Carmichael coal mine explained

Carmichael coal mine
Pushpin Map:Queensland
Coordinates:-22.05°N 169°W
Place:Isaac Region, Queensland
Country:Australia
Products:Thermal coal
Type:Open-pit
Owner:Bravus Mining & Resources, an Adani Group subsidiary

The Carmichael coal mine is a coal mine in Queensland, Australia, owned by the Adani Group's Australian subsidiary Bravus Mining & Resources. It was approved by the government in 2014 and has been operational since December 2021. The mine was initially planned to produce 60 million tonnes of coal per year; however, funding difficulties resulted in downsizing the planned mine to produce 10 million tonnes per year. Construction of the mine started in June 2019, and on 29 December 2021 the first coal shipment from the Carmichael Mine was ready for export.

The mine has drawn criticism for its environmental impacts on the Great Barrier Reef, water usage, and carbon emissions, leading to a campaign known as Stop Adani. It has been dogged by legal issues relating mainly to the environmental aspects. Other contentious issues are its claimed economic benefits, financial viability, and use of taxpayer funding.

History

The mine was announced in 2010, initially with a forecast mining duration of 90 years, which was later reduced to 60 years.[1] The federal government approved the project in July 2014. Associated works included new port terminals and seabed dredging at the Abbot Point, and it was planned to dump the drudge on land.[2] The coal was planned to be transported by rail (including the Goonyella railway line) to the ports at Hay Point and Abbot Point.[3]

However, the approval was set aside in August 2015, when the Federal Court of Australia found that environment minister Greg Hunt did not correctly follow requirements under Environment Protection and Biodiversity Conservation Act 1999 regarding the yakka skink and ornamental snake endangered species.[4] This led to considerable controversy and the project was re-approved in October 2015.[5]

The mine was initially planned to produce 60 million tonnes of coal per year; however, funding difficulties resulted in downsizing the planned mine to produce 10 million tonnes per year.[6] [7]

In June 2019 Adani Australia commenced construction of the Carmichael mine.[8] The company aims to be starting commercial-scale coal mining by the end of 2021.[9] Mine approvals and construction were delayed by campaigns run by Traditional Owners and environmentalists, which included non-violent direct action at the construction site.[10]

The thermal coal produced by the mine was predicted to consist of 11% ash and have a weighted average value of 5,000–5,500 kcal/kg.[11]

In November 2020, Adani changed the name of its Australian subsidiary, which operates the mine, from Adani Mining to Bravus Mining & Resources.[12]

The company was the "jersey sleeve" sponsor of the North Queensland Cowboys NRL rugby league team for the 2021 season.[13]

On 29 December 2021, the first coal shipment from the Carmichael Mine was ready for export.[14] [15]

Location

The mine is located in Central Queensland, with the majority of the site being within the Isaac Region and a small portion being within the Charters Towers Region.[16]

The coal was formed as part of the Galilee Basin, a 247,000 square kilometre inland region which includes aquifers that are a part of the Great Artesian Basin underground fresh water source.[17] Mining operations currently consist of small-scale barite, bentonite, calcite, gypsum; limestone, opals; phosphate and potassium mines; there is no history of coal mining of the basin.[18]

Mine and associated facilities

The mine is intended to be an open-cut mine (compared with earlier designs which also included underground mines)[19] with 2790NaN0 of land being excavated. The total area of the mine site is planned to be 4470NaN0.[20]

The original plan included a new 388km (241miles) long standard-gauge railway,[21] [22] which was proposed to be paid for by taxpayers.[23] [24] In September 2018, Adani announced that it had abandoned plans to build the standard-gauge line in favour of a 2000NaN0 extension to a nearby existing narrow-gauge railway. This railway is planned to connect the mine to the maritime freight terminal at Abbot Point[25] and construction began in mid-2020.[26] Construction of the approximately 200km Carmichael Rail Network was completed in September 2021.[27]

In January 2020, in response to protests in Berlin by Extinction Rebellion, Siemens announced it would re-evaluate its $20m contract to supply signalling systems for the rail link,[28] but decided to continue with the contract saying there was "practically no legally and economically responsible way to unwind the contract without neglecting fiduciary duties."[29]

The fly-in fly-out (FIFO) workers for the mine during the construction phase were based in the regional cities of Rockhampton and Townsville.[30] A new airstrip close to the mine was proposed to be constructed, at a cost to taxpayers of $31 million[31] to $34 million.[32] Following public criticisms and the project delays, government funding for the proposed airstrip was cancelled[33] and the airstrip was paid for by Adani. Flights to the airstrip began in June 2020.[34]

The subcontract for the construction of a railway line to the mine was signed in 2020.[35] [36] The company stated that it had approximately 2000 employees in November 2020[37] and approximately 2600 employees in June 2021.[38]

The Bravus subsidiary Bowen Rail Company operates the coal trains on the Carmichael Rail Network.[39]

Environmental impacts

Greenhouse gas emissions

According to the environmental impact statement, the mine was expected to produce 200 million tonnes of carbon dioxide, based on a 60-year lifespan.[40]

In April 2019, Bob Brown led a convoy of vehicles to protest against the proposed coal mine. The protest was criticised by pro-coal lobby groups and is considered a factor in the Queensland voters' swing away from progressive parties in the 2019 Australian federal election.[41] [42]

Greta Thunberg drew international attention to the mine in January 2020, when she called on large German-based industrial corporation Siemens AG (which claimed to be one of the first companies to have pledged to be carbon neutral by 2030) to stop the delivery of railway equipment for the mine.[43] Siemens responded that it "should have been wiser about this project beforehand", but declined to cancel the contract.[44]

Water – rivers and underground sources

Adani had initially planned to use 12,500 megalitres per year from the Belyando River for the Carmichael coal mine.[45] Regarding the reduction on the local water table, the company's Supplementary Environmental Impact Statement stated that "maximum impacts in excess of 300 metres are predicted". Beyond the mine boundary, Adani's groundwater model predicted water table levels to drop "typically between 20 and 50m" and "up to around 4m in the vicinity of the [Carmichael] river".[46] During a hearing in the QLD Land Court, Adani's representatives defended predictions drawn from drilling data, despite allegations of this being insufficient to determine risks of collapses underground that could impact groundwater systems.[47]

