply system developed to modern safety standards was the Ansaldo Stream, although Alstom APS was the first to be commercially implemented in 2003. This success led to a proliferation of commercial implementations of ground-level power supply systems.

Construction of the new, catenary-free tramway started in February 2000. In May 2000 a contract was signed with Alstom for the supply of the tram fleet, and in October the first track was laid. Construction and testing continued through 2001 to 2003, and the first section of the tramway opened on 21 December 2003 in the presence of President Jacques Chirac, and the mayor of Bordeaux, Alain Juppé. The newly open section, known as line A, ran from Lormont-Lauriers and La Morlette, to Mériadeck.[5]

Other cities

SystemCityCountryOpenedComments
Angers tramwayAngersFrance2011[6] [7]
Reims tramwayReimsFrance2011
Orléans tramwayOrléansFrance2012[8]
Tours tramwayToursFrance2013[9]
Dubai TramDubaiUnited Arab Emirates2014The system is fully equipped with APS over its entire passenger route length and thus trams do not use their pantographs unless they are travelling within the depot area.[10]
VLT CariocaRio de JaneiroBrazil2016The system mainly uses APS, but where that was deemed impractical, the trams employ Alstom's proprietary supercapacitor-based energy storage system.[11]
CBD and South East Light RailSydneyAustralia2019The system uses APS within the Sydney CBD and conventional overhead wires elsewhere.[12]
Cuenca tramCuencaEcuador2020The system uses APS in certain regions only and conventional overhead wires elsewhere.[13]
Istanbul T5 tramwayIstanbulTurkey2021[14]
Lusail TramLusailQatar2022The system uses APS on the above ground sections, with around 19 km of APS.[15]

Standardization

Alstom, Elonroad, and other companies in 2020 began drafting a standard for ground-level power supply electric roads. A working group of the French Ministry of Ecology considers rail ground-level power supply technology to be the most likely candidate for electric roads. The first standard for electrical equipment on board a vehicle powered by a rail electric road system (ERS), CENELEC Technical Standard 50717, has been approved in late 2022. The following standards, encompassing "full interoperability" and a "unified and interoperable solution" for ground-level power supply, are scheduled to be published by the end 2024, detailing complete "specifications for communication and power supply through conductive rails embedded in the road".

Notes and References

  1. News: Third-rail trams across the Garonne. Railway Gazette International. 2004-02-01. 2008-05-02. 2010-04-26. https://web.archive.org/web/20100426115224/http://www.railwaygazette.com/news/single-view/view/10/third-rail-trams-across-the-garonne.html. dead.
  2. Web site: Alstom transfers tram power supply technology to buses. Rail Insider. September 26, 2019. November 29, 2020. 29 November 2020. live. https://web.archive.org/web/20201129165355/https://www.railinsider.co.uk/2019/09/26/alstom-transfers-tram-power-supply-technology-to-buses/.
  3. Web site: APS: Service-proven catenary-free tramway operations. Alstom. November 29, 2020. November 29, 2020. live. https://web.archive.org/web/20201129173728/https://www.alstom.com/our-solutions/infrastructure/aps-service-proven-catenary-free-tramway-operations.
  4. Book: Post, Robert C.. Urban Mass Transit: The Life Story of a Technology. limited. Greenwood Press. 2007. 45–47. 978-0-313-33916-5.
  5. Web site: Phase 1: 2000 - 2004 . fr . Bordeaux Métropole . 2020-12-06 . 2020-12-06 . live . https://web.archive.org/web/20201206231107/https://www.bordeaux-metropole.fr/Grands-projets/Grands-projets-mobilite/Tramway/Phase-1-2000-2004.
  6. News: Reims and Angers choose APS. 1 August 2006. Railway Gazette International.
  7. News: Angers tram opens. 29 June 2011. Railway Gazette International. 29 November 2020. 13 October 2011. https://web.archive.org/web/20111013021813/http://www.railwaygazette.com/nc/news/single-view/view/angers-tram-opens.html. dead.
  8. Catenary-Free Tramway Systems: Functional and Cost–Benefit Analysis for a Metropolitan Area. Springer Nature Switzerland AG.. 23 November 2019. 10.1007/s40864-019-00118-y. Guerrieri. Marco. Urban Rail Transit. 5. 4. 289–309. 208953068. free. 11572/246245. free.
  9. News: Tours selects Citadis and APS. Railway Gazette International. 2010-09-14. 2020-11-29. 2012-09-25. https://web.archive.org/web/20120925221900/http://www.railwaygazette.com/news/urban-rail/single-view/view/tours-selects-citadis-and-aps.html. dead.
  10. News: Al Safouh tram project consortium selected. Railway Gazette International. 2008-04-29. 2008-05-02.
  11. News: Alstom opens Rio's tramway ready for the 2016 Olympic Games.. Wright. Sarah. 2017-11-04. en.
  12. Web site: CBD and South East Light Rail improvements to deliver a better service for customers | Transport for NSW. https://web.archive.org/web/20141214174608/http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers. 2014-12-14. dead. December 2, 2014.
  13. News: First Cuenca tram on its way. UK. DVV Media. Railway Gazette. 2017-11-04. en. 2017-11-07. https://web.archive.org/web/20171107004013/http://www.railwaygazette.com/news/single-view/view/first-cuenca-tram-on-its-way.html. dead.
  14. Web site: Istanbul opens first section of Golden Horn tramway. August 9, 2021. Railway Gazette International. en.
  15. Web site: January 10, 2022 . Lusail Tramway enters commercial service . 2022-12-03 . Alstom . en . 19 km of APS in at grade sections (ground power supply).