Ada Foah Wave Farm | |
Country: | Ghana |
Status: | O |
Commissioned: | 2016 |
Owner: | TC's Energy |
Wave Technology: | PA |
Wave Water Body: | South Atlantic Ocean |
Ps Units Planned: | 100 MW |
Ps Electrical Capacity: | 400 KW |
The Ada Foah Wave Farm is Africa's first wave farm commissioned in Ada Foah, Ghana. The wave farm pilot project was developed by Swedish company Seabased.[1] On 20 March 2018, Seabased signed a contract with Ghanaian renewable energy developer TC's Energy to expand the project to .[2] [3]