Endangered species

The mine site area is home to a number of species, including the yakka skink, ornamental snake, and the waxy cabbage palm. The mine site is home to the largest known community of black throated finches,[48] and the operation of the mine is subject to a Black-Throated Finch Management Plan.[49]

The finches' population is in decline, and the southern subspecies is threatened, having vanished from 80% of its former range.[50] Adani Australia produced a management plan for the finch,[51] proposing to gradually clear land around the mine and force the finches to move away.[52] The plan was heavily criticised by some ecologists, who highlighted the plan to graze cattle on protected land and noted the land was tagged to be used for other projects.[53] There was also a lack of transparency and consultation with experts in the field.[54]

Environmental activism: Stop Adani

The mine drawn criticism for its environmental impacts on the Great Barrier Reef, water usage, and carbon emissions.[55] Since approval for the mine was given by the government in 2014, campaigners have opposed the project with hundreds of rallies and other actions targeting 145 companies, as part of a campaign known as Stop Adani,[56] [57] [58] [59]

Financial issues

In 2015, a number of major international banks publicly ruled out financing the coal mine, railway line or shipping terminal. This included more than half of the top 20 coal financing banks globally,[60] such as Citigroup, JP Morgan Chase, Goldman Sachs, Deutsche Bank, Royal Bank of Scotland, HSBC, Barclays, Credit Agricole and Société Générale. Standard Chartered provided financing to the project, but Adani ended the bank's advisory contract.[61]

Large coal projects in Australia typically engage with one or more of the "big four" Australian banks in arranging or providing debt. However, National Australia Bank announced in September 2015 that it would not fund the project,[62] followed by Westpac in April 2015 and ANZ Bank in August 2017.[63] [64]

Before the mine's construction, some analysts doubted the mine was viable given the price of coal at the time. In November 2014, one analyst predicted that a price of about $100–$110 a tonne was required for the project be financially viable.[65] The price of coal fluctuated significantly over following years; from US$60/t in 2015, then US$115/t in 2018 and US$170/t in May 2021.[66] [67] The company claims that it has agreements in place to sell 10 million tonnes of coal from the mine.[68]

Taxpayer funding

In 2014, the Queensland Liberal National Party state government proposed reduced taxes for the project in the form of an open-ended royalty rate "holiday",[69] and for taxpayers to pay for the sediment dumping facility in the Caley Valley wetlands.[70] The Labor opposition criticised the secrecy surrounding the costs and suggested that up to $1.08 billion of public money would be required.[71]

Following the Queensland Labor Party's victory in the 2015 state election, the Labor party vowed to not use state funds for the railway line,[72] [73] however the party called on the Australian Liberal National government to use federal taxpayer money for the railway line.[74] [75] The federal government considered the proposal,[76] however in the end it was not successful.

In October 2020, the Queensland Labor Party government announced that the royalties deal for the coal mine had been signed.[77] The deal includes deferring royalty payments for an unspecified period.[78]

Indigenous community impacts

Native Title court cases

In 2016, a group of Indigenous landholders launched a case in the Queensland Supreme court against the granting of Adani's mining lease, on the basis that they had not been properly consulted. The court ruled against overturning the mining lease.[79] A 2018 appeal upheld the 2016 decision.[80]

Land use agreements

At a 2017 meeting, the majority of Wangan and Jagalingou (W&J) people present voted to accept the proposed mining rights deal presented by Adani. However, several W&J people have stated that they were paid by Adani to attend, or that their vote against the deal was not counted.[81] The resulting indigenous land use agreement was accepted by 7 of 12 W&J representatives.

A 2019 appeal by the other 5 W&J representatives was dismissed by the Federal Court, with Adani seeking $600,000 in court costs from the W&J representatives.[82]

, members of the Wangan and Jagalingou people continue to occupy a cultural ceremony and camp site near the mine.[83]

Legal issues

2015: Federal EPBC approval (initial case)

In January 2015, the Mackay Conservation Group, challenged the July 2013 federal approval of the Carmichael project by Greg Hunt, Environment Minister, under the Environment Protection and Biodiversity Conservation Act 1999.[84] The Federal Court of Australia case involved three main contentions, that the Minister did not take into account the greenhouse gas emissions, the company's environmental record in India and the "approved conservation advice" for the Yakka Skink and the ornamental snake.[85]

The court set aside the approval due to concerns regarding the yakka skink and ornamental snake, effectively overturning the approval.[86] [87]

Following this decision, the attorney-general at the time, George Brandis, stated his intention to disallow third parties from challenging the minister's approvals under the Environment Protection and Biodiversity Conservation Act 1999.[88] This amendment to the Act did not occur. In October 2015, the coal mine was re-approved by the federal environment minister.[89]

2015-2016: Queensland mining leases and environmental authority

In 2015, the Land Services of Coast and Country (LSCC) group launched a case in the Queensland Land Court challenging the Queensland coordinator-general's Mining Lease and Environmental Authority approvals.[90] LSCC contended the approval was flawed regarding the economic, environmental, and financial impact of the mine. The court's verdict in December 2015 did not overturn the approval, but placed extra environmental requirements on the mine.[91] LSCC applied in 2016 for an appeal in the Supreme Court of Queensland, and this application was unsuccessful.[92]

The mine's claimed economic benefits are a disputed issue.[93]

2016-2017: Federal EPBC approval regarding impacts on Great Barrier Reef

The Australian Conservation Foundation (ACF) made a judicial review challenge under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) in late 2015, arguing that proper procedure was not followed when the Minister did not take into account the impact of emissions on the Great Barrier Reef.

