Aarhus Letbane Explained

Aarhus Letbane
Type:Light rail
Status:Operational. More lines under planning
Locale:Central Denmark Region
Stations:51 [1]
Routes:2 operational, 4 planned
Open:21 December 2017
Owner:Aarhus Municipality (50 %)
Central Denmark Region (50 %) [2]
Operator:Midttrafik
Linelength Km:110[3]
Tracks:2 (Aarhus H–Lystrup via Lisbjerg)
1 (otherwise)
Electrification:750 V DC OHLE
Speed Km/H:100
Website:Midtrafik Letbane (operator)
Aarhus Letbane (construction project)
Map Name:Map
Map State:show

The Aarhus Letbane (Aarhus light rail) is a light rail system in the city of Aarhus, Denmark. It is operated by the company Midttrafik.[4] The first line opened in December 2017, but the system is under continuous development and expansion. Service on the intercity section Odder to Lisbjergskolen opened on August 25, 2018. A third intercity line to Grenå opened on 30 April 2019. More lines are being planned.

On 8 May 2012, the Danish Parliament approved the construction of the first line; work to build Phase 1 commenced during September 2013.[5] It was originally planned to open in August 2016, but this was delayed, in part due to legislative issues in relation to railway safety.

Two types of rolling stock have been operated over the first line, conventional trams which are slower and restricted to only running along some parts of the route and hybrid tram-trains that can be operated on the conventional heavy rail network, the latter being used for the long-distance services.

The Aarhus Letbane was the only operational light rail system in Denmark[6] [7] until the Odense Letbane opened on 28 May 2022.[8] [9] Denmark's third Light Rail project, the Greater Copenhagen Light Rail, is currently under construction.[10]

History

Background

The development of a light rail system around Aarhus, the second biggest city in Denmark, was originally proposed as early as 2006. In response to rising interest in the concept, during January 2009, the Danish Parliament granted an allocation of DKK500 million ($85 million) to support the light rail project as part of a wider green transport package.

During October 2010, work commenced upon several studies.[11] According to transport authority Midttrafik, who later operated the completed network, the Aarhus light rail programme had drawn considerable inspiration from tram-train operations on the tram network in Kassel, Germany. In addition, consultancy firms COWI A/S and SYSTRA contributed their own studies and technical support for the project, including an initial feasibility study and development of tender documentation. The project's Environmental Impact Assessment (EIA) report was produced by C. F. Moller; it was estimated that establishing the light rail network would result in annual energy savings of 47 gigawatts and reduce carbon dioxide emissions by 73t during each year of operation.[11]

Various different approaches for the network were being considered at one stage, including the full electrification of the route, the procurement of a combination of 750 V DC trams and electro-diesel tram-trains. It was recognised that, if the option of full electrification was to be exercised, a catenary-free system may be chosen for the harbour-side element of Phase 1. By late 2012, it had already been decided that Germany's BOStrab light rail regulations would be applied to the tentative network, while Lloyd's Register was appointed to serve as the independent safety assessor. By mid-2012, construction activity was scheduled to begin during June 2013, while the light rail network's opening was planned to occur during August 2016.

On 8 May 2012, the Danish Parliament gave its approval for the construction of the Aarhus light rail line, which would be the first such modern line in Denmark, and granted the legal powers to proceed with the initiative. As a consequence, the Aarhus Letbane joint venture between the local municipality, the Ministry of Transport and the Midtjylland region was formally established to promote and further the project during August 2012.[11] The construction of Phase 1 has been estimated to have cost DKK 2.4 billion ($408 million); financing was provided by the City of Aarhus (47.2 per cent), the Danish central government (47 per cent) and the Central Denmark Region (5.8 per cent). Additionally, the European Investment Bank provided DKK14.2 million to the initiative as part of the European Commission’s European Local Energy Assistance programme (ELENA).[11] [12]

The competitive tendering process for the network's construction was launched shortly after the formation of the joint venture. The contracts for the construction of Aarhus light rail line were awarded in three separate packages; these included a negotiated design-and-build contract that covered both the railway systems and rolling stock, valued at between €150 million and €180 million, along with a pair of lower value contracts to build the related civil works for the line. During July 2014, a German-Italian consortium, comprising Stadler Rail and Ansaldo STS, was awarded the contract for the construction and outfitting of Phase 1 of the Aarhus light rail. Stadler supplied the rolling stock for the line while Ansaldo STS provided the associated infrastructure, such as the tracks, signalling systems, control centre, and maintenance facility.[11] [13]

Phase 1

Phase 1 is a double-track tramway running from Aarhus H station, via Skejby and Lisbjerg to Lystrup. The line forms a loop spanning across Aarhus' city centre, linking into the existing regional railways running to Odder in the south and Grenaa in the northeast; to facilitate such operations, the existing Odderbanen railway from Aarhus to Odder and Grenaabanen to Grenaa has been adapted to accommodate tram-train services.[11] The two existing local lines have been electrified and adapted in other ways to Phase 1, but these alterations have not involved any change to their alignment. Furthermore, the heavy rail station at Aarhus, along with existing park and ride facilities near major stops along the route have been refurbished.[11]

