Bridge Name: | Adomi Bridge |
Other Name: | Volta Bridge |
Official Name: | Adomi Bridge |
Carries: | National Route N2 |
Crosses: | Volta River, downstream of the Akosombo Dam |
Locale: | Atimpoku, Eastern Region, Ghana |
Design: | silver crescent arch bridge with deck suspended from arch |
Maint: | Ghana Highway Authority |
Designer: | Sir William Halcrow & Partners |
Contracted Designer: | William Brown of Freeman Fox & Partners |
Mainspan: | 2450NaN0 |
Length: | 3340NaN0 |
Width: | 11.90NaN0 |
Traffic: | 2 lanes of vehicular traffic |
Builder: | Dorman Long (Bridge and Engineering) Ltd |
Fabricator: | Cleveland Bridge & Engineering Company |
Begin: | March 1955 |
Complete: | January 1957 |
Cost: | 682 thousand British pounds |
Map Type: | Ghana |
Map Relief: | yes --> |
Coordinates: | 6.2394°N 0.0956°W |
The Adomi Bridge (originally the Volta Bridge) is a latticed steel arch suspension bridge crossing the Volta River at Atimpoku in Ghana in West Africa. It is the first permanent bridge to span the Volta River, which drains south into the Gulf of Guinea, and is Ghana's longest suspension bridge. It provides the main road passage, just south of the Akosombo Dam, between the Eastern Region and the Volta Region of Ghana. It was opened in 1957 by Kwame Nkrumah, Ghana's first president. The iconic crescent-shaped arch bridge is featured in Ghanaian stamps and currency.
In 1953 (before the independence of Ghana in 1956 from British colonial rule), the decision was made to build a bridge across the Volta River to replace the overloaded ferry service at Senchi where delays were occasionally up to a few days. Reconnaissance indicated a good site for a single-span crossing about 800 ft long at a narrow neck of the river at Adomi, about 2.5 miles upstream of the ferry and closer to the then-projected dam and power station in the Volta River Project. Several sketch designs for an arch bridge or a suspension bridge at Adomi and other sites were drawn and cost estimates were developed. The Standing Development Committee chose the single-span arch at Adomi.[1]
In Fall 1953 the consulting engineers were appointed: Sir William Halcrow & Partners were the project administrators and designed all approach roads and spans, while Freeman Fox & Partners were to design the single-span arch bridge. A year later, tenders were invited for the complete project, including approach roads, the arch bridge and approach spans. By January 1955, the contracts were settled and some construction staff began to arrive on site. Dorman Long (Bridge and Engineering) Ltd was the main construction contractor and Cleveland Bridge & Engineering Company was the steelwork fabricator. Work on the bridge began in March 1955, with the steel parts being prefabricated in the United Kingdom, while concrete works for the approach spans and the bridge abutments were carried out on site. The prefabricated parts were fully welded, but almost all on-site steelwork erections were designed as bolted connections, including those of the upper and lower chord of the crescent-shaped arch. The concrete carriageway was built after the steelwork was completed for the arch and the deck. By January 1957 the project was substantially completed. The total cost of the completed project was 682 thousand British pounds.
The single-span arch bridge was designed by William Brown of the engineers' Freeman Fox & Partners. It is a two-hinged silver latticed steel crescent-shaped arch bridge with a two-lane road deck suspended by cables.[2] The lower-chord arch rises 158.5feet above the hinges and the main span is 805feet long. To make an aesthetically pleasing crescent-shaped arch, the lower curve formed by the lower chords is a parabola, and the upper curve is derived from it by offsets decreasing logarithmically from the center to the hinges.
As the roadbed is suspended by means of vertical cable stays (hangers) connected to the steel truss arch, the bridge can be considered as a hybrid arch suspension type.[3] Pairs of vertical cables or hangers are attached at 35-ft intervals to the deck transverse beams, which, along with six longitudinal stringer beams and bracers in between the transverse beams, support the weight of the roadway and its load.
The bridge was officially opened on 25 January 1957 by Kwame Nkrumah, then Prime Minister of the Gold Coast and first President of Ghana.[4] It carries the National Route N2 and has been of tremendous help to travelers and traders who use the road to access the east and north regions of Ghana.
The Adomi Bridge is located in Atimpoku in the Eastern Region of Ghana, which is along the Volta River. The bridge carries National Route N2 and connects parts of the Eastern Region and Juapong in the North Tongu District, Ho, Hohoe, and other towns in the Volta Region. A trip from the northern regions of Ghana on N2 would go through the eastern corridor and finally use the Adomi Bridge to cross the Volta River. The bridge is about 87km (54miles) northeast of Accra, the capital of Ghana, and about 75km (47miles) north of the port of Tema.[5]
In April 2019, Adomi Bridge was classified as a tourist site after a consensus between the Asuogyaman District, Ghana Highway Authority and Ghana Tourism Development Company (GTDC).[12]