The ACF appealed the decision in the Federal Court of Australia, which was unsuccessful.[94]

The court ruled in favour of the government, based on the argument that only considering the direct emissions from mining operations (and not the emissions caused by the burning of its coal) is a decision at the minister's discretion.[95] The case hinged on a market substitution defence, which has been criticised as "the only significant barrier remaining to a successful climate change case".[96]

2018: Federal EPBC approval- exemption for water usage from the Sutton River

The Australian Conservation Foundation (ACF), represented by Environmental Defenders Office Queensland (EDO), lodged a judicial review challenge in the Federal Court in December 2018 of the Federal Environment Minister's decision to not apply appropriate legislation regarding water.[97]

The review challenged then-Environment Minister Melissa Price's decision to waive a full environmental assessment for water use from the Suttor River in central Queensland. Adani notified the government that the act was a controlled act but the government decided that it was not a controlled activity under the EPBC Act and that no environmental impact assessment (EIS) was needed for it to proceed.[98] [99]

Under amendments to the EPBC Act known as the water trigger, the Minister must obtain advice from an Independent Expert Scientific Committee on Coal Seam Gas and Large Coal Mining Development[100] if an activity is likely to have a significant impact on water resources or impact on a protected ecological communities, species, World Heritage Sites, national heritage sites, or protected wetlands.[101] The water trigger was added to the EPBC Act in 2013 by Tony Windsor.[102]

In June 2019, the application was allowed by consent, meaning the Australian Government would reassess the project’s water use.[103]

2020: Federal EPBC approval- exemption for water pipeline project

In March 2020, the Australian Conservation Foundation (ACF) launched a judicial review application regarding the water pipeline for the project (called the North Galilee Water Scheme Infrastructure Project). The application argued that the water pipeline should require assessment under the EPBC water trigger.

The federal court ruled in favour of the AFC in May 2021, thereby requiring the minister to reconsider the environmental impacts associated with the mine's water pipeline before it is approved.[104]