Various pieces of infrastructure and civil works were performed during the construction phase of the project.[11] During October 2014, work commenced on the boring of a pair of tunnels to carry the tramway between Aarhus University and Aarhus University Hospital in Nørrebrogade. In the following year, both the Randers Way and Nørrebro Street had to be reduced in width in order to allocate space between the lanes for the installation of the new double-track line.[11] In total, eight bridges had to be constructed during Phase 1; of these, the bridge over the Egaa valley, possessing a length of, is the largest bridge to be built in the programme.[11] Overall, Phase 1 is to have a total of long and serve 51 stops once it has been completed.[14]

The opening of Phase 1 was originally scheduled to occur on 23 September 2017;[15] however, the event was cancelled only a few hours before the event as a result of missing security clearances from the Danish government authority.[16] Accordingly, the opening date was pushed back to the following month,[17] before being further delayed thereafter. It was said that both the government and the city were inexperienced with tramway operation, since no tramways existed in Denmark 1972–2017, resulting in problems in interpreting the rules. Especially for the old lines, it was unclear whether they could be grandfathered or must obey rules for new lines. On 20 December 2017, it was announced that approval for the new lines had finally been issued, allowing for services on the central tram section to commence during the following day.[18] Traffic on Odderbanen and to Lisbjergskolen was delayed more and started on 25 August 2018. Traffic to Grenaa opened on 30 April 2019.[19]

Future

Even prior to work commencing on Phase 1, several expansion plans had already been mooted. During January 2018, it was publicly stated that options for the construction of two new branches, from Lisbjerg to Hinnerup and from Aarhus to Brabrand, were in the detailed planning phase.[20]

Rolling stock

From an early stage in the project, it became clear that two different types of rolling stock will be required; to service the city center areas, conventional trams capable of up to were recommended, while hybrid tram-trains capable of a maximum speed of would be necessary to conduct the longer distance routes.[21] Accordingly, contracts have been signed with Swiss rolling stock manufacturer Stadler for the delivery of two types of trams for the network:[22] [23]

Passenger numbers

Yearly and quarterly passenger numbers[24] [25]
Year 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Yearly total
2019 1,155,732 1,078,250 1,195,476 1,358,837 4,788,295
2020 1,145,088 672,821 908,100 907,588 3,588,597
2021 580,619 970,400 1,085,755 1,341,822 3,978,596
2022 1,228,418 1,365,131 1,512,101 1,368,871 5,474,521
2023 1,413,906 1,301,629 1,474,186 1,572,372 5,762,063
2024 1,590,327 1,644,588 N/A N/A 3,234,915

In June of 2024, the local Århus Stiftstidende newspaper released the official passenger numbers for all stations on Aarhus Letbane for the first quarter of 2024[26]

Individual station's passenger numbers for January, February and March of 2024
Station Total passenger number Average daily passenger number Lines served
28,532 313.5 L1
2,904 31.9 L1
4,059 44.6 L1
9,600 105.5 L1
21,959 241.3 L1
4,009 44 L1
10,200 112 L1
25,003 274.7 L1
12,030 132.2 L1
23,825 261.8 L1
25,204 276.9 L1
4,286 47.1 L1
69,694 765.8 L1, L2
33,226 365.1 L1
21,310 234.2 L1
7,489 82.3 L1
22,948 251.2 L1
3,645 40 L2
2,409 26.5 L2
14,622 160.7 L2
12,196 134 L2
6,489 71.3 L2
4,721 51.9 L2
9,983 109.7 L2
108,178 1188.7 L2
47,537 522.4 L2
38,212 419.9 L2
51,016 560.6 L2
36,132 397 L2
52,859 580.8 L2
81,417 894.7 L2
26,721 293.6 L2
79,489 873.5 L2
73,771 810.6 L1, L2
74,133 814.6 L1, L2
340,893 3746.1 L1, L2
5,736 63 L2
44,592 490 L2
21,057 231.4 L2
4,718 51.8 L2
17,036 187.2 L2
21,405 235.2 L2
6,400 70.3L2
3,818 41.9 L2
25,598 281.3 L2
573 6.3 L2
7,824 86 L2
13,215 145.2 L2
941 10.3 L2
4,857 53.3 L2
21,888 240.5 L2

In February of 2023, Århus Stiftstidende released the official passenger numbers for all stations on Aarhus Letbane, except Trustrup. These numbers are the daily average of passengers boarding at each respective station on weekdays from the 15th of August 2022 to the 18th of December 2022. See below for each stations passenger numbers.

