Aleko Hydro Power Plant | |
Location: | Aleko Konstantinovo |
Coordinates: | 42.1192°N 24.2889°W |
Owner: | NEK EAD |
Status: | O |
Th Fuel Primary: | Hydropower |
Ps Units Operational: | 3 |
Ps Electrical Capacity: | 71.4 MW |
The Aleko Hydro Power Plant is an active hydroelectric project near Aleko Konstantinovo, Bulgaria, which is part of the Batak Hydropower Cascade.[1] It has 3 individual Francis turbines with an installed capacity of 71.4 MW of power.