See also

Notes and References

  1. Web site: Carmichael Coal Mine and Rail Project SEIS Volume 2 – Mine Studies . 13 November 2013 . Adani. https://web.archive.org/web/20160303204155/http://www.adanimining.com/Common/Uploads/SEISDocuments/12_SEISDoc_Volume%202%20Mine%20Studies.pdf. 3 March 2016. dead . dmy-all.
  2. Web site: Expanding the Port of Abbot Point . www.statedevelopment.qld.gov.au . 9 September 2015 . dead . https://web.archive.org/web/20150919231015/http://www.statedevelopment.qld.gov.au/major-projects/expanding-the-port-of-abbot-point.html . 19 September 2015.
  3. Web site: Carmichael Coal Mine and Rail Project. dead. https://web.archive.org/web/20140814155457/http://www.adanimining.com/Australia-Carmichael-coal. 14 August 2014. 2 August 2014. Adani Mining.
  4. News: $16 billion Carmichael coal mine approval set aside over 'technical matter' . ABC News . 5 August 2015 . 9 September 2015 . 25 August 2015 . https://web.archive.org/web/20150825130300/http://www.abc.net.au/news/2015-08-05/federal-court-overturns-approval-of-adanis-carmichael-coal-mine/6673734 . live .
  5. Web site: 2015-10-15. Adani Carmichael mine in Queensland gets another green light from Coalition. 2021-07-19. the Guardian. en. 21 July 2021. https://web.archive.org/web/20210721123627/https://www.theguardian.com/business/2015/oct/15/adani-carmichael-mine-in-queensland-gets-another-green-light-from-coalition. live.
  6. Web site: Carmichael Mine Bravus Mining & Resources. 2021-10-10. Carmichael Mine Bravus Mining & Resources. en. 25 March 2022. https://web.archive.org/web/20220325025450/https://www.bravus.com.au/carmichael-mine/. dead.
  7. Web site: Adani's new mini version of its mega mine still faces some big hurdles . 3 December 2018 . 4 December 2018 . 4 December 2018 . https://web.archive.org/web/20181204022038/http://theconversation.com/adanis-new-mini-version-of-its-mega-mine-still-faces-some-big-hurdles-108038 . live .
  8. Web site: Creagh. Ben. 2019-06-20. Adani starts construction at Carmichael project. 2020-09-10. Australian Mining. en-AU. 2 September 2020. https://web.archive.org/web/20200902201114/https://www.australianmining.com.au/news/adani-starts-construction-at-carmichael-project/. live.
  9. Web site: Moore. Tony. 2020-07-16. Adani on track for first Carmichael mine coal exports in 2021. 2020-09-10. Brisbane Times. en. 8 April 2022. https://web.archive.org/web/20220408161043/https://www.brisbanetimes.com.au/politics/queensland/adani-on-track-for-first-carmichael-mine-coal-exports-in-2021-20200716-p55cnh.html. live.
  10. Web site: Paine . Andy . 2022-10-26 . Frontline Action on Coal FLAC: Ten Years on the Climate Frontline . 2022-11-10 . The Commons Social Change Library . en-AU . 10 November 2022 . https://web.archive.org/web/20221110031951/https://commonslibrary.org/frontline-action-on-coal-flac-ten-years-on-the-climate-frontline/ . live .
  11. April 2019. Mineral Resources (Galilee Basin) Amendment Bill 2018. 56th Parliament, State Development, Natural Resources and Agricultural Industry Development Committee. Report No. 26. 7. 24 September 2020. 23 December 2020. https://web.archive.org/web/20201223215947/https://www.parliament.qld.gov.au/Documents/TableOffice/TabledPapers/2019/5619T567.pdf. live.
  12. Web site: Adani Mining changes name to Bravus in Australia . ABC News . 2 September 2022 . en-AU . 5 November 2020 . 26 December 2022 . https://web.archive.org/web/20221226193234/https://www.abc.net.au/news/2020-11-05/adani-changes-name-to-barvus-mining-and-resources/12851592 . live .
  13. Web site: 2020-11-04. Adani's new mining brand to feature on Cowboys 2021 jersey. 2021-06-23. North Queensland Cowboys. en. 5 June 2021. https://web.archive.org/web/20210605010811/https://www.cowboys.com.au/news/2020/11/05/adanis-new-mining-brand-to-feature-on-cowboys-2021-jersey/. live.
  14. News: 2021-12-29. Opponents fume as Adani celebrates first coal export from Carmichael Mine. en-AU. ABC News. 2022-02-07. 8 August 2023. https://web.archive.org/web/20230808074730/https://www.abc.net.au/news/rural/2021-12-29/adani-ships-first-coal/100729834. live.
  15. Web site: Opponents fume as Adani celebrates first coal export from Carmichael Mine . ABC News . 2 September 2022 . en-AU . 29 December 2021 . 8 August 2023 . https://web.archive.org/web/20230808074730/https://www.abc.net.au/news/rural/2021-12-29/adani-ships-first-coal/100729834 . live .
  16. Web site: Mine location . Adani Mining . 2 August 2014 . https://web.archive.org/web/20140814155455/http://www.adanimining.com/Australia-Mine-location . 14 August 2014 . dead.
  17. Web site: Galilee subregion Bioregional Assessments . 2023-01-20 . www.bioregionalassessments.gov.au . 20 January 2023 . https://web.archive.org/web/20230120103926/https://www.bioregionalassessments.gov.au/assessments/galilee-subregion . live .
  18. MyMinesOnline Maps 3.6.0, Queensland Government, Latitude Geographics Group Ltd., 2015, viewed 21 November 2016, https://minesonlinemaps.business.qld.gov.au/SilverlightViewer/Viewer.html?Viewer=momapspublic
  19. Web site: Carmichael Coal Mine and Rail Project: Project Overview . 9 July 2014 . Completed EIS projects . Department of State Development, Infrastructure and Planning . 2 August 2014 . 18 March 2015 . https://web.archive.org/web/20150318145219/http://dsdip.qld.gov.au/assessments-and-approvals/carmichael-coal-mine-and-rail-project.html . dead .
  20. Web site: adaniaustralia.com.au . www.adaniaustralia.com.au . 9 September 2015. https://web.archive.org/web/20150923140917/http://www.adaniaustralia.com.au/pdf_details.php?pid=58. 23 September 2015. dead.
  21. News: Adani, POSCO E&C sign pact to develop rail line in Australia . Business Standard India . 18 July 2014 . 9 September 2015 . 2 February 2016 . https://web.archive.org/web/20160202212859/http://www.business-standard.com/article/companies/adani-posco-e-c-sign-pact-to-develop-rail-line-in-australia-114071800626_1.html . live .
  22. Web site: 14 September 2018. Adani scales back Carmichael rail link plans. 15 September 2018. Railway Gazette International. 15 September 2018. https://web.archive.org/web/20180915084548/https://www.railwaygazette.com/news/freight/single-view/view/adani-scales-back-carmichael-rail-link-plans.html. live.