Central Tramway (L2 line : Aarhus H - Universitetshospitalet - Lisbjergskolen/Lystrup) on weekdays from August to December 2022[27]
Station Passenger Number
4409
983
1079
1055
405
1075
627
451
631
442
608
1233
96
41
71
136
106
30
43
915
Odder line (L2 line : Aarhus H - Odder) on weekdays from August 2022 to December 2022[28]
Station Passenger Number
4409
81
678
314
69
244
339
92
79
413
13
144
207
15
80
404
Grenaa line (L1 line : Aarhus H - Torsøvej - Grenaa) on weekdays from August 2022 to December 2022[29]
Station Passenger Number
4409
983
1079
274
118
231
337
915
64
319
295
167
386
140
67
334
148
No data published
39
479

See also

External links

Notes and References

  1. Web site: https://archive.today/20161224153708/http://www.letbanen.dk/om-letbanen/ . 24 December 2016 . Letbanen binder Aarhusområdet sammen . dead .
  2. Web site: Organisation.
  3. Web site: Om Letbanen. 2019-04-01. Aarhus Letbane. da.
  4. Web site: Letbanen. Midttraffik. 31 January 2017.
  5. News: Aarhus tram-train project gets the go-ahead . 10 May 2012 . Railway Gazette International.
  6. Web site: Aarhus Letbane åbner torsdag den 21. december.
  7. The Copenhagen Metro is categorised as Light Metro
  8. Web site: 2022-05-28 . Efter 6 store nedture: Nu kan du endelig hoppe på Odense Letbane . 2022-05-31 . DR . da.
  9. Web site: 2022-05-31T08:21:00 . Celebrations as Odense tramway opens . 2022-05-31 . Railway Gazette International . en.
  10. Web site: Følg byggeriet . 2022-05-31 . Hovedstadens Letbane . da-DK.
  11. https://www.railway-technology.com/projects/aarhus-light-rail-project-aarhus/ "Aarhus Light Rail Project, Aarhus."
  12. Benabdelaziz-Tair, Fatima. "Energy efficiency: Trams gain traction in Denmark." European Investment Bank, 4 May 2017.
  13. https://www.intelligenttransport.com/transport-news/14379/german-italian-consortium-signs-contract-for-the-first-lrt-system-in-denmark/ "German-Italian consortium signs contract for the first LRT-system in Denmark."
  14. Web site: Om Letbanen [About the Lightrail] ]. da . letbanen.dk . 31 January 2017 . https://archive.today/20140411153807/http://www.letbanen.dk/om-letbanen/ . 11 April 2014 . dead .
  15. http://www.metro-report.com/news/single-view/view/aarhus-light-rail-to-open-in-september.html "Aarhus light rail to open in September."
  16. News: Hecklen . Alexander . Letbanedirektør har kendt til manglende godkendelse i tre dage . 26 September 2017 . DR.dk . 22 September 2017.
  17. News: After embarrassing setback, Aarhus light rail gets new opening date… maybe . 27 September 2017 . The Local . 27 September 2017.
  18. http://www.metro-report.com/news/single-view/view/aarhus-opens-denmarks-first-modern-light-rail-line.html "Aarhus opens Denmark’s first modern light rail line."
  19. https://www.letbanen.dk/nyheder/nyheder/2019/grenaa-driftsstart/ Letbanen åbner for passagerdrift til Grenaa 30. april
  20. http://www.letbanen.dk/udbygning/mere-om-udbygning/planlaegning-af-nye-letbaneetaper/ "Planlægning af nye etaper."
  21. Barrow, Keith. "Aarhus tram-train design revealed." railjournal.com, 1 June 2015.
  22. http://www.letbanen.dk/nyheder/2014/17-togleverandoer/ "AARHUS KØBER SAMME LETBANETOG SOM BERGEN (Danish)."
  23. https://wwwstadlerrailcom-live-01e96f7.s3-eu-central-1.amazonaws.com/filer_public/2d/13/2d13600e-f473-4b47-95fe-0ab17fbcfcd8/2016_0921_medienmitteilung_innotrans_variobahn_en.pdf "Stadler presents the first Variobahn for Aarhus (Denmark)."
  24. https://www.letbanen.dk/nyheder/2024/aarhus-letbane-saetter-ny-passagerrekord/ (In Danish)
  25. https://www.letbanen.dk/om-letbanen/letbanen-i-tal/passagertal/ (In Danish)
  26. Web site: 2024-06-02 . Passagererne strømmer ind i letbanetogene - her er listen over de mest og mindst travle stationer på Aarhus Letbane stiften.dk . 2024-06-03 . stiften.dk . da . 2024-06-02.
  27. https://stiften.dk/aarhus/passagermangel-var-ved-at-lukke-letbanestationer-nu-er-der-gaaet-ni-aar-og-det-ser-stadig-slemt-ud-se-tallene Tidligere lukningstruede letbanestationer har stadig få passagerer
  28. https://stiften.dk/aarhus/passagermangel-var-ved-at-lukke-letbanestationer-nu-er-der-gaaet-ni-aar-og-det-ser-stadig-slemt-ud-se-tallene Tidligere lukningstruede letbanestationer har stadig få passagerer
  29. https://stiften.dk/aarhus/passagermangel-var-ved-at-lukke-letbanestationer-nu-er-der-gaaet-ni-aar-og-det-ser-stadig-slemt-ud-se-tallene Tidligere lukningstruede letbanestationer har stadig få passagerer