  23. Web site: $5 Billion Northern Australia Infrastructure Facility Cash For Mines . 28 September 2015 . 28 October 2017 . 5 May 2016 . https://web.archive.org/web/20160505191523/http://iminco.net/5-billion-northern-australia-infrastructure-facility-cash-for-mines/ . live .
  24. Web site: Setback for Adani as Aurizon withdraws loan request for rail line . The Guardian . 8 February 2018 . 15 September 2018 . 15 September 2018 . https://web.archive.org/web/20180915121901/https://www.theguardian.com/business/2018/feb/09/setback-for-adani-as-aurizon-withdraws-loan-request-for-rail-line . live .
  25. Web site: Haselgrove. Salomae. 2020-06-05. BMD wins largest Adani Carmichael contract yet. 2021-06-15. Australian Mining. en-AU. 16 June 2021. https://web.archive.org/web/20210616043202/https://www.australianmining.com.au/news/bmd-wins-largest-adani-carmichael-contract-yet/. live.
  26. Web site: BMD wins civil construction contract for Carmichael Rail Network from Adani Australia - World Construction Network. 2021-06-23. www.worldconstructionnetwork.com. 3 June 2020. 2 August 2021. https://web.archive.org/web/20210802174447/https://www.worldconstructionnetwork.com/news/bmd-wins-civil-construction-contract-for-carmichael-rail-network-from-adani-australia. live.
  27. Web site: Carmichael Rail Network - Civil works | Martinus Rail . 9 February 2023 . 9 February 2023 . https://web.archive.org/web/20230209034026/https://www.martinusrail.com.au/projects/carmichael-rail-network-civil-works/ . live .
  28. News: Climate activists target Siemens over Australia coal project . Associated Press . 10 January 2020 . . en . 11 January 2020 . 10 January 2020 . https://web.archive.org/web/20200110150020/https://www.washingtonpost.com/world/europe/climate-activists-target-siemens-over-australia-coal-project/2020/01/10/2d3e17a2-338e-11ea-971b-43bec3ff9860_story.html . dead .
  29. News: Germany's Siemens to fulfill Australia coal mine contract . Associated Press . 13 January 2020 . . en . 14 January 2020 . 14 January 2020 . https://web.archive.org/web/20200114042843/https://www.washingtonpost.com/business/germanys-siemens-to-fulfill-australia-coal-mine-contract/2020/01/13/685709f8-35d6-11ea-a1ff-c48c1d59a4a1_story.html . dead .
  30. News: Chen . David . 5 October 2017 . Carmichael mine FIFO workforce to come from Townsville, Rockhampton . en-AU . 2 February 2020 . 10 November 2020 . https://web.archive.org/web/20201110155224/https://www.abc.net.au/news/2017-10-05/adani-carmichael-mine-fifo-workforce-townsville-rockhampton/9017610 . live . https://www.abc.net.au/news/2017-10-05/adani-carmichael-mine-fifo-workforce-townsville-rockhampton/9017610
  31. News: Robertson . Joshua . 19 October 2017 . Queensland councils to pay at least $31m for Adani coalmine airstrip . en-GB . The Guardian . 2 February 2020 . 0261-3077 . 12 January 2020 . https://web.archive.org/web/20200112095608/https://www.theguardian.com/business/2017/oct/20/adani-coalmine-queensland-councils-to-pay-at-least-31m-for-airstrip . live . https://www.theguardian.com/business/2017/oct/20/adani-coalmine-queensland-councils-to-pay-at-least-31m-for-airstrip
  32. News: McGowan . Michael . 17 January 2018 . Queensland councils say they won't own Adani airport despite paying $34m . en-GB . The Guardian . 2 February 2020 . 0261-3077 . 12 January 2020 . https://web.archive.org/web/20200112095608/https://www.theguardian.com/business/2018/jan/17/queensland-councils-say-they-wont-own-adani-airport-despite-paying-34m . live . https://www.theguardian.com/business/2018/jan/17/queensland-councils-say-they-wont-own-adani-airport-despite-paying-34m
  33. News: 16 June 2018 . $18.5 million proposed for Carmichael Airstrip will be used for shovel ready projects . en-AU . Townsville City Council . 2 February 2020 . 12 January 2020 . https://web.archive.org/web/20200112095610/https://www.townsville.qld.gov.au/about-council/news-and-publications/media-releases/2018/june/18.5-million-proposed-for-carmichael-airstrip-will-be-used-for-shovel-ready-projects . live . https://www.townsville.qld.gov.au/about-council/news-and-publications/media-releases/2018/june/18.5-million-proposed-for-carmichael-airstrip-will-be-used-for-shovel-ready-projects
  34. Web site: Plane. Melanie. First Look: Rocky FIFO begins as Adani airstrip complete. 2021-04-21. CQ News. en. 21 April 2021. https://web.archive.org/web/20210421002704/https://www.cqnews.com.au/news/rocky-fifo-begins-as-adani-airstrip-complete/4030921/. live.
  35. Web site: Carmichael Coal Mine and Rail Project State Development, Infrastructure, Local Government and Planning. 2021-10-10. www.statedevelopment.qld.gov.au. 12 November 2020. 11 October 2021. https://web.archive.org/web/20211011000030/https://www.statedevelopment.qld.gov.au/coordinator-general/assessments-and-approvals/coordinated-projects/completed-projects/carmichael-coal-mine-and-rail-project. live.
  36. Web site: 2020-04-22. Martinus wins another Carmichael rail contract with Adani Australia. 2021-06-15. International Mining. en-GB. 16 June 2021. https://web.archive.org/web/20210616043330/https://im-mining.com/2020/04/22/martinus-wins-another-carmichael-rail-contract-adani-australia/. live.
  37. Web site: Zakharia. Nickolas. 2020-11-26. Carmichael coal production 'one step closer': Bravus. 2021-06-15. Australian Mining. en-AU. 28 July 2021. https://web.archive.org/web/20210728111426/https://www.australianmining.com.au/news/carmichael-coal-production-one-step-closer-bravus/. live.
  38. Web site: June 25, 2021. Adani Group strikes coal at Australia's Charmichael project. 2021-06-29. The Times of India. en. 26 June 2021. https://web.archive.org/web/20210626000248/https://timesofindia.indiatimes.com/business/india-business/adani-group-strikes-coal-at-australias-charmichael-project/articleshow/83828952.cms. live.
  39. Web site: 31 July 2023 . Carmichael delivers first 10 million tonnes . 13 December 2023 . Australian Resources & Investment . en-US.
  40. News: Federal court asked to overturn Adani mine approval due to impact on Great Barrier Reef . Lenore Taylor . 21 January 2015 . 14 January 2015 . . 23 January 2015 . https://web.archive.org/web/20150123043356/http://www.theguardian.com/environment/2015/jan/14/federal-court-asked-to-overturn-adani-mine-approval-impact-great-barrier-reef . live .
  41. Web site: 2019-05-19. Election 2019: How Bob Brown and his anti-Adani convoy green-anted Labor in Queensland. 2021-06-09. The New Daily. en-US. 9 June 2021. https://web.archive.org/web/20210609225153/https://thenewdaily.com.au/news/election-2019/2019/05/19/election-2019-how-bob-brown-and-his-anti-adani-convoy-green-anted-labor-in-queensland/. live.
  42. Queensland Mining and Energy Bulletin (April 2019): Industry slams ‘hypocrisy’ of anti mining convoy
  43. News: Bau Australien: Greta Thunberg fordert Siemens zur Aufgabe von Kohle-Projekt auf . Frankfurter Allgemeine Zeitung . 12 January 2020 . de . 0174-4909 . 12 March 2021 . https://web.archive.org/web/20210312072906/https://www.faz.net/aktuell/wirtschaft/klima-energie-und-umwelt/greta-thunberg-fordert-siemens-zur-aufgabe-von-kohle-projekt-in-australien-auf-16576039.html . live .
  44. News: Adani coalmine: Siemens CEO has 'empathy' for environment but refuses to quit contract . Readfearn . Graham . 13 January 2020 . The Guardian . 13 January 2020 . 0261-3077 . 13 January 2020 . https://web.archive.org/web/20200113111747/https://www.theguardian.com/business/2020/jan/13/adani-coalmine-siemens-ceo-has-empathy-for-environment-but-will-honour-contract . live .
  45. Web site: SEIS Appendix 20 – Application to take water from the Belyando River . Adani. https://web.archive.org/web/20160304142308/http://www.adanimining.com/Common/Uploads/SEISDocuments/39_SEISDoc_Appendix%20C4e%20-%20Application%20to%20take%20water%20from%20the%20Belyando%20River.pdf. 4 March 2016. dead . dmy-all.
  46. Web site: Supplementary EIS Documents . https://archive.today/20151020162014/http://www.adanimining.com/seis-pdfdocs-details/50/154. dead. 20 October 2015 . www.adanimining.com . 10 September 2015.
  47. Web site: Groundwater dominates discussion at Adani court case . 10 September 2015 . 7 August 2015 . https://web.archive.org/web/20150807094449/http://www.frasercoastchronicle.com.au/news/groundwater-dominates-discussion-adani-court-case/2601119/ . dead .
  48. Web site: Environment – Queensland's Galilee Basin . 10 September 2015 . 4 March 2016 . https://web.archive.org/web/20160304041440/http://galileebasin.org/the-issues/environment/ . live .
  49. Web site: 2019-05-31. Black-Throated Finch Management Plan approved. 2021-06-09. Department of Environment and Science, Queensland. en-AU. 9 June 2021. https://web.archive.org/web/20210609233706/https://www.des.qld.gov.au/our-department/news-media/mediareleases/2019/2019-05-31-black-throated-finch-mp-approved. live.
  50. Web site: National recovery plan for the Black-throated finch southern subspecies (Poephila cincta cincta) . 25 February 2019 . Department of the Environment, Water, Heritage and the Arts – website . Australian Government: Department of the Environment, Water, Heritage and the Arts . 3 March 2019 . https://web.archive.org/web/20190303154328/http://www.environment.gov.au/system/files/resources/f164f090-6c72-4e29-a91b-0037b82f4250/files/p-cincta.pdf . live .
  51. Web site: 2020-06-24. Adani carves out conservation area for endangered finch. 2021-07-27. InQueensland. en. 27 July 2021. https://web.archive.org/web/20210727233233/https://inqld.com.au/business/2020/06/24/adani-carves-out-conservation-area-for-endangered-black-throated-finch/. live.
  52. Web site: Black-throated Finch Management Plan C . November 2018 . 25 February 2019 . Adani Mining . 5 November 2020 . https://web.archive.org/web/20201105111910/https://www.adaniaustralia.com/-/media/ADI0027_Black-throated-Finch_v11_WEB.pdf . dead .
  53. News: Smee . Ben . Adani: 2,000 hectares of black-throated finch habitat removed from conservation plans . 25 February 2019 . Guardian Online . 22 January 2019 . 24 February 2019 . https://web.archive.org/web/20190224115200/https://www.theguardian.com/business/2019/jan/22/adani-2000-hectares-black-throated-finch-habitat-removed-from-conservation-plans . live .
  54. News: Rebgetz . Louisa . Adani mine 'spinning the roulette wheel' on survival of black-throated finch, researchers say . 25 February 2019 . ABC News . 14 July 2017 . 21 April 2019 . https://web.archive.org/web/20190421162019/https://www.abc.net.au/news/2017-07-14/adani-carmichael-mine-threats-to-black-throated-finch/8707086 . live .
  55. News: Largest coal mine in Australia: federal government gives Carmichael go-ahead . Oliver Milman . 2 August 2014 . 28 July 2014 . . Guardian News and Media . 29 July 2014 . https://web.archive.org/web/20140729120833/http://www.theguardian.com/environment/2014/jul/28/largest-coal-mine-in-australia-federal-government-gives-carmichael-go-ahead . live .
  56. Web site: Gulliver . Robyn . 2022-10-11 . Australian Campaign Case Study: Stop Adani, 2012 - 2022 . 2022-11-10 . The Commons Social Change Library . en-AU . 10 November 2022 . https://web.archive.org/web/20221110031949/https://commonslibrary.org/australian-campaign-case-study-stop-adani-2012-2022/ . live .
  57. Web site: How a 3 year campaign moved Westpac to rule out new coal basins . Stop Adani . 1 August 2018 . 29 May 2024.
  58. Web site: An incredible moment for the #StopAdani campaign. . Free Online Library . 2017 . . 29 May 2024.
  59. Web site: 2017-04-28. Big four banks distance themselves from Adani coalmine as Westpac rules out loan. 2021-07-10. The Guardian. en.
  60. News: Eleven International Banks Rule Out Funding Adani's Coal Project . 2015 . Courier Mail.
  61. Web site: Standard Chartered backs off Adani coal mining project . 11 August 2015 . 9 September 2015 . 13 August 2015 . https://web.archive.org/web/20150813013545/http://www.smh.com.au/business/mining-and-resources/standard-chartered-backs-off-adani-coal-mining-project-20150810-giw4ft.html . live .
  62. News: National Australia Bank rules out funding Adani's Carmichael coal mine . Saunders . Amanda . 3 September 2015 . The Sydney Morning Herald . 15 August 2017 . Potter . Ben . en-US . 3 August 2017 . https://web.archive.org/web/20170803085031/http://www.smh.com.au/business/mining-and-resources/national-australia-bank-rules-out-funding-adanis-carmichael-coal-mine-20150902-gjdsfl.html . live .
  63. News: Westpac has ruled out lending to Adani's Carmichael coal mine after changing lending policies . 28 April 2017 . . 15 August 2017 . en-US . 15 August 2017 . https://web.archive.org/web/20170815135337/http://www.afr.com/business/mining/westpac-rules-out-adani-carmichael-coal-loan-20170428-gvuhp8 . live .
  64. Web site: ANZ effectively rules out funding Adani's Carmichael coalmine . 15 August 2017.
  65. News: Adani steps up Australia coal plans ahead of Modi visit . Reuters . 12 November 2014 . 9 September 2015 . 18 October 2015 . https://web.archive.org/web/20151018004918/http://www.reuters.com/article/2014/11/12/adani-ent-australia-coal-idUSL3N0T126820141112 . live .
  66. News: Bloomberg - Record coal prices. 2021-06-22. Bloomberg. 9 June 2021. 12 June 2021. https://web.archive.org/web/20210612043144/https://www.bloomberg.com/news/articles/2021-06-09/sky-high-coal-prices-won-t-spur-new-mines-in-a-greener-world. live.
  67. Web site: Australia Coal Price. 2021-05-17. ycharts.com. 17 May 2021. https://web.archive.org/web/20210517061656/https://ycharts.com/indicators/australia_coal_price. live.
  68. Web site: 2020-09-17. 'It's happening': digging begins at Adani's $2b Carmichael mine. 2021-06-03. Australian Financial Review. en. subscription. 3 June 2021. https://web.archive.org/web/20210603012132/https://www.afr.com/companies/energy/it-s-happening-digging-begins-at-adani-s-2b-carmichael-mine-20200917-p55wgd. live.
  69. Web site: Hey, big spender: why Campbell Newman loves his election hard-hat . the Guardian . 9 September 2015 . Lenore . Taylor . 9 January 2015 . 21 August 2015 . https://web.archive.org/web/20150821103636/http://www.theguardian.com/australia-news/2015/jan/09/queensland-election-2015-campbell-newman-spending-promises . live .
  70. Web site: Gautam Adani says Queensland to co-invest in Australia project, govt defends SBI loan – Firstpost . 25 November 2014 . 9 September 2015 . 31 December 2014 . https://web.archive.org/web/20141231170938/http://www.firstpost.com/business/corporate-business/gautam-adani-says-queensland-to-co-invest-in-australia-project-govt-defends-sbi-loan-1997241.html . live .
  71. Web site: Rail line deal could cost taxpayers $1 billion-plus " Curtis Pitt MP ::: State Member for Mulgrave . 9 September 2015 . 29 February 2016 . https://web.archive.org/web/20160229222743/http://www.curtispitt.com.au/2014/11/19/rail-line-deal-could-cost-taxpayers-1-billion-plus/ . live .
  72. Web site: Adani underlines commitment to Galilee Basin coal mine plans . ABC News . 21 January 2015 . 9 September 2015 . 9 October 2015 . https://web.archive.org/web/20151009142627/http://www.abc.net.au/news/2015-01-21/adani-underlines-commitment-to-galilee-basin-coal/6031288 . live .
  73. Web site: Queensland Labor backs Adani's Carmichael coal project . July 2015 . 9 September 2015 . 4 July 2015 . https://web.archive.org/web/20150704215513/http://www.smh.com.au/business/mining-and-resources/queensland-labor-backs-adanis-carmichael-coal-project-20150701-gi2gju.html . live .
  74. News: Raggatt. Tony. 5 September 2015. State won't say why it wants federal funding for coal project. Townsville Bulletin. live. 9 September 2015. https://archive.today/20120707123728/http://autobus.cyclingnews.com/road/2007/feb07/california07/?id=results/california073. 7 July 2012.
  75. Web site: Creagh. Ben. 2018-02-04. Federal minister says no funding for Adani rail line. 2021-06-23. Australian Mining. en-AU. 24 June 2021. https://web.archive.org/web/20210624205000/https://www.australianmining.com.au/news/govt-minister-says-no-federal-funding-for-adani-rail-line/. live.
  76. Web site: Abbott government hints Adani could be considered for rail funding . 24 August 2015 . 9 September 2015 . 26 August 2015 . https://web.archive.org/web/20150826195147/http://www.smh.com.au/federal-politics/political-news/abbott-government-hints-adani-could-be-considered-for-rail-funding-20150824-gj6ci9.html . live .
  77. Web site: 2020-10-01. Qld government finalises Adani royalties deal before state election. 2021-04-21. Australian Financial Review. en. 21 April 2021. https://web.archive.org/web/20210421055223/https://www.afr.com/companies/mining/qld-government-finalises-adani-royalties-deal-before-state-election-20201001-p5611o. live.
  78. Web site: 2020-10-01. Queensland Government allows Adani to defer coal mining royalties and isn't saying for how long. 2021-06-23. www.abc.net.au. en-AU. 16 August 2021. https://web.archive.org/web/20210816001347/https://www.abc.net.au/news/2020-10-01/adani-carmichael-coal-mine-royalties-deferred-qld-election/12716272. live.
  79. Web site: StackPath. 2021-06-09. www.sclqld.org.au. 9 June 2021. https://web.archive.org/web/20210609231234/https://www.sclqld.org.au/caselaw/QSC/2016/273. live.
  80. Web site: Burragubba v Minister for Natural Resources and Mines [2018] 2 Qd R 93 Queensland Reports Caselaw]. 2021-06-09. www.queenslandjudgments.com.au. en-US. 9 June 2021. https://web.archive.org/web/20210609231235/https://www.queenslandjudgments.com.au/case/id/512665?mview=adani%7C&u=. live.
  81. Web site: Adani accused of paying people to stack its meeting on crucial mine deal . www.abc.net.au . 17 October 2021 . en-AU . 1 December 2017 . 17 October 2021 . https://web.archive.org/web/20211017015303/https://www.abc.net.au/news/2017-12-02/adani-accused-of-paying-people-to-stack-meeting-on-deal/9218246 . live .
  82. Web site: 2019-07-12. Adani land-use agreement: court dismisses Indigenous group's appeal. 2021-07-27. the Guardian. en. 28 July 2021. https://web.archive.org/web/20210728071737/https://www.theguardian.com/environment/2019/jul/12/adani-land-use-agreement-court-dismisses-indigenous-groups-appeal. live.
  83. Stünzner, Inga Wangan and Jagalingou traditional owners use human rights law to occupy Bravus's Carmichael Coal Mine ABC News, 28 August, 2022. Retrieved 28 August, 2022.
  84. News: Mackay Conservation Group challenges Adani mine in Federal Court . The Age . 15 January 2015 . 10 September 2015 . Jorge . Branco . 5 September 2017 . https://web.archive.org/web/20170905070522/http://www.theage.com.au/queensland/mackay-conservation-group-challenges-adani-mine-in-federal-court-20150115-12qwnp.html . live .
  85. Web site: ENVIRONMENT PROTECTION AND BIODIVERSITY CONSERVATION ACT 1999 – SECT 139 Requirements for decisions about threatened species and endangered communities . www5.austlii.edu.au . 10 September 2015 . 26 April 2015 . https://web.archive.org/web/20150426040354/http://www.austlii.edu.au/au/legis/cth/consol_act/epabca1999588/s139.html . live .
  86. Web site: Federal Court overturns approval of Adani Carmichael coal mine in Queensland . 5 August 2015 . 10 September 2015 . 20 September 2015 . https://web.archive.org/web/20150920084630/http://www.smh.com.au/business/mining-and-resources/federal-court-overturns-approval-of-adani-carmichael-coal-mine-in-queensland-20150805-girtz9.html . live .
  87. Web site: Federal Court intervenes over Adani 'lawfare' . 19 August 2015 . 10 September 2015 . 18 September 2015 . https://web.archive.org/web/20150918171909/http://www.afr.com/news/federal-court-intervenes-over-adani-lawfare-20150819-gj2w2q . live .
  88. Web site: 18 August 2015—Government acts to protect jobs from vigilante litigants . www.attorneygeneral.gov.au . 9 September 2015. https://web.archive.org/web/20150823020319/http://www.attorneygeneral.gov.au/Mediareleases/Pages/2015/ThirdQuarter/18-August-2015-Government-acts-to-protect-jobs-from-vigilante-litigants.aspx. 23 August 2015. dead.
  89. Web site: Lucas. Adam. Froome. Craig. Lake. Katherine. Molyneaux. Lynette. Currell. Matthew. Hepburn. Samantha. Greg Hunt approves Adani's Carmichael coal mine, again: experts respond. 2021-08-03. The Conversation. 15 October 2015. en. 3 August 2021. https://web.archive.org/web/20210803015034/https://theconversation.com/greg-hunt-approves-adanis-carmichael-coal-mine-again-experts-respond-49227. live.
  90. Web site: Carmichael Coal Mine and Rail Coordinator General's Report . May 2014 . 1 September 2016 . 4 March 2016 . https://web.archive.org/web/20160304122816/http://www.statedevelopment.qld.gov.au/resources/project/carmichael/carmichael-coal-mine-and-rail-cg-report-may2014.pdf . dead .
  91. Web site: Adani Mining Pty Ltd v Land Services of Coast and Country Inc [2015] QLC 48 Queensland Land Court Caselaw]. 2021-06-09. www.queenslandjudgments.com.au. en-US. 9 June 2021. https://web.archive.org/web/20210609232409/https://www.queenslandjudgments.com.au/caselaw/qlc/2015/48. live.
  92. Web site: StackPath. 2021-06-03. archive.sclqld.org.au. 19 April 2021. https://web.archive.org/web/20210419051203/https://archive.sclqld.org.au/qjudgment/2016/QSC16-272.pdf. live.
  93. Molyneaux . L. . Wagner . L. . Foster . J. . April 2016 . Rural electrification in India: Galilee Basin coal versus decentralised renewable energy micro grids . Renewable Energy . 89 . 422–436 . 10.1016/j.renene.2015.12.002 . 10072/99379 . 109825290 . free . 12 December 2019 . 12 January 2020 . https://web.archive.org/web/20200112065112/https://mpra.ub.uni-muenchen.de/65285/1/MPRA_paper_65285.pdf . live .
  94. News: Hepburn. Samantha. Why aren't Australia's environment laws preventing widespread land clearing?. en. The Conversation. 3 December 2018. 3 December 2018. https://web.archive.org/web/20181203152207/https://theconversation.com/why-arent-australias-environment-laws-preventing-widespread-land-clearing-92924. live.
  95. Web site: Australian Conservation Foundation Incorporated v Minister for the Environment [2016] FCA 1042 ]. 3 December 2018 . 15 May 2018 . https://web.archive.org/web/20180515005817/http://www.judgments.fedcourt.gov.au/judgments/Judgments/fca/single/2016/2016fca1042 . live .
  96. News: Carmichael mine jumps another legal hurdle, but litigants are making headway . Bell-James . Justine . 26 November 2016 . The Conversation . 2 February 2020 . en . 27 May 2020 . https://web.archive.org/web/20200527164608/https://theconversation.com/carmichael-mine-jumps-another-legal-hurdle-but-litigants-are-making-headway-69423 . live .
  97. Web site: Adani faces new hurdle over huge water plan in drought-ravaged Queensland . Hasham . Nicole . 4 December 2018 . The Sydney Morning Herald . en . 4 December 2018 . 4 December 2018 . https://web.archive.org/web/20181204134951/https://www.smh.com.au/politics/federal/adani-faces-new-hurdle-over-huge-water-plan-in-drought-ravaged-queensland-20181204-p50k3s.html . live .
  98. News: Explainer: What is the 'water trigger'? . Environmental Defenders Office Queensland (EDO Qld) . 31 August 2020 . 26 September 2020 . https://web.archive.org/web/20200926153035/https://www.edo.org.au/2018/11/13/explainer-what-is-the-water-trigger/ . live .
  99. Web site: Court challenge launched over minister's 'flawed' decision on Adani water trigger . Cox . Lisa . 4 December 2018 . the Guardian . en . 4 December 2018 . 4 December 2018 . https://web.archive.org/web/20181204085422/https://www.theguardian.com/environment/2018/dec/04/court-challenge-launched-over-ministers-flawed-decision-on-adani-water-trigger . live .
  100. Web site: Environment Protection and Biodiversity Conservation Amendment (Independent Expert Scientific Committee on Coal Seam Gas and Large Coal Mining Development) Act 2012 . Federal Register of Legislation . 26 October 2012 . 31 August 2020 . 13 May 2021 . https://web.archive.org/web/20210513153851/https://www.legislation.gov.au/Details/C2012A00145 . live .
  101. News: Adani coal mine water licence faces Federal Court challenge over move to bypass EIS . 4 December 2018 . ABC News . 4 December 2018 . en-AU . 4 December 2018 . https://web.archive.org/web/20181204113253/https://www.abc.net.au/news/2018-12-04/adani-water-licence-acf-court-challenge/10582602 . live .
  102. News: Farmers say water trigger amendment gives confidence . Herbert . Lisa . 20 June 2013 . ABC Rural . 4 December 2018 . en-AU . 22 November 2017 . https://web.archive.org/web/20171122041533/http://www.abc.net.au/news/rural/2013-06-20/water-trigger-nsw/4767602 . live .
  103. Web site: 2019-06-12. Adani coalmine: minister loses legal challenge on water pipeline assessment. 2021-08-03. the Guardian. en. 3 August 2021. https://web.archive.org/web/20210803015707/https://www.theguardian.com/environment/2019/jun/12/adani-coalmine-federal-government-loses-legal-challenge-on-water-assessment. live.
  104. Web site: Environmental Law Australia Carmichael Coal ("Adani") Mine cases in the Federal Court. 2021-08-03. en-AU. 30 November 2018. https://web.archive.org/web/20181130042430/http://envlaw.com.au/carmichael-coal-mine-federal-court